This paper analyzes a problem processing mechanism in a new collaboration system between the main manufacturer and the supplier in the"main manufacturer-supplier"mode,which has been widely applied in the col...This paper analyzes a problem processing mechanism in a new collaboration system between the main manufacturer and the supplier in the"main manufacturer-supplier"mode,which has been widely applied in the collaborative development management of the complex product.This paper adopts the collaboration theory,the evolutionary game theory and numerical simulation to analyze the decision-making mechanism where one upstream supplier and one downstream manufacturer must process an unpredicted problem without any advance contract in common.Results show that both players'decision-makings are in some correlation with the initial state,income impact coefficients,and dealing cost.It is worth noting that only the initial state influences the final decision,while income impact coefficients and dealing cost just influence the decision process.This paper shows reasonable and practical suggestions for the manufacturer and supplier in a new collaboration system for the first time and is dedicated to the managerial implications on reducing risks of processing problems.展开更多
Collaborative design is recommended to solve multiphysics problems (MPPS). Firstly, mathematical model of MPPS is constructed and solved by a proposed partitioned method, analysis of which suggests that collaborativ...Collaborative design is recommended to solve multiphysics problems (MPPS). Firstly, mathematical model of MPPS is constructed and solved by a proposed partitioned method, analysis of which suggests that collaborative design be feasible to solve MPPS. As the key technology of col-laborative design of MPPS, a task collaboration algorithm is then proposed. To develop the applica-tion framework of collaborative design, applied unified process(AUP) is proposed based on rational unified process(RUP). Then AUP is used to develop the collaborative design platform, whose function framework is constructed according to the process of project management. Finally three MPPS are solved on this platform and the results suggest that the proposed model, algorithm and framework be feasible.展开更多
The flexible job shop scheduling problem(FJSP),which is NP-hard,widely exists in many manufacturing industries.It is very hard to be solved.A multi-swarm collaborative genetic algorithm(MSCGA)based on the collaborativ...The flexible job shop scheduling problem(FJSP),which is NP-hard,widely exists in many manufacturing industries.It is very hard to be solved.A multi-swarm collaborative genetic algorithm(MSCGA)based on the collaborative optimization algorithm is proposed for the FJSP.Multi-population structure is used to independently evolve two sub-problems of the FJSP in the MSCGA.Good operators are adopted and designed to ensure this algorithm to achieve a good performance.Some famous FJSP benchmarks are chosen to evaluate the effectiveness of the MSCGA.The adaptability and superiority of the proposed method are demonstrated by comparing with other reported algorithms.展开更多
基金supported by the National Natural Science Foundation of China(7117111271502073)。
文摘This paper analyzes a problem processing mechanism in a new collaboration system between the main manufacturer and the supplier in the"main manufacturer-supplier"mode,which has been widely applied in the collaborative development management of the complex product.This paper adopts the collaboration theory,the evolutionary game theory and numerical simulation to analyze the decision-making mechanism where one upstream supplier and one downstream manufacturer must process an unpredicted problem without any advance contract in common.Results show that both players'decision-makings are in some correlation with the initial state,income impact coefficients,and dealing cost.It is worth noting that only the initial state influences the final decision,while income impact coefficients and dealing cost just influence the decision process.This paper shows reasonable and practical suggestions for the manufacturer and supplier in a new collaboration system for the first time and is dedicated to the managerial implications on reducing risks of processing problems.
文摘Collaborative design is recommended to solve multiphysics problems (MPPS). Firstly, mathematical model of MPPS is constructed and solved by a proposed partitioned method, analysis of which suggests that collaborative design be feasible to solve MPPS. As the key technology of col-laborative design of MPPS, a task collaboration algorithm is then proposed. To develop the applica-tion framework of collaborative design, applied unified process(AUP) is proposed based on rational unified process(RUP). Then AUP is used to develop the collaborative design platform, whose function framework is constructed according to the process of project management. Finally three MPPS are solved on this platform and the results suggest that the proposed model, algorithm and framework be feasible.
基金supported by the National Key R&D Program of China(2018AAA0101700)the Program for HUST Academic Frontier Youth Team(2017QYTD04).
文摘The flexible job shop scheduling problem(FJSP),which is NP-hard,widely exists in many manufacturing industries.It is very hard to be solved.A multi-swarm collaborative genetic algorithm(MSCGA)based on the collaborative optimization algorithm is proposed for the FJSP.Multi-population structure is used to independently evolve two sub-problems of the FJSP in the MSCGA.Good operators are adopted and designed to ensure this algorithm to achieve a good performance.Some famous FJSP benchmarks are chosen to evaluate the effectiveness of the MSCGA.The adaptability and superiority of the proposed method are demonstrated by comparing with other reported algorithms.