Time synchronization(TS)is crucial for ensuring the secure and reliable functioning of the distribution power Internet of Things(IoT).Multi-clock source time synchronization(MTS)has significant advantages of high reli...Time synchronization(TS)is crucial for ensuring the secure and reliable functioning of the distribution power Internet of Things(IoT).Multi-clock source time synchronization(MTS)has significant advantages of high reliability and accuracy but still faces challenges such as optimization of the multi-clock source selection and the clock source weight calculation at different timescales,and the coupling of synchronization latency jitter and pulse phase difference.In this paper,the multi-timescale MTS model is conducted,and the reinforcement learning(RL)and analytic hierarchy process(AHP)-based multi-timescale MTS algorithm is designed to improve the weighted summation of synchronization latency jitter standard deviation and average pulse phase difference.Specifically,the multi-clock source selection is optimized based on Softmax in the large timescale,and the clock source weight calculation is optimized based on lower confidence bound-assisted AHP in the small timescale.Simulation shows that the proposed algorithm can effectively reduce time synchronization delay standard deviation and average pulse phase difference.展开更多
Haptic communications is recognized as a promising enabler of extensive services by enabling real-time haptic control and feedback in remote environments,e.g.,teleoperation and autonomous driving.Considering the stric...Haptic communications is recognized as a promising enabler of extensive services by enabling real-time haptic control and feedback in remote environments,e.g.,teleoperation and autonomous driving.Considering the strict transmission requirements on reliability and latency,Device-to-Device(D2D)communications is introduced to assist haptic communications.In particular,the teleoperators with poor channel quality are assisted by auxiliaries,and each auxiliary and its corresponding teleoperator constitute a D2D pair.However,the haptic interaction and the scarcity of radio resources pose severe challenges to the resource allocation,especially facing the sporadic packet arrivals.First,the contentionbased access scheme is applied to achieve low-latency transmission,where the resource scheduling latency is omitted and users can directly access available resources.In this context,we derive the reliability index of D2D pairs under the contention-based access scheme,i.e.,closed-loop packet error probability.Then,the reliability performance is guaranteed by bidirectional power control,which aims to minimize the sum packet error probability of all D2D pairs.Potential game theory is introduced to solve the problem with low complexity.Accordingly,a distributed power control algorithm based on synchronous log-linear learning is proposed to converge to the optimal Nash Equilibrium.Experimental results demonstrate the superiority of the proposed learning algorithm.展开更多
This paper investigates a wireless powered and backscattering enabled sensor network based on the non-linear energy harvesting model, where the power beacon(PB) delivers energy signals to wireless sensors to enable th...This paper investigates a wireless powered and backscattering enabled sensor network based on the non-linear energy harvesting model, where the power beacon(PB) delivers energy signals to wireless sensors to enable their passive backscattering and active transmission to the access point(AP). We propose an efficient time scheduling scheme for network performance enhancement, based on which each sensor can always harvest energy from the PB over the entire block except its time slots allocated for passive and active information delivery. Considering the PB and wireless sensors are from two selfish service providers, we use the Stackelberg game to model the energy interaction among them. To address the non-convexity of the leader-level problem, we propose to decompose the original problem into two subproblems and solve them iteratively in an alternating manner. Specifically, the successive convex approximation, semi-definite relaxation(SDR) and variable substitution techniques are applied to find a nearoptimal solution. To evaluate the performance loss caused by the interaction between two providers, we further investigate the social welfare maximization problem. Numerical results demonstrate that compared to the benchmark schemes, the proposed scheme can achieve up to 35.4% and 38.7% utility gain for the leader and the follower, respectively.展开更多
This paper discussed the experimental results of the performance of an organic Rankine cycle(ORC)system with an ultra-low temperature heat source.The low boiling point working medium R134a was adopted in the system.Th...This paper discussed the experimental results of the performance of an organic Rankine cycle(ORC)system with an ultra-low temperature heat source.The low boiling point working medium R134a was adopted in the system.The simulated heat source temperature(SHST)in this work was set from 39.51°C to 48.60°C by the simulated heat source module.The influence of load percentage of simulated heat source(LPSHS)between 50%and 70%,the rotary valve opening(RVO)between 20%and 100%,the resistive load between 36Ωand 180Ωor the no-load of the generator,as well as the autumn and winter ambient temperature on the system performance were studied.The results showed that the stability of the system was promoted when the generator had a resistive load.The power generation(PG)and generator speed(GS)of the system in autumn were better than in winter,but the expander pressure ratio(EPR)was lower than in winter.Keep RVO unchanged,the SHST,the mass flow rate(MFR)of the working medium,GS,and the PG of the system increased with the increasing of LPSHS for different generator resistance load values.When the RVO was 60%,LPSHS was 70%,the SHST was 44.15°C and the resistive load was 72Ω,the highest PG reached 15.11 W.Finally,a simulation formula was obtained for LPSHS,resistance load,and PG,and its correlation coefficient was between 0.9818 and 0.9901.The formula can accurately predict the PG.The experimental results showed that the standard deviation between the experimental and simulated values was below 0.0792,and the relative error was within±5%.展开更多
In this paper,the channel capacity of the multiple-input multiple-output(MIMO)visible light communication(VLC)system is investigated under the peak,average optical and electrical power constraints.Finding the channel ...In this paper,the channel capacity of the multiple-input multiple-output(MIMO)visible light communication(VLC)system is investigated under the peak,average optical and electrical power constraints.Finding the channel capacity of MIMO VLC is shown to be a mixed integer programming problem.To address this open problem,we propose an inexact gradient projection method to find the channel capacity-achieving discrete input distribution and the channel capacity of MIMO VLC.Also we derive both upper and lower bounds of the capacity of MIMO VLC with the closed-form expressions.Furthermore,by considering practical discrete constellation inputs,we develop the optimal power allocation scheme to maximize transmission rate of MIMO VLC system.Simulation results show that more discrete points are needed to achieve the channel capacity as SNR increases.Both the upper and lower bounds of channel capacity are tight at low SNR region.In addition,comparing the equal power allocation,the proposed power allocation scheme can significantly increase the rate for the low-order modulation inputs.展开更多
Similar to air reverberation chambers, non-anechoic water tanks are important acoustic measurement devices that can be used to measure the sound power radiated from complex underwater sound sources using diffusion fie...Similar to air reverberation chambers, non-anechoic water tanks are important acoustic measurement devices that can be used to measure the sound power radiated from complex underwater sound sources using diffusion field theory. However,the problem of the poor applicability of low-frequency measurements in these tanks has not yet been solved. Therefore,we propose a low-frequency acoustic measurement method based on sound-field correction(SFC) in an enclosed space that effectively solves the problem of measuring the sound power from complex sound sources below the Schroeder cutoff frequency in a non-anechoic tank. Using normal mode theory, the transfer relationship between the mean-square sound pressure in an underwater enclosed space and the free-field sound power of the sound source is established, and this is regarded as a correction term for the sound field between this enclosed space and the free field. This correction term can be obtained based on previous measurements of a known sound source. This term can then be used to correct the mean-square sound pressure excited by any sound source to be tested in this enclosed space and equivalently obtain its free-field sound power. Experiments were carried out in a non-anechoic water tank(9.0 m × 3.1 m × 1.7 m) to confirm the validity of the SFC method. Through measurements with a spherical sound source(whose free-field radiation characteristics are known),the correction term of the sound field between this water tank and the free field was obtained. On this basis, the sound power radiated from a cylindrical shell model under the action of mechanical excitation was measured. The measurement results were found to have a maximum deviation of 2.9 d B from the free-field results. These results show that the SFC method has good applicability in the frequency band above the first-order resonant frequency in a non-anechoic tank. This greatly expands the potential low-frequency applications of non-anechoic tanks.展开更多
Power line communication(PLC)provides intelligent electrical functions such as power quality measurement,fault surveys,and remote control of electrical network.Most of research works have been done in low voltage(LV)s...Power line communication(PLC)provides intelligent electrical functions such as power quality measurement,fault surveys,and remote control of electrical network.Most of research works have been done in low voltage(LV)scenario due to the fast development of in-home PLC.The aim of this paper is to evaluate the link-level performance of a medium voltage(MV)MIMO-OFDM communication system based on transmission link under underground power line channel.The MIMO channel is modeled as a modified multipath model in the presence of impulsive noise and background noise.We first perform a measurement on the practical MV MIMO channel parameters for a section of buried cable of 1 km long in Ganzhou city,Jiangxi province,China.Based on the measured channel,we design the frame structure based on an IEEE standard for broadband over power line networks[1]to support MV MIMO-OFDM transmission.According to designed frame structure,we design an encoder and a decoder for a dual binary tail-biting turbo code and optimize some key decoder parameters for low bit error rate performance.Finally,the link-level performance for both spatial multiplexing and spatial diversity are evaluated.Numeral results show that MV MIMO-OFDM is a promising approach to provide both high data rate and link reliability for PLC.展开更多
Traditional magnetically coupled resonant wireless power transfer technology uses fixed distances between coils for research,to prevent fluctuations in the receiving voltage,and lead to reduce transmission efficiency....Traditional magnetically coupled resonant wireless power transfer technology uses fixed distances between coils for research,to prevent fluctuations in the receiving voltage,and lead to reduce transmission efficiency.This paper proposes a closed-loop control wireless communication wireless power transfer system with a wearable four-coil structure to stabilize the receiving voltage fluctuation caused by changes in the displacement between the coils.Test results show that the system can provide stable receiving voltage,no matter how the distance between the transmitting coil and the receiving coil is changed.When the transmission distance is 20 mm,the power transfer efficiency of the system can reach 18.5%under the open-loop state,and the stimulus parameters such as the stimulation period and pulse width can be adjusted in real time through the personal computer terminal.展开更多
The pulse-width-modulated(PWM)current-source converters(CSCs)fed electric machine systems can be considered as a type of high reliability energy conversion systems,since they work with the long-life DC-link inductor a...The pulse-width-modulated(PWM)current-source converters(CSCs)fed electric machine systems can be considered as a type of high reliability energy conversion systems,since they work with the long-life DC-link inductor and offer high fault-tolerant capability for short-circuit faults.Besides,they provide motor friendly waveforms and four-quadrant operation ability.Therefore,they are suitable for high-power applications of fans,pumps,compressors and wind power generation.The purpose of this paper is to comprehensively review recent developments of key technologies on modulation and control of high-power(HP)PWM-CSC fed electric machines systems,including reduction of low-order current harmonics,suppression of inductor–capacitor(LC)resonance,mitigation of common-mode voltage(CMV)and control of modular PWM-CSC fed systems.In particular,recent work on the overlapping effects during commutation,LC resonance suppression under fault-tolerant operation and collaboration of modular PMW-CSCs are described.Both theoretical analysis and some results in simulations and experiments are presented.Finally,a brief discussion regarding the future trend of the HP CSC fed electric machines systems is presented.展开更多
The experiential adjustment process in an experiment on the ion source of the neutral beam injector system for the HT-7 Tokamak is reported in this paper. With regard to the data obtained in the same condition, in arr...The experiential adjustment process in an experiment on the ion source of the neutral beam injector system for the HT-7 Tokamak is reported in this paper. With regard to the data obtained in the same condition, in arranging the arc current intensities of every shot with a decay rank, the distributions of the arc current intensity correspond to the power laws, and the distribution obtained in the condition with the cryo-pump corresponds to the double Pareto distribution. Using the similar study method, the distributions of the arc duration are close to the power laws too. These power law distributions are formed rather naturally instead of being the results of purposeful seeking.展开更多
This paper analyses the performance request of arc welding power source used in intelligent control of weld pool shape in pulsed GTAW, and develops a sample power source. The main circuit of the power source takes the...This paper analyses the performance request of arc welding power source used in intelligent control of weld pool shape in pulsed GTAW, and develops a sample power source. The main circuit of the power source takes the structure of single ended inverter with two switches, and takes IGBTs as power switches. The working frequency of the inverter is set at 20 kHz. The control circuit takes PWM circuit as center, and uses single chip computer to complete the manage functions such as the control of working sequence, setting and changing of the welding parameters, sensing of the welding states and communication with outside computer etc. The dynamic reacting time of the whole power is 1 ms, the range of the output current is 5~250 A, the precision of the output current reaches to 1 A. The power strikes arc by contacting workpiece under 5 A, and have convenient interface with system computer. All above shows this power source is one with high performance.展开更多
New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the depen...New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the dependence of RES on natural conditions of region, schedule of energy supply, parameters and configuration of distribution network is suggested in the paper. Results of computations of test scheme confirm the efficiency of the proposed method and its simplicity as compared with the methods considered in literature sources.展开更多
In this paper,a beamforming scheme to improve the coverage in high-speed railway communication systems is investigated.A dedicated coverage model,where the coverage cell is an ellipse rather than the traditional circu...In this paper,a beamforming scheme to improve the coverage in high-speed railway communication systems is investigated.A dedicated coverage model,where the coverage cell is an ellipse rather than the traditional circular or linear,is considered.Based on the elliptical coverage cell,an optimization problem for the beamforming design is formulated to maximize the percentage of railway coverage,subject to the constraints on equal expected designed propagation gain(the gain obtained by a combination of designed beam and propagation channel)on the elliptical curve,i.e.,the expectation of designed propagation gain on the elliptical curve are all equal.Considering that the coverage can be improved by increasing the minimum designed propagation gain on the railway,the problem can be recast to maximizing the equal expected designed propagation gain on the elliptical curve.Subsequently,a beamforming design with an improved β-fairness power allocation,where the optimization problem is formulated to maximize the minimum expected received power over time with the constraints on elliptical cell based beamforming and mobile service amount,is proposed to further improve the coverage.An alternating iteration algorithm is developed to find the optimal beamforming vector and the instantaneous transmit power.Through numerical results,it is found that the beamforming designed on the elliptical curve covers longer railway than beamforming designed on the railway directly,and the coverage of elliptical cell based beamforming can be increased with the eccentricity.In addition,beamforming with the improvedβ-fairness power allocation can further improve the railway coverage and mobile service amount simultaneously.Moreover,it is shown that the larger eccentricity of the ellipse with appropriately chosen BS location,the larger coverage distance.展开更多
Device-to-Device(D2D)communication is a promising technology that can reduce the burden on cellular networks while increasing network capacity.In this paper,we focus on the channel resource allocation and power contro...Device-to-Device(D2D)communication is a promising technology that can reduce the burden on cellular networks while increasing network capacity.In this paper,we focus on the channel resource allocation and power control to improve the system resource utilization and network throughput.Firstly,we treat each D2D pair as an independent agent.Each agent makes decisions based on the local channel states information observed by itself.The multi-agent Reinforcement Learning(RL)algorithm is proposed for our multi-user system.We assume that the D2D pair do not possess any information on the availability and quality of the resource block to be selected,so the problem is modeled as a stochastic non-cooperative game.Hence,each agent becomes a player and they make decisions together to achieve global optimization.Thereby,the multi-agent Q-learning algorithm based on game theory is established.Secondly,in order to accelerate the convergence rate of multi-agent Q-learning,we consider a power allocation strategy based on Fuzzy C-means(FCM)algorithm.The strategy firstly groups the D2D users by FCM,and treats each group as an agent,and then performs multi-agent Q-learning algorithm to determine the power for each group of D2D users.The simulation results show that the Q-learning algorithm based on multi-agent can improve the throughput of the system.In particular,FCM can greatly speed up the convergence of the multi-agent Q-learning algorithm while improving system throughput.展开更多
Adaptive bit-loading algorithms can improve the performance of OFDM systems significantly. The tradeoff between the performance of the algorithm and its computational complexity is essential for the implementation of ...Adaptive bit-loading algorithms can improve the performance of OFDM systems significantly. The tradeoff between the performance of the algorithm and its computational complexity is essential for the implementation of loading algorithms. In this paper, we present a low complexity non-iterative discrete bit-loading algorithm to maximize the data rate subject to specified target BER and uniform power allocation. Simulation results show that the proposed algorithm outperforms the equal-BER loading and achieves similar rates to incremental allocation, yet with much lower complexity.展开更多
Network information communication technology in power systems is the key to ensuring the safe and efficient operation of power grids.The network information communication technology itself has advantages in automation...Network information communication technology in power systems is the key to ensuring the safe and efficient operation of power grids.The network information communication technology itself has advantages in automation operation and information transmission,thus is widely applied to the power system.In the case of ensuring that the power system is compatible with the network information communication technology,the control of the power system can be strengthened,and the operational efficiency of the power system can be improved.This paper mainly analyzes the specific application of network information communication technology in power system.展开更多
A low power model for Code Division Multiple Access (CDMA) based cellular communication system is developed. The dynamic power is minimized by reducing the frequency of the Phase Lock Loop (PLL) after lock is establis...A low power model for Code Division Multiple Access (CDMA) based cellular communication system is developed. The dynamic power is minimized by reducing the frequency of the Phase Lock Loop (PLL) after lock is established. The paper addresses the feasibility of lowering the clock frequency of the processing unit that models the PLL is addressed and modulator/demodulator functions of the system while maintaining synchronization with the memory unit and other peripherals. The system is simulated with Matlab considering various Signal-to-Noise Ratios (SNR). For a given SNR, the minimum frequency required for the PLL to maintain lock is determined. The Matlab file is translated to VHDL code, simulated and synthesized with Mentor tools, and the layout then generated. Mach-Pa 5-V software system from Mentor tools is utilized to estimate the power consumed by the simulated device. A Xilinx file is also generated and downloaded for Field Programmable Gate Arrays (FPGA) implementation. A 50 MHz clock frequency of the processing unit was first considered and then lowered to 20 MHz for the low power study. Lowering the base and clock frequency resulted in near 30% reduction in power.展开更多
Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from t...Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from telecommunication systems is often associated with seismic damage and functional loss of the telecommunication room.However,research related to this has been limited.In this study,shaking table tests were conducted for a full-scale typical telecommunication room,including a light-steel house and the necessary communication and power supply equipment.The tests not only focused on the seismic damage to all the structures but also considered the functions of the communication and power supply of the equipment.The interactions between these facilities and their effects on communication function were also investigated.Compared with the damage to structures,the interruption of the power supply due to earthquakes is a weak link.Finally,the damage indexes,together with their threshold values of different damage states for the communication and power supply equipment,were derived from the test results.The results of this research can contribute to the literature gaps regarding seismic performance studies of telecommunication rooms,and can serve as a valuable reference for future research on its seismic fragility and economic losses evaluation.展开更多
The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a co...The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a communication resources allocation model to reduce communication time delay in frequency regulation service.Communication device resources and wireless spectrum resources are allocated to distributed resources when they participate in frequency regulation.We reveal impact of communication resources allocation on time delay reduction and frequency regulation performance.Besides,we study communication resources allocation solution in high renewable energy penetrated power systems.We provide a case study based on the HRP-38 system.Results show communication time delay decreases distributed resources'ability to provide frequency regulation service.On the other hand,allocating more communication resources to distributed resources'communica-tion services improves their frequency regulation performance.For power systems with renewable energy penetration above 70%,required communications resources are about five times as many as 30%renewable energy penetrated power systems to keep frequency performance the same.Index Terms-Communication resources allocation,commun-ication time delay,distributed resource,frequency regulation,high renewable energy penetrated power system.展开更多
In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for n...In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for network optimization.This study introduces an innovative solution,the Gaussian Bare-Bones Levy Cheetah Optimizer(GBBLCO),addressing OPF challenges in power generation systems with stochastic RESs.The primary objective is to minimize the total operating costs of RESs,considering four functions:overall operating costs,voltage deviation management,emissions reduction,voltage stability index(VSI)and power loss mitigation.Additionally,a carbon tax is included in the objective function to reduce carbon emissions.Thorough scrutiny,using modified IEEE 30-bus and IEEE 118-bus systems,validates GBBLCO’s superior performance in achieving optimal solutions.Simulation results demonstrate GBBLCO’s efficacy in six optimization scenarios:total cost with valve point effects,total cost with emission and carbon tax,total cost with prohibited operating zones,active power loss optimization,voltage deviation optimization and enhancing voltage stability index(VSI).GBBLCO outperforms conventional techniques in each scenario,showcasing rapid convergence and superior solution quality.Notably,GBBLCO navigates complexities introduced by valve point effects,adapts to environmental constraints,optimizes costs while considering prohibited operating zones,minimizes active power losses,and optimizes voltage deviation by enhancing the voltage stability index(VSI)effectively.This research significantly contributes to advancing OPF,emphasizing GBBLCO’s improved global search capabilities and ability to address challenges related to local minima.GBBLCO emerges as a versatile and robust optimization tool for diverse challenges in power systems,offering a promising solution for the evolving needs of renewable energy-integrated power grids.展开更多
基金supported by Science and Technology Project of China Southern Power Grid Company Limited under Grant Number 036000KK52200058(GDKJXM20202001).
文摘Time synchronization(TS)is crucial for ensuring the secure and reliable functioning of the distribution power Internet of Things(IoT).Multi-clock source time synchronization(MTS)has significant advantages of high reliability and accuracy but still faces challenges such as optimization of the multi-clock source selection and the clock source weight calculation at different timescales,and the coupling of synchronization latency jitter and pulse phase difference.In this paper,the multi-timescale MTS model is conducted,and the reinforcement learning(RL)and analytic hierarchy process(AHP)-based multi-timescale MTS algorithm is designed to improve the weighted summation of synchronization latency jitter standard deviation and average pulse phase difference.Specifically,the multi-clock source selection is optimized based on Softmax in the large timescale,and the clock source weight calculation is optimized based on lower confidence bound-assisted AHP in the small timescale.Simulation shows that the proposed algorithm can effectively reduce time synchronization delay standard deviation and average pulse phase difference.
基金supported in part by the Jiangsu Provincial Natural Science Foundation for Excellent Young Scholars(Grant No.BK20170089)in part by the National Natural Science Foundation of China(Grant No.61671474)in part by the Jiangsu Provincial Natural Science Fund for Outstanding Young Scholars(Grant No.BK20180028).
文摘Haptic communications is recognized as a promising enabler of extensive services by enabling real-time haptic control and feedback in remote environments,e.g.,teleoperation and autonomous driving.Considering the strict transmission requirements on reliability and latency,Device-to-Device(D2D)communications is introduced to assist haptic communications.In particular,the teleoperators with poor channel quality are assisted by auxiliaries,and each auxiliary and its corresponding teleoperator constitute a D2D pair.However,the haptic interaction and the scarcity of radio resources pose severe challenges to the resource allocation,especially facing the sporadic packet arrivals.First,the contentionbased access scheme is applied to achieve low-latency transmission,where the resource scheduling latency is omitted and users can directly access available resources.In this context,we derive the reliability index of D2D pairs under the contention-based access scheme,i.e.,closed-loop packet error probability.Then,the reliability performance is guaranteed by bidirectional power control,which aims to minimize the sum packet error probability of all D2D pairs.Potential game theory is introduced to solve the problem with low complexity.Accordingly,a distributed power control algorithm based on synchronous log-linear learning is proposed to converge to the optimal Nash Equilibrium.Experimental results demonstrate the superiority of the proposed learning algorithm.
基金supported by National Natural Science Foundation of China(No.61901229 and No.62071242)the Project of Jiangsu Engineering Research Center of Novel Optical Fiber Technology and Communication Network(No.SDGC2234)+1 种基金the Open Research Project of Jiangsu Provincial Key Laboratory of Photonic and Electronic Materials Sciences and Technology(No.NJUZDS2022-008)the Post-Doctoral Research Supporting Program of Jiangsu Province(No.SBH20).
文摘This paper investigates a wireless powered and backscattering enabled sensor network based on the non-linear energy harvesting model, where the power beacon(PB) delivers energy signals to wireless sensors to enable their passive backscattering and active transmission to the access point(AP). We propose an efficient time scheduling scheme for network performance enhancement, based on which each sensor can always harvest energy from the PB over the entire block except its time slots allocated for passive and active information delivery. Considering the PB and wireless sensors are from two selfish service providers, we use the Stackelberg game to model the energy interaction among them. To address the non-convexity of the leader-level problem, we propose to decompose the original problem into two subproblems and solve them iteratively in an alternating manner. Specifically, the successive convex approximation, semi-definite relaxation(SDR) and variable substitution techniques are applied to find a nearoptimal solution. To evaluate the performance loss caused by the interaction between two providers, we further investigate the social welfare maximization problem. Numerical results demonstrate that compared to the benchmark schemes, the proposed scheme can achieve up to 35.4% and 38.7% utility gain for the leader and the follower, respectively.
基金This work was supported by Tianjin Natural Science Foundation(No.21JCZDJC00750).
文摘This paper discussed the experimental results of the performance of an organic Rankine cycle(ORC)system with an ultra-low temperature heat source.The low boiling point working medium R134a was adopted in the system.The simulated heat source temperature(SHST)in this work was set from 39.51°C to 48.60°C by the simulated heat source module.The influence of load percentage of simulated heat source(LPSHS)between 50%and 70%,the rotary valve opening(RVO)between 20%and 100%,the resistive load between 36Ωand 180Ωor the no-load of the generator,as well as the autumn and winter ambient temperature on the system performance were studied.The results showed that the stability of the system was promoted when the generator had a resistive load.The power generation(PG)and generator speed(GS)of the system in autumn were better than in winter,but the expander pressure ratio(EPR)was lower than in winter.Keep RVO unchanged,the SHST,the mass flow rate(MFR)of the working medium,GS,and the PG of the system increased with the increasing of LPSHS for different generator resistance load values.When the RVO was 60%,LPSHS was 70%,the SHST was 44.15°C and the resistive load was 72Ω,the highest PG reached 15.11 W.Finally,a simulation formula was obtained for LPSHS,resistance load,and PG,and its correlation coefficient was between 0.9818 and 0.9901.The formula can accurately predict the PG.The experimental results showed that the standard deviation between the experimental and simulated values was below 0.0792,and the relative error was within±5%.
基金supported by the Graduate Innovation Program of China University of Mining and Technology (2022WLKXJ016)in part by the Postgraduate Research&Practice Innovation Program of Jiangsu Province (KYCX222549)+3 种基金supported by Shaanxi Provincial Natural Science Foundation of China (2023-JC-YB-510)the Fundamental Research Funds for the Central Universities,CHD (300102322103)supported in part by Natural Science Foundation of Jiangsu Province (BK20200488)supported in part by Challenge Cup National Student Curricular Academic Science and Technology Works Competition (DCXM202212)。
文摘In this paper,the channel capacity of the multiple-input multiple-output(MIMO)visible light communication(VLC)system is investigated under the peak,average optical and electrical power constraints.Finding the channel capacity of MIMO VLC is shown to be a mixed integer programming problem.To address this open problem,we propose an inexact gradient projection method to find the channel capacity-achieving discrete input distribution and the channel capacity of MIMO VLC.Also we derive both upper and lower bounds of the capacity of MIMO VLC with the closed-form expressions.Furthermore,by considering practical discrete constellation inputs,we develop the optimal power allocation scheme to maximize transmission rate of MIMO VLC system.Simulation results show that more discrete points are needed to achieve the channel capacity as SNR increases.Both the upper and lower bounds of channel capacity are tight at low SNR region.In addition,comparing the equal power allocation,the proposed power allocation scheme can significantly increase the rate for the low-order modulation inputs.
基金the National Natural Science Foundation of China (Grant No. 11874131)Open Fund Project of Key Laboratory of Underwater Acoustic Countermeasures Technology (Grant No. 2021-JCJQ-LB033-05)。
文摘Similar to air reverberation chambers, non-anechoic water tanks are important acoustic measurement devices that can be used to measure the sound power radiated from complex underwater sound sources using diffusion field theory. However,the problem of the poor applicability of low-frequency measurements in these tanks has not yet been solved. Therefore,we propose a low-frequency acoustic measurement method based on sound-field correction(SFC) in an enclosed space that effectively solves the problem of measuring the sound power from complex sound sources below the Schroeder cutoff frequency in a non-anechoic tank. Using normal mode theory, the transfer relationship between the mean-square sound pressure in an underwater enclosed space and the free-field sound power of the sound source is established, and this is regarded as a correction term for the sound field between this enclosed space and the free field. This correction term can be obtained based on previous measurements of a known sound source. This term can then be used to correct the mean-square sound pressure excited by any sound source to be tested in this enclosed space and equivalently obtain its free-field sound power. Experiments were carried out in a non-anechoic water tank(9.0 m × 3.1 m × 1.7 m) to confirm the validity of the SFC method. Through measurements with a spherical sound source(whose free-field radiation characteristics are known),the correction term of the sound field between this water tank and the free field was obtained. On this basis, the sound power radiated from a cylindrical shell model under the action of mechanical excitation was measured. The measurement results were found to have a maximum deviation of 2.9 d B from the free-field results. These results show that the SFC method has good applicability in the frequency band above the first-order resonant frequency in a non-anechoic tank. This greatly expands the potential low-frequency applications of non-anechoic tanks.
文摘Power line communication(PLC)provides intelligent electrical functions such as power quality measurement,fault surveys,and remote control of electrical network.Most of research works have been done in low voltage(LV)scenario due to the fast development of in-home PLC.The aim of this paper is to evaluate the link-level performance of a medium voltage(MV)MIMO-OFDM communication system based on transmission link under underground power line channel.The MIMO channel is modeled as a modified multipath model in the presence of impulsive noise and background noise.We first perform a measurement on the practical MV MIMO channel parameters for a section of buried cable of 1 km long in Ganzhou city,Jiangxi province,China.Based on the measured channel,we design the frame structure based on an IEEE standard for broadband over power line networks[1]to support MV MIMO-OFDM transmission.According to designed frame structure,we design an encoder and a decoder for a dual binary tail-biting turbo code and optimize some key decoder parameters for low bit error rate performance.Finally,the link-level performance for both spatial multiplexing and spatial diversity are evaluated.Numeral results show that MV MIMO-OFDM is a promising approach to provide both high data rate and link reliability for PLC.
基金supported by the National Natural Science Foundation of China(61674049,U19A2053)State Key Lab of ASIC and System(2019KF003)the Fundamental Research Funds for Central Universities(JZ2019HGTB0092)。
文摘Traditional magnetically coupled resonant wireless power transfer technology uses fixed distances between coils for research,to prevent fluctuations in the receiving voltage,and lead to reduce transmission efficiency.This paper proposes a closed-loop control wireless communication wireless power transfer system with a wearable four-coil structure to stabilize the receiving voltage fluctuation caused by changes in the displacement between the coils.Test results show that the system can provide stable receiving voltage,no matter how the distance between the transmitting coil and the receiving coil is changed.When the transmission distance is 20 mm,the power transfer efficiency of the system can reach 18.5%under the open-loop state,and the stimulus parameters such as the stimulation period and pulse width can be adjusted in real time through the personal computer terminal.
基金supported in part by the Jiangsu Natural Science Foundation of China under Grant BK20180013in part by the Shenzhen Science and Technology Innovation Committee(STIC)under Grant JCYJ20180306174439784.
文摘The pulse-width-modulated(PWM)current-source converters(CSCs)fed electric machine systems can be considered as a type of high reliability energy conversion systems,since they work with the long-life DC-link inductor and offer high fault-tolerant capability for short-circuit faults.Besides,they provide motor friendly waveforms and four-quadrant operation ability.Therefore,they are suitable for high-power applications of fans,pumps,compressors and wind power generation.The purpose of this paper is to comprehensively review recent developments of key technologies on modulation and control of high-power(HP)PWM-CSC fed electric machines systems,including reduction of low-order current harmonics,suppression of inductor–capacitor(LC)resonance,mitigation of common-mode voltage(CMV)and control of modular PWM-CSC fed systems.In particular,recent work on the overlapping effects during commutation,LC resonance suppression under fault-tolerant operation and collaboration of modular PMW-CSCs are described.Both theoretical analysis and some results in simulations and experiments are presented.Finally,a brief discussion regarding the future trend of the HP CSC fed electric machines systems is presented.
基金Meg-science Engineering Project of the Chinese Academy of Sciences
文摘The experiential adjustment process in an experiment on the ion source of the neutral beam injector system for the HT-7 Tokamak is reported in this paper. With regard to the data obtained in the same condition, in arranging the arc current intensities of every shot with a decay rank, the distributions of the arc current intensity correspond to the power laws, and the distribution obtained in the condition with the cryo-pump corresponds to the double Pareto distribution. Using the similar study method, the distributions of the arc duration are close to the power laws too. These power law distributions are formed rather naturally instead of being the results of purposeful seeking.
文摘This paper analyses the performance request of arc welding power source used in intelligent control of weld pool shape in pulsed GTAW, and develops a sample power source. The main circuit of the power source takes the structure of single ended inverter with two switches, and takes IGBTs as power switches. The working frequency of the inverter is set at 20 kHz. The control circuit takes PWM circuit as center, and uses single chip computer to complete the manage functions such as the control of working sequence, setting and changing of the welding parameters, sensing of the welding states and communication with outside computer etc. The dynamic reacting time of the whole power is 1 ms, the range of the output current is 5~250 A, the precision of the output current reaches to 1 A. The power strikes arc by contacting workpiece under 5 A, and have convenient interface with system computer. All above shows this power source is one with high performance.
文摘New method for determination of optimal placement and value of installed capacity of renewable source of energy (RES) by the criterion of minimum losses of active power, that allows taking into consideration the dependence of RES on natural conditions of region, schedule of energy supply, parameters and configuration of distribution network is suggested in the paper. Results of computations of test scheme confirm the efficiency of the proposed method and its simplicity as compared with the methods considered in literature sources.
基金This work has been supported in part by the National Natural Science Foundation of China(61671205)in part by the Shanghai Rising-Star Program(21QA1402700)in part by the open research fund of National Mobile Communications Research Laboratory,Southeast University(No.2020D02).
文摘In this paper,a beamforming scheme to improve the coverage in high-speed railway communication systems is investigated.A dedicated coverage model,where the coverage cell is an ellipse rather than the traditional circular or linear,is considered.Based on the elliptical coverage cell,an optimization problem for the beamforming design is formulated to maximize the percentage of railway coverage,subject to the constraints on equal expected designed propagation gain(the gain obtained by a combination of designed beam and propagation channel)on the elliptical curve,i.e.,the expectation of designed propagation gain on the elliptical curve are all equal.Considering that the coverage can be improved by increasing the minimum designed propagation gain on the railway,the problem can be recast to maximizing the equal expected designed propagation gain on the elliptical curve.Subsequently,a beamforming design with an improved β-fairness power allocation,where the optimization problem is formulated to maximize the minimum expected received power over time with the constraints on elliptical cell based beamforming and mobile service amount,is proposed to further improve the coverage.An alternating iteration algorithm is developed to find the optimal beamforming vector and the instantaneous transmit power.Through numerical results,it is found that the beamforming designed on the elliptical curve covers longer railway than beamforming designed on the railway directly,and the coverage of elliptical cell based beamforming can be increased with the eccentricity.In addition,beamforming with the improvedβ-fairness power allocation can further improve the railway coverage and mobile service amount simultaneously.Moreover,it is shown that the larger eccentricity of the ellipse with appropriately chosen BS location,the larger coverage distance.
基金This work was supported by the National Natural Science Foundation of China(61871058)Key Special Project in Intergovernmental International Scientific and Technological Innovation Cooperation of National Key Research and Development Program(2017YFE0118600).
文摘Device-to-Device(D2D)communication is a promising technology that can reduce the burden on cellular networks while increasing network capacity.In this paper,we focus on the channel resource allocation and power control to improve the system resource utilization and network throughput.Firstly,we treat each D2D pair as an independent agent.Each agent makes decisions based on the local channel states information observed by itself.The multi-agent Reinforcement Learning(RL)algorithm is proposed for our multi-user system.We assume that the D2D pair do not possess any information on the availability and quality of the resource block to be selected,so the problem is modeled as a stochastic non-cooperative game.Hence,each agent becomes a player and they make decisions together to achieve global optimization.Thereby,the multi-agent Q-learning algorithm based on game theory is established.Secondly,in order to accelerate the convergence rate of multi-agent Q-learning,we consider a power allocation strategy based on Fuzzy C-means(FCM)algorithm.The strategy firstly groups the D2D users by FCM,and treats each group as an agent,and then performs multi-agent Q-learning algorithm to determine the power for each group of D2D users.The simulation results show that the Q-learning algorithm based on multi-agent can improve the throughput of the system.In particular,FCM can greatly speed up the convergence of the multi-agent Q-learning algorithm while improving system throughput.
文摘Adaptive bit-loading algorithms can improve the performance of OFDM systems significantly. The tradeoff between the performance of the algorithm and its computational complexity is essential for the implementation of loading algorithms. In this paper, we present a low complexity non-iterative discrete bit-loading algorithm to maximize the data rate subject to specified target BER and uniform power allocation. Simulation results show that the proposed algorithm outperforms the equal-BER loading and achieves similar rates to incremental allocation, yet with much lower complexity.
文摘Network information communication technology in power systems is the key to ensuring the safe and efficient operation of power grids.The network information communication technology itself has advantages in automation operation and information transmission,thus is widely applied to the power system.In the case of ensuring that the power system is compatible with the network information communication technology,the control of the power system can be strengthened,and the operational efficiency of the power system can be improved.This paper mainly analyzes the specific application of network information communication technology in power system.
文摘A low power model for Code Division Multiple Access (CDMA) based cellular communication system is developed. The dynamic power is minimized by reducing the frequency of the Phase Lock Loop (PLL) after lock is established. The paper addresses the feasibility of lowering the clock frequency of the processing unit that models the PLL is addressed and modulator/demodulator functions of the system while maintaining synchronization with the memory unit and other peripherals. The system is simulated with Matlab considering various Signal-to-Noise Ratios (SNR). For a given SNR, the minimum frequency required for the PLL to maintain lock is determined. The Matlab file is translated to VHDL code, simulated and synthesized with Mentor tools, and the layout then generated. Mach-Pa 5-V software system from Mentor tools is utilized to estimate the power consumed by the simulated device. A Xilinx file is also generated and downloaded for Field Programmable Gate Arrays (FPGA) implementation. A 50 MHz clock frequency of the processing unit was first considered and then lowered to 20 MHz for the low power study. Lowering the base and clock frequency resulted in near 30% reduction in power.
基金Key Project of the Key Laboratory of Earthquake Engineering and Engineering Vibration,China Earthquake Administration under Grant Nos.2020EEEVL0502 and 2019EEEVL0304。
文摘Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from telecommunication systems is often associated with seismic damage and functional loss of the telecommunication room.However,research related to this has been limited.In this study,shaking table tests were conducted for a full-scale typical telecommunication room,including a light-steel house and the necessary communication and power supply equipment.The tests not only focused on the seismic damage to all the structures but also considered the functions of the communication and power supply of the equipment.The interactions between these facilities and their effects on communication function were also investigated.Compared with the damage to structures,the interruption of the power supply due to earthquakes is a weak link.Finally,the damage indexes,together with their threshold values of different damage states for the communication and power supply equipment,were derived from the test results.The results of this research can contribute to the literature gaps regarding seismic performance studies of telecommunication rooms,and can serve as a valuable reference for future research on its seismic fragility and economic losses evaluation.
基金supported in part by the National Key R&D Program of China(No.2021YFB2401200)the National Natural Science Foundation of China Enterprise Innovation and Development Joint Fund(No.U21B2002).
文摘The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a communication resources allocation model to reduce communication time delay in frequency regulation service.Communication device resources and wireless spectrum resources are allocated to distributed resources when they participate in frequency regulation.We reveal impact of communication resources allocation on time delay reduction and frequency regulation performance.Besides,we study communication resources allocation solution in high renewable energy penetrated power systems.We provide a case study based on the HRP-38 system.Results show communication time delay decreases distributed resources'ability to provide frequency regulation service.On the other hand,allocating more communication resources to distributed resources'communica-tion services improves their frequency regulation performance.For power systems with renewable energy penetration above 70%,required communications resources are about five times as many as 30%renewable energy penetrated power systems to keep frequency performance the same.Index Terms-Communication resources allocation,commun-ication time delay,distributed resource,frequency regulation,high renewable energy penetrated power system.
基金supported by the Deanship of Postgraduate Studies and Scientific Research at Majmaah University in Saudi Arabia under Project Number(ICR-2024-1002).
文摘In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for network optimization.This study introduces an innovative solution,the Gaussian Bare-Bones Levy Cheetah Optimizer(GBBLCO),addressing OPF challenges in power generation systems with stochastic RESs.The primary objective is to minimize the total operating costs of RESs,considering four functions:overall operating costs,voltage deviation management,emissions reduction,voltage stability index(VSI)and power loss mitigation.Additionally,a carbon tax is included in the objective function to reduce carbon emissions.Thorough scrutiny,using modified IEEE 30-bus and IEEE 118-bus systems,validates GBBLCO’s superior performance in achieving optimal solutions.Simulation results demonstrate GBBLCO’s efficacy in six optimization scenarios:total cost with valve point effects,total cost with emission and carbon tax,total cost with prohibited operating zones,active power loss optimization,voltage deviation optimization and enhancing voltage stability index(VSI).GBBLCO outperforms conventional techniques in each scenario,showcasing rapid convergence and superior solution quality.Notably,GBBLCO navigates complexities introduced by valve point effects,adapts to environmental constraints,optimizes costs while considering prohibited operating zones,minimizes active power losses,and optimizes voltage deviation by enhancing the voltage stability index(VSI)effectively.This research significantly contributes to advancing OPF,emphasizing GBBLCO’s improved global search capabilities and ability to address challenges related to local minima.GBBLCO emerges as a versatile and robust optimization tool for diverse challenges in power systems,offering a promising solution for the evolving needs of renewable energy-integrated power grids.