期刊文献+
共找到237篇文章
< 1 2 12 >
每页显示 20 50 100
Milestone progress of the HEPS booster commissioning
1
作者 Yue-Mei Peng Jian-She Cao +20 位作者 Jin-Hui Chen Hai-Yi Dong Ping He Yi Jiao Ling Kang Wen Kang Jian Li Jing-Yi Li Guo-Ping Lin Fang Liu Feng-Li Long Cai Meng Xin Qi Hua-Min Qu Yan-Feng Sui Sheng Wang Gang Xu Qiang Ye Jing Zhang Pei Zhang Wei-Min Pan 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2024年第1期170-177,共8页
The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the ... The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring.The full-energy beam could be injected to the storage ring directly or after“high-energy accumulation.”On November 17,2023,the key booster parameters successfully reached their corresponding target values.These milestone results were achieved based on numerous contributions,including nearly a decade of physical design,years of equipment development and installation,and months of beam commissioning.As measured at the extraction energy of 6 GeV,the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm rad with a single-bunch charge of 5.58 nC,compared with the corresponding target values of 6.6 mA and 35 nm rad,respectively.This paper presents the physical design,equipment development,installation,and commissioning process of the HEPS booster. 展开更多
关键词 High energy photon source BOOSTER Beam commissioning
下载PDF
Perceived stress among staff in Saudi Arabian dental colleges before and after an accreditation process: A cross-sectional study
2
作者 Amal S Shaiban 《World Journal of Clinical Cases》 SCIE 2024年第4期758-765,共8页
BACKGROUND Accreditation processes are extensively employed to guarantee the quality of higher education institutions.However,this process can potentially generate a stressful atmosphere for staff,thus impacting their... BACKGROUND Accreditation processes are extensively employed to guarantee the quality of higher education institutions.However,this process can potentially generate a stressful atmosphere for staff,thus impacting their ability to perform optimally under pressure.AIM To examine the knowledge of the National Commission for Academic Assessment and Accreditation(NCAAA)and its effects on perceived stress among dental college staff before and after the program accreditation process.METHODS The present cross-sectional questionnaire-based study included 300 employees from three dental colleges.The same employees had to fill out the questionnaire 1 mo after the NCAAA process.RESULTS Approximately 51.33%of the included employees believed that NCAAA is essential to attract quality students to join the program before and after the program.A total of 44.67%felt that their stress was high before,and 31.33%had low stress levels before and after NCAAA.These findings were statistically significant(P≤0.05).CONCLUSION NCAAA raised the prestige of the institution and specific programmes and increased prospects to attract better students,staff,and money,according to the employees.In addition to their needed teaching,research,and other service responsibilities,this work requires a tremendous amount of faculty effort and may cause them stress. 展开更多
关键词 National Commission for Academic Assessment and Accreditation Accreditation process Perceived stress STAFF
下载PDF
Design and commissioning of Brav measurement system for SC200 superconducting cyclotron 被引量:2
3
作者 Man-Man Xu Yun-Tao Song +5 位作者 Gen Chen Yong-Hua Chen Kai-Zhong Ding Heng-Bo Li Jun Wang Jian Zhou 《Nuclear Science and Techniques》 SCIE CAS CSCD 2019年第6期57-62,共6页
The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) ... The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) with 15 search coils in the median plane. The winding differences of the search coils affect the measurement accuracy of the Brav. Based on the electromagnetic induction principle, to measure the Brav accurately, this paper focuses on the design and commissioning of the Brav measurement system. The preliminary results confirm that the system design is reasonable and suitable. After testing the search coil at different speeds, the optimal speed was determined as 2.5 mm/s. The relative error was approximately 0.1% under the maximum radial component of the magnetic field Br of 7 G. The measurement precision was up to 1.0×10^-3, which can provide the required measurement tolerance of 3–7 G for Br in the median plane. The commissioning of the Brav measurement system is an important step for Br measurement. It can check and adjust the asymmetry of the superconducting coils (SCs). 展开更多
关键词 SUPERCONDUCTING CYCLOTRON MAGNETIC FIELD MEASUREMENT system Commissioning
下载PDF
Building a New Socialist Countryside, Improving Commission and Agent System of “Village-level Accounting” 被引量:1
4
作者 SHI Hong 《Journal of Northeast Agricultural University(English Edition)》 CAS 2006年第2期192-196,共5页
Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. T... Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. This article explained the main problems of village financial, the needs of introducing commission and agent system of "village-level accounting" for building a new socialist countryside, and the measures of improving commission and agent system of "village-level accounting". 展开更多
关键词 building a new socialist countryside rural financial management village-level accounting commission and agent system
下载PDF
Baosteel's No.8 air separation unit and the practice of its system commissioning
5
作者 ZHOU Chenhao CAI Lemin LI Zhengqiang 《Baosteel Technical Research》 CAS 2009年第3期23-26,共4页
This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes t... This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice. 展开更多
关键词 air separation unit commissioning malfunction solution
下载PDF
A Number Description of Ghanaian Water Quality—A Case Study of the Southwestern and Coastal Rivers Systems of Ghana
6
作者 Humphrey F. Darko Osmund Ansa-Asare Adwoa Paintsil 《Journal of Environmental Protection》 2013年第11期1318-1327,共10页
The CSIR Water Research Institute undertook water quality monitoring and assessment of the Southwestern and the Coastal Rivers Systems of Ghana from 2005 to 2008 for the Water Resources Commission of Ghana (WRC) under... The CSIR Water Research Institute undertook water quality monitoring and assessment of the Southwestern and the Coastal Rivers Systems of Ghana from 2005 to 2008 for the Water Resources Commission of Ghana (WRC) under WRIS II Project, a Danish Government Funded Project. The Southwestern and the Coastal Rivers Systems cover approximately 30% of the total drainage basins of Ghana. A total of 19 surface water stations were selected for the monitoring programme. The Adapted Water Quality Index (WQI) was to be used as a tool to classify the overall ambient water quality at the 19 different stations. The index classified water quality into one of four categories: good (Class I, >80), fairly good (Class II, 50 - 80), poor (Class III, 25 - 50), and grossly polluted (Class IV, <25). This paper presents the Water Quality Index approach to the assessment of water quality of the waters in the different stations during the period of study. These ten water quality parameters were used to determine the water quality index (WQI): Dissolved Oxygen (DO % Saturation), Biochemical Oxygen Demand (BOD), Ammonium Nitrogen (NH4-N), Faecal Coliform (FC), pH, Nitrate as Nitrogen (NO3-N), Phosphate as Phosphorus (PO4-P), Total Suspended Solids (TSS), Conductivity and Temperature. Evaluation of the waters with the WQI indicated that most Ghanaian waters are currently in Class II, the fairly good water quality state, but with variations in this range within the seasons and stations, and from one water body to the other. Potroase in the Densu basin had the best water quality during the study period while Nsawam had the poorest. Efforts should be made to prevent further pollution of the waters to improve their quality. 展开更多
关键词 WATER QUALITY Index (WQI) WATER QUALITY Southwestern RIVERS systemS COASTAL RIVERS systemS WATER Resources COMMISSION (WRC) Ghana
下载PDF
Commissioning of the TrueBeam STx 6 MV FFF Beam in the RayStation Treatment Planning System for SRS and SBRT Treatments
7
作者 Yongsook C. Lee Yongbok Kim 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2021年第1期16-37,共22页
<strong>Purpose:</strong> The purpose of this study is to provide technical information on commissioning the TrueBeam STx 6 MV flattening-filter free (FFF) beam in the RayStation treatment planning system ... <strong>Purpose:</strong> The purpose of this study is to provide technical information on commissioning the TrueBeam STx 6 MV flattening-filter free (FFF) beam in the RayStation treatment planning system (TPS) for stereotactic radiosurgery (SRS) and stereotactic body radiation therapy (SBRT) treatments. <strong>Methods:</strong> For beam modeling, percent depth dose curves, profiles and output factors for jaw-collimated fields and stereotactic cones as well as X-jaws transmission were measured. For multi-leaf collimator (MLC) modeling, MLC model parameters such as offset, gain, curvature, leaf tip width, tongue and groove and transmission were determined and output factors for MLC-collimated fields were measured. Absolute dose calibration was also performed. For beam model and MLC model validation, the American Association of Physicists in Medicine Task Group-119 plans, clinical SRS and SBRT plans and end-to-end testing were performed. <strong>Results:</strong> Beam characteristics of the 6 MV FFF beam agreed well with those in the literature. Validation results showed that our beam model and MLC model were acceptable for SRS and SBRT treatments. <strong>Conclusions:</strong> The technical information and dosimetric data provided in this study will be a useful reference for other clinics/institutions which will commission the same machine energy in the RayStation TPS. 展开更多
关键词 Commissioning TrueBeam STx 6 MV Flattening-Filter Free (FFF) RayStation Stereotactic Radiosurgery (SRS) and Stereotactic Body Radiation Therapy (SBRT)
下载PDF
Dataset for Beam Commissioning of the Vero4DRT System
8
作者 Hideharu Miura Shuichi Ozawa +3 位作者 Shintaro Tsuda Masahiro Hayata Kiyoshi Yamada Yasushi Nagata 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2016年第1期70-77,共8页
We present the results of measurements made using the Vero4DRT radiation therapy system, which is not yet widely used, to assist technicians in achieving reliable and safe radiotherapy to the patient. We measured perc... We present the results of measurements made using the Vero4DRT radiation therapy system, which is not yet widely used, to assist technicians in achieving reliable and safe radiotherapy to the patient. We measured percent depth dose, beam profile, and relative scatter factor under water and air conditions. The Vero4DRT system has a 150 × 150-mm fixed secondary collimator. Its multileaf collimator (MLC) design is a single-focus type, with 30 pairs of 5 mm thick leaves at the isocenter, and produces a maximum field size of 150 × 150 mm. Profile measurements were performed using a 0.016-cm<sup>3</sup> ionization chamber (PTW31016 pinpoint chamber;PTW, Freiburg GmbH Germany). A brass build-up cap was used for measurements obtained in air conditions. We present a useful measurement dataset for users of the Vero4DRT system. 展开更多
关键词 Vero4DRT Beam Characteristic Commissioning
下载PDF
A method of parsing based on improving the electricity behavior and regulating excitation system of the diesel generating set in the nuclear power plant
9
作者 Meng Wang 《Modern Electronic Technology》 2017年第1期30-32,共3页
This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting proc... This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit. 展开更多
关键词 Nuclear Power Plant EMERGENCY DIESEL GENERATOR unit Commissioning Operation
下载PDF
The Zouxian-Mengyin Transmission and Substation Project Commissioned
10
《Electricity》 2000年第1期54-54,共1页
关键词 PROJECT The Zouxian-Mengyin Transmission and Substation Project commissioned LINE
下载PDF
A Compact Designed 500 kV Line Commissioned
11
《Electricity》 2000年第1期54-54,共1页
关键词 LINE KV A Compact Designed 500 kV Line commissioned
下载PDF
The Third Bulk Power Channel from West to East Commissioned
12
《Electricity》 2001年第1期47-47,共1页
关键词 HVDC The Third Bulk Power Channel from West to East commissioned WEST
下载PDF
New capacity steadily commissioned, security management highly strengthened
13
《Electricity》 1998年第3期5-5,共1页
关键词 New capacity steadily commissioned security management highly strengthened
下载PDF
First tower line using composite material commissioned in Jiangsu
14
作者 Liu Chunsheng 《Electricity》 2010年第1期7-,共1页
On December 3, 2009, the upgraded 220-kV Mao-Qiang line of Jiangsu Lianyungang Power Supply Co. was put into operation. It is the first high voltage
关键词 LINE First tower line using composite material commissioned in Jiangsu
下载PDF
Unit 2 of Tianjin Beijiang Power Plant commissioned
15
《Electricity》 2010年第1期29-,共1页
Tianjin Beijiang Power Plant, one of the first series of Circular Economy Demonstration Project in the country, successfully put its second unit into operation on November 30, 2009
关键词 Unit 2 of Tianjin Beijiang Power Plant commissioned PROJECT
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
16
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 Construction Schedule of Generating Units to be commissioned in 1998
下载PDF
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
17
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
下载PDF
The First Unit of Tianshengqiao No.1 Hydropower Station and Tian-Guang 500 kV Second Line Commissioned
18
《Electricity》 1999年第2期48-48,共1页
关键词 KV The First Unit of Tianshengqiao No.1 Hydropower Station and Tian-Guang 500 kV Second Line commissioned
下载PDF
1500 MW Units to be Commissioned in Hubei This Year
19
《Electricity》 1997年第3期47-47,共1页
关键词 MW Units to be commissioned in Hubei This Year
下载PDF
The First 200 MW Unit Commissioned in Yunnan
20
《Electricity》 1996年第4期33-33,共1页
The 200 MW thermal power unit of Yaugzonghai Reconstruction Project phase I was commissioned and put into system operation on 17th November 1996, it is the first 200 MW thermal unit in operation in Yunnan Province.
关键词 The First 200 MW Unit commissioned in Yunnan
下载PDF
上一页 1 2 12 下一页 到第
使用帮助 返回顶部