期刊文献+
共找到610篇文章
< 1 2 31 >
每页显示 20 50 100
Milestone progress of the HEPS booster commissioning
1
作者 Yue-Mei Peng Jian-She Cao +20 位作者 Jin-Hui Chen Hai-Yi Dong Ping He Yi Jiao Ling Kang Wen Kang Jian Li Jing-Yi Li Guo-Ping Lin Fang Liu Feng-Li Long Cai Meng Xin Qi Hua-Min Qu Yan-Feng Sui Sheng Wang Gang Xu Qiang Ye Jing Zhang Pei Zhang Wei-Min Pan 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2024年第1期170-177,共8页
The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the ... The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring.The full-energy beam could be injected to the storage ring directly or after“high-energy accumulation.”On November 17,2023,the key booster parameters successfully reached their corresponding target values.These milestone results were achieved based on numerous contributions,including nearly a decade of physical design,years of equipment development and installation,and months of beam commissioning.As measured at the extraction energy of 6 GeV,the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm rad with a single-bunch charge of 5.58 nC,compared with the corresponding target values of 6.6 mA and 35 nm rad,respectively.This paper presents the physical design,equipment development,installation,and commissioning process of the HEPS booster. 展开更多
关键词 High energy photon source BOOSTER Beam commissioning
下载PDF
Science and Technology Commissioners Supporting High-Quality Development Project for Hundreds of Counties, Thousands of Towns, and Myriads of Villages in the Context of Rural Revitalization
2
作者 Wenwen WEI Cuihong YANG Xiguang ZHU 《Asian Agricultural Research》 2024年第4期1-2,7,共3页
This paper discusses the important role of science and technology commissioners in the high-quality development of hundreds of counties,thousands of towns,and myriads of villages in the context of rural revitalization... This paper discusses the important role of science and technology commissioners in the high-quality development of hundreds of counties,thousands of towns,and myriads of villages in the context of rural revitalization,including building bridges,accelerating the transformation of achievements,promoting the value-added of the whole agricultural industry chain,and promoting the rapid development of rural industrial economy.It also discusses the working achievements of science and technology commissioners,in order to promote further development of rural revitalization in Guangdong Province. 展开更多
关键词 SCIENCE and TECHNOLOGY commissionERS Hundreds of counties thousands of TOWNS and myriads of VILLAGES SCIENCE and TECHNOLOGY support
下载PDF
Commissioning and operation of the cryostat for 3W1 SC wiggler
3
作者 Miao-Fu Xu Xiang-Zhen Zhang +7 位作者 Rui Ye Jin-Can Wang Xiao-Juan Bian Yao Gao Min-Xian Li Fu-San Chen Xiao-Chen Yang Rui Ge 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2023年第6期43-54,共12页
A 3W1 superconducting wiggler(SCW)with the pole gap of 68 mm was successfully tested and installed in a BEPC II storage ring in November,2019.The goal of zero liquid helium consumption was achieved,and the cryogenic s... A 3W1 superconducting wiggler(SCW)with the pole gap of 68 mm was successfully tested and installed in a BEPC II storage ring in November,2019.The goal of zero liquid helium consumption was achieved,and the cryogenic system exhibited a 12%residual cooling capacity(approximately 0.69 W@4.2 K).The 3W1-SCW was set to operate at 2.49 T and has been operating for more than seven months.Three instances of magnet quenching occurred during the normal operation.The evaporated helium gas can be recycled to the helium gas recycling system when the pressure in the helium tank is higher than the parameter value(the setpoint of the pressure value is 1.2 bara).The cryogenic system can be recovered within 4 h if sufficient liquid helium is available to inject into the cryostat. 展开更多
关键词 CRYOSTAT commissioning SC wiggler Synchrotron radiation
下载PDF
Water Cooperation Priorities in the Lancang-Mekong River Basin Based on Cooperative Events Since the Mekong River Commission Establishment 被引量:9
4
作者 FENG Yan WANG Wenling +2 位作者 SUMAN Daniel YU Shiwei HE Daming 《Chinese Geographical Science》 SCIE CSCD 2019年第1期58-69,共12页
The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Coope... The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Cooperation on water resources has been determined as one of the key priority areas in the Lancang-Mekong Cooperation Mechanism, but there are no details of targets. In order to establish the priorities of water cooperation under the mechanism, we adopted nine categories to classify the objectives of 87 water cooperation events based on the ‘Lancang-Mekong Water Cooperative Events Database' from 1995 to 2015. Based on the occurrence of cooperative events, cooperative objectives, cooperative scales, and approaches to cooperation, we conducted statistical, correlation, and text analyses. Our analyses indicated the following results: under the impact of economic conditions inside and outside the river basin, full cooperation appeared more difficult than bilateral and multilateral cooperation. Each of the partners adopted different preferences for cooperation targets. Cooperation with more definite objectives was easier to establish than cooperation with broader and more complex objectives. The potential objectives for water cooperation were navigation, hydropower, joint management, data sharing, flood control and water use. Because hydropower development is controversial, and because water cooperation is avoided by most existing regional cooperation mechanisms due to its complexity, we suggest the following priority areas for water cooperation in the Lancang-Mekong River Basin. 1) Navigation and flood control/drought relief are attractive objectives for all the riparian countries across the whole watershed. 2) Data sharing should be a priority for cooperation in the watershed due to its laying the foundation for the equitable and reasonable utilization of transboundary waters. 3) Hydropower is an objective best implemented mainly through bilateral cooperation, and on tributaries. 展开更多
关键词 water COOPERATION objective COOPERATIVE scale the Lancang-Mekong RIVER riparian country MEKONG RIVER commission
下载PDF
Commission Strategy of the Auction House 被引量:5
5
作者 WANG Yan~ 1,2 1. College of Economics, Fudan University, Shanghai 200433, China 2. School of Mathematics and Statistics, Wuhan University , Wuhan 430072, Hubei, China 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第3期507-510,共4页
In a SIPV model, when the commission proportion is not certain, but related with bargain price, generally, it is a linear function of the bargain price, this paper gives bidders' equilibrium bidding strategies in the... In a SIPV model, when the commission proportion is not certain, but related with bargain price, generally, it is a linear function of the bargain price, this paper gives bidders' equilibrium bidding strategies in the first-and secondprice auctions. We find that the equilibrium strategies in second-price auction are dominant strategies. For seller or auction house, whether the fixed proportion or the unfixed proportion is good is not only related with constant item and the linear coefficient of the linear function, the size of the fixed commission proportion, but also related with the value of the item auctioned. So, in the practical auctions, the seller and the auction house negotiated with each other to decide the commission rules for their own advantage. 展开更多
关键词 AUCTION commission proportion Bayesian equilibrium bidding strategy
下载PDF
Design and commissioning of Brav measurement system for SC200 superconducting cyclotron 被引量:2
6
作者 Man-Man Xu Yun-Tao Song +5 位作者 Gen Chen Yong-Hua Chen Kai-Zhong Ding Heng-Bo Li Jun Wang Jian Zhou 《Nuclear Science and Techniques》 SCIE CAS CSCD 2019年第6期57-62,共6页
The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) ... The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) with 15 search coils in the median plane. The winding differences of the search coils affect the measurement accuracy of the Brav. Based on the electromagnetic induction principle, to measure the Brav accurately, this paper focuses on the design and commissioning of the Brav measurement system. The preliminary results confirm that the system design is reasonable and suitable. After testing the search coil at different speeds, the optimal speed was determined as 2.5 mm/s. The relative error was approximately 0.1% under the maximum radial component of the magnetic field Br of 7 G. The measurement precision was up to 1.0×10^-3, which can provide the required measurement tolerance of 3–7 G for Br in the median plane. The commissioning of the Brav measurement system is an important step for Br measurement. It can check and adjust the asymmetry of the superconducting coils (SCs). 展开更多
关键词 SUPERCONDUCTING CYCLOTRON MAGNETIC FIELD MEASUREMENT system commissioning
下载PDF
Beam dynamics,RF measurement,and commissioning of a CW heavy ion IH-DTL 被引量:2
7
作者 Heng Du You-Jin Yuan +10 位作者 Zhong-Shan Li Zhi-Jun Wang Peng Jin Xiao-Ni Li Guo-Zhu Cai Wen-Wen Ge Guo-Feng Qu Yuan He Jia-Wen Xia Jian-Cheng Yang Xue-Jun Yin 《Nuclear Science and Techniques》 SCIE CAS CSCD 2018年第3期143-155,共13页
A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charg... A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charge ratio of 7.0 from 143 to 295 ke V/u. Low-power RF measurement of the IH-DTL1 has been taken to investigate the RF performance and the quality of the electric field distribution on the beam axis.The measured Q_0 value and the shunt impedance are 10,400 and 198 MX/m, respectively. The electric field distributions on and around the beam axis were evaluated and compared with the design value. By a new approach,the dipole field component is also estimated. The beam dynamics simulation using measured field distribution was presented in this paper. Based on the dynamics analysis in both transverse and longitudinal phase space, the field distribution can meet the design requirement. Finally, the RF conditioning and very first beam commissioning on the IH-DTL1 were finished. The beam test results agree well with the simulation results; what's more, the property of the variable output beam energy about the separated functions DTL was verified. 展开更多
关键词 LINAC RF MEASUREMENT BEAM DYNAMIC simulation commissioning
下载PDF
RF tuning and beam commissioning of CW RFQ for China-ADS Injector-I 被引量:1
8
作者 Hua Shi Huafu Ouyang +2 位作者 Shengchang Wang Ningchuang Zhou Gang Wu 《Nuclear Science and Techniques》 SCIE CAS CSCD 2018年第10期182-190,共9页
A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from... A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from January 2014 to January 2017. In a cold test, a stability study showed that the design of the segmented resonantly coupling and dipole stabilizer rods can shift the harmful quadrupole and dipole mode from the fundamental mode to above 2.6 MHz. We also found a simplified tuning method for the field unflatness, involving changing the inserted length of a few plug tuners. For achieving CW-beam commissioning, two full-size RFQs were constructed successively. The commissioning results indicate that the beam transmission rate decreased by approximately 3% as the normalized field unflatness decreased by 1%. A 10-MeV CW proton beam with an average beam current of 2.1 m A was achieved at the target of Injector-I, and the output beam energy of the RFQ was3.18 MeV. 展开更多
关键词 RFQ RF tuning CW-beam commissioning BEAM transmission rate
下载PDF
Commissioning of TrueBeamTM Medical Linear Accelerator: Quantitative and Qualitative Dosimetric Analysis and Comparison of Flattening Filter (FF) and Flattening Filter Free (FFF) Beam 被引量:4
9
作者 Ravindra Shende Gourav Gupta +1 位作者 Ganesh Patel Senthil Kumar 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2016年第1期51-69,共19页
Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</s... Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</sup> Medical Linear Accelerator. Critique of beam characterization and evolution of dosimetric properties for 6 MV, 10 MV, 15 MV FF beam and 6 MVFFF, 10 MVFFF FFF beam has been carried out. We performed the comparison of photon beam data for two standard FF photon energy 6 MV, 10 MV verses 6 MVFFF, and 10 MVFFF FFF beam. Determination and comparison of parameter involved PDD (Percentage depth dose), Depth dose profile, Symmetry, Flatness, Quality index, Relative output factor, Penumbra, Transmission factor, DLG (Dosimetric leaf gap), in addition to degree of Un-flatness and off-axis ratio of FFF beam. Outcomes of presenting study had shown that change of various parameters such as Percentage depth dose curves, Shape of the depth dose profile, Transmission, Value of quality index and significant rise in surface dose for FFF in comparison with FF beam. Differences in the output factor at lower and higher field sizes for FFF beam compared to that of FF beam were found. The maximum output factor deviation between 6 MV and 6 MVFFF was found to be 4.55%, whereas in 10 MV and 10 MVFFF was 5.71%. Beam quality TPR20/10 for FFF beam was found to be lesser in magnitude, 5.42% for 6 MVFFF whereas 4.50% for 10 MVFFF compared to 6 MV and 10 MV FF beam respectively. Jaw transmission and interleaf leakage for FFF beam were found to be lesser than FF beam. Also DLG for FFF beam was found to be lesser in magnitude comparable to that of flattened beam. This study is mainly inclined towards evaluation and comparison of the FF and FFF beam. It has been observed that, the outcome of a commissioning beam data generation fully complies with vendor specification and published literature. 展开更多
关键词 True Beam Medical Linear Accelerator commissioning Photon Beam Data Flattening Filter Flattening Filter Free
下载PDF
Mechanical Design and First Engineering Commissioning of ICRF Antenna for EAST 被引量:1
10
作者 杨庆喜 宋云涛 +1 位作者 武松涛 赵燕平 《Plasma Science and Technology》 SCIE EI CAS CSCD 2010年第4期488-493,共6页
A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key compon... A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key components of the new ICRF antenna and the charac- ters of the new,.]~rototype ICRF antenna are presented. The thermo-mechanical analysis of both the Faraday shield and the current straps was conducted, and the stresses due to heat loads are studied in detail with different cooling-water velocities considered. In addition, the movability of prototype ICRF antenna under vacuum condition by the driving system was tested. An engineer- ing commissioning was successfully performed on the prototype ICRF antenna using the original transmitter. The results are close to the expected. 展开更多
关键词 prototype ICRF antenna faraday shield current strap vacuum feed-through engineering commissioning
下载PDF
Commissioning experiences with the spoke-based CW superconducting proton linac 被引量:1
11
作者 Fang Yan Hui-Ping Geng +14 位作者 Cai Meng Ya-Liang Zhao Hua Shi Hua-Fu Ouyang Tong-Min Huang Fei-Si He Jian-Li Wang Rui Ge Yan-Feng Sui Qiang Ye Rong Liu Qun-Yao Wang Sheng-Chang Wang Jian-She Cao Wei-Min Pan 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2021年第10期12-29,共18页
The 10-MeV Accelerator-Driven Subcritical(ADS)system Injector-I test stand at the Institute of High Energy Physics(IHEP)is a testing facility dedicated to demonstrating the feasibility of the spoke-based super-conduct... The 10-MeV Accelerator-Driven Subcritical(ADS)system Injector-I test stand at the Institute of High Energy Physics(IHEP)is a testing facility dedicated to demonstrating the feasibility of the spoke-based super-conducting(SC)linear accelerator(linac)for the ADS project in China.The injector adopted a four-vane copper structure radio frequency quadrupole(RFQ)with an output energy of 3.2 MeV and an SC section accommodating 14 β_(g)=0.12 single spoke cavities,14 SC solenoids,and 14 cold beam position monitors(BPMs).A 10-MeV pulsed beam with a beam current of 10 mA and a 2-mA continuous wave(CW)beam were successfully shooting through.The commissioning results confirmed the feasibility of using a 325-MHz spoke-type cavity for accelerating the proton beam in the low β and medium β sections.This paper describes the results achieved,the difficulties encountered,and the experiences obtained during commissioning. 展开更多
关键词 Superconducting proton linac Spoke cavity High intensity CW commissioning
下载PDF
Building a New Socialist Countryside, Improving Commission and Agent System of “Village-level Accounting” 被引量:1
12
作者 SHI Hong 《Journal of Northeast Agricultural University(English Edition)》 CAS 2006年第2期192-196,共5页
Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. T... Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. This article explained the main problems of village financial, the needs of introducing commission and agent system of "village-level accounting" for building a new socialist countryside, and the measures of improving commission and agent system of "village-level accounting". 展开更多
关键词 building a new socialist countryside rural financial management village-level accounting commission and agent system
下载PDF
The International Cartographic Association National Atlas Commission Meeting Held in Beijing 被引量:1
13
作者 Liao Ke 《Journal of Geographical Sciences》 SCIE CSCD 1990年第2期107-108,共2页
ICA National Atlas Commission held a commission meeting and symposium from August 8-12,1990 in Beijing.Among those present at the meeting were Dr.B.Rystedt(Sweden),Chairman of ICA,Dr.E.Ciekirska(Canada),Vice Chairman ... ICA National Atlas Commission held a commission meeting and symposium from August 8-12,1990 in Beijing.Among those present at the meeting were Dr.B.Rystedt(Sweden),Chairman of ICA,Dr.E.Ciekirska(Canada),Vice Chairman of ICA and members from U.S.A.,China,Spain,the Netherlands,Czechoslovakia,India as well as representatives from U.S.S.R.,Czechoslovakia,and Spain.40 Chinese cartographers attended the meeting.The major topics 展开更多
关键词 maps The International Cartographic Association National Atlas commission Meeting Held in Beijing
下载PDF
A Sensitivity Dosimetry Study of the Setup Uncertainties during Machine Commissioning and Annual QA 被引量:1
14
作者 Vi Nhan Nguyen Brian Wang Chengyu Shi 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2016年第4期329-347,共19页
This study is to investigate three common potential setup uncertainties during Linac commissioning and annual QA and to evaluate how these uncertainties propagate into the quality of beam profiles and patient dosimetr... This study is to investigate three common potential setup uncertainties during Linac commissioning and annual QA and to evaluate how these uncertainties propagate into the quality of beam profiles and patient dosimetry using gamma analysis. Three uncertainty scenarios were purposely introduced for gantry position tilted from 0&ring;- 3&ring;(scenario 1), isocenter position misaligned from 0 - 6 mm (scenario 2) and SAD changed from 99.5 - 103 cm (scenario 3). A 60 × 60 × 60 cm<sup>3</sup> water phantom cube was created to replicate a 3D water tank in VarianEclipse (V.11) treatment planning system (Varian Medical Systems, Palo Alto, CA). For each scenario, beam data profiles (crossline and diagonal) and PDD curves were calculated at different field sizes and depths for three energies: 6 MV, 6 MV-FFF and 10 MV-FFF. Gamma analysis method was used to compare a total of 263 profiles to baseline using a 1%/1mm parameter with 90% gamma passing rate criteria. For scenario 1, a ≥90% gamma passing rate and ≤1% dose difference were seen on both crossline and diagonal profiles, and PDD curves for gantry tilted up to 2&ring;. For 3&ring;degree tilt, the gamma passing rate decreased to ≤90% at depth of ≥20 cm for 6MV/6MV-FFF and depth of ≥12 cm for 10MV-FFF. For scenario 2, a ≤90% gamma passing rate and ≥1% dose difference were seen at depths from d<sub>max</sub> to 20 cm for all energies. For depths ≥20 cm, mostly ≥90% gamma passing rate and ≤1% dose difference were seen. For scenario 3, a ≥90% gamma passing rate and ≤1% dose difference were seen on ≤4 mm isocenter misalignments for all energies. In summary, gamma analysis of the beam profiles is a very sensitive test for SAD deviation scenarios and can reveal issues of sub millimeter setup uncertainty. However, it is not as sensitive for isocenter misalignment scenarios. The test is also more sensitive for FFF beams than flattening filter beams. 展开更多
关键词 Linac commissioning Annual QA Gamma Analysis TG 142 Flattening Filter and Flattening Filter Free Beams
下载PDF
On the Eve of the Enforcement of the Arbitration Law——An interview with Xu Dayou, vice-chairman of China Council for the Promotion of International Trade and of the China International Economic and Trade Arbitration Commission 被引量:1
15
作者 Min Zi 《China's Foreign Trade》 1995年第6期6-7,共2页
The Arbitration Law of the People’s Republic of China will go into effect on September 1, 1995, which has become the focus of world attention. This is an important law promulgated by China for handling economic dispu... The Arbitration Law of the People’s Republic of China will go into effect on September 1, 1995, which has become the focus of world attention. This is an important law promulgated by China for handling economic disputes. All the parties concerned are making intense preparations for the successful enforcement of the Law. As the first nongovernmental organisation engaged in arbitration affairs, the China Council 展开更多
关键词 On the Eve of the Enforcement of the Arbitration Law vice-chairman of China Council for the Promotion of International Trade and of the China International Economic and Trade Arbitration commission An interview with Xu Dayou
下载PDF
NUAA Passed Successfuly Preliminary Examination of “211 Project” of State Education Commission
16
《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 1996年第2期69-69,共1页
On 46,Dec.1996 the members of specialist group organized by the Gvi1 Aviation Administration of China(CAAC)and the Aviation Industries of China(AIC)conduct the prelimi nary examination of“211 Project"(Constructi... On 46,Dec.1996 the members of specialist group organized by the Gvi1 Aviation Administration of China(CAAC)and the Aviation Industries of China(AIC)conduct the prelimi nary examination of“211 Project"(Construction of 100 key colleges a nd universities of China in 21 century)ofNanjing University of Aeronautics and Astronautics(NUAA). 展开更多
关键词 PROJECT State EDUCATION EXAMINATION NUAA PASSED PRELIMINARY commission
下载PDF
Modes and Approaches of Promoting Rural Revitalization by Science and Technology Commissioners: A Case Study of Science and Technology Commissioners from Zhejiang Academy of Agricultural Sciences
17
作者 Yanting LU Shenghai YE +5 位作者 Guofu ZHU Baogang LIN Faming YU Rongrong ZHAI Jing YE Xiaoming ZHANG 《Asian Agricultural Research》 2020年第1期15-18,共4页
The modes and approaches of promoting the implementation of strategy for rural revitalization based on agricultural science and technology commissioner system were studied by taking Zhejiang Academy of Agricultural Sc... The modes and approaches of promoting the implementation of strategy for rural revitalization based on agricultural science and technology commissioner system were studied by taking Zhejiang Academy of Agricultural Sciences as an example.The relevant modes and approaches were summarized,such as giving full play to the expertise of science and technology commissioners to promote the prosperity of rural industries,promoting ecological livable construction based on modern agricultural science and technology,promoting rural civilization based on agricultural science and technology,and promoting the construction of rural good governance based on advanced productivity.Besides,agricultural science and technology commissioners use the three elements of"people,technology,and money"to promote the enhancement of agricultural efficiency,farmers’income,and the prosperity of life and then the coordinated development of rural revitalization. 展开更多
关键词 Science and technology commissioner RURAL REVITALIZATION Service mode and approach
下载PDF
Design and Realization of Information System for Ningxia Sci-tech Special Commissioners
18
作者 Changhong WANG 《Asian Agricultural Research》 2013年第6期133-135,共3页
The information system for Ningxia sci-tech special commissioners is an application system for realizing information collection,management and sharing in the entrepreneurial process of sci-tech special commissioners. ... The information system for Ningxia sci-tech special commissioners is an application system for realizing information collection,management and sharing in the entrepreneurial process of sci-tech special commissioners. This paper introduces overall design ideas,system functions,key technologies and realization methods of the information system for Ningxia sci-tech special commissioners. Completion of construction and coming into operation of the information system bring new breakthrough for information management and data statistics of sci-tech special commissioners. 展开更多
关键词 SCI-TECH SPECIAL commissionERS Infomration managem
下载PDF
案例:Joint Commission推出的“Speak Up”患者安全项目——以Hurley医疗中心为例
19
作者 刘秀明 陈洁 《中国医院》 2010年第10期I0005-I0007,共3页
2002年3月,美国的The Joint CommissionR(The Joint commission是独立的非营利性机构,为美国17000多家医疗机构提供认证,该项认证被公认为是医疗质量品质的表现)联合Medicare(Medicare是美国政府为符合一定条件的老年人提供的联... 2002年3月,美国的The Joint CommissionR(The Joint commission是独立的非营利性机构,为美国17000多家医疗机构提供认证,该项认证被公认为是医疗质量品质的表现)联合Medicare(Medicare是美国政府为符合一定条件的老年人提供的联邦医疗保险)和Medicaid(Medicaid是美国政府为低收入老年人、低收入家庭及残疾人提供的医疗保险。 展开更多
关键词 commission 医疗中心 安全项目 commission 美国政府 案例 患者 非营利性机构
下载PDF
National Engineering Research Center for Refractories Got “Excellent Achievement Prize” from National Development and Reform Commission
20
《China's Refractories》 CAS 2012年第4期12-12,共1页
In 2012, on the occasion of 20th anniversary, National Engineering Research Center for Refractories, registered in Sinosteel LIRR, got " Excellent Achievement Prize" from National Development and Reform Commission ... In 2012, on the occasion of 20th anniversary, National Engineering Research Center for Refractories, registered in Sinosteel LIRR, got " Excellent Achievement Prize" from National Development and Reform Commission for its demonstration function and outstanding achievments. 展开更多
关键词 National Engineering Research Center for Refractories Got Excellent Achievement Prize from National Development and Reform commission
下载PDF
上一页 1 2 31 下一页 到第
使用帮助 返回顶部