期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Prestage Engineering for Dacheng Coalbed Gas Test Completed
1
《China Oil & Gas》 CAS 1998年第3期168-168,共1页
关键词 TEST Prestage engineering for Dacheng Coalbed Gas Test Completed
下载PDF
Primary Reconstruction of Completely Biologic Tissue Engineered Blood Vessel and Related Basic Research
2
作者 Xiu-Hua ZHANG Yan ZHANG Yu-Quan LI Xiang-Qun YANGLin ZHANG Hui-Long HUANG(Institute of Biomedical Engineering, The Second Military Medical University, Shanghai 200433,China) 《生物医学工程学杂志》 EI CAS CSCD 北大核心 2005年第S1期51-52,共2页
关键词 Primary Reconstruction of Completely Biologic Tissue Engineered Blood Vessel and Related Basic Research Basic
下载PDF
Gao Zongyu:Engineer and Designer of World-class Bridges
3
作者 ZHOU LIN 《China Today》 2016年第10期36-39,共4页
PLANNED in 2003,construction of the 1,092-meter-long ShanghaiNantong Railway Yangtze River Bridge–the world’s longest rail-cumroad cable-stayed steel bridge–started in 2014.On completion in 2019,it will span the 13... PLANNED in 2003,construction of the 1,092-meter-long ShanghaiNantong Railway Yangtze River Bridge–the world’s longest rail-cumroad cable-stayed steel bridge–started in 2014.On completion in 2019,it will span the 130 km.between the two cities,shortening to one hour the drive from Shanghai to Nantong. 展开更多
关键词 completion Designer Major stayed Yangtze engineer shortening railway struction highway
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部