According to the construction project of the crustal deformation mobile monitoring network in the cascade hydropower stations built in the lower reaches of Jinsha River,this paper analyzes the design ideas and layout ...According to the construction project of the crustal deformation mobile monitoring network in the cascade hydropower stations built in the lower reaches of Jinsha River,this paper analyzes the design ideas and layout principles of crustal deformation mobile monitoring used in the monitoring of reservoir induced earthquakes. This paper introduces three types of monitoring networks used in the Xiluodu reservoir and Xiangjiaba reservoir, as well as the work already undertaken,in order to provide a kind of reference for the related engineering construction and comprehensive monitoring of reservoir induced earthquakes.展开更多
The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ...The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.展开更多
Safety monitoring and stability analysis of high slopes are important for high dam construction in high mountainous regions or precipitous gorges. In this paper, deformation characteristics of toppling block at upper ...Safety monitoring and stability analysis of high slopes are important for high dam construction in high mountainous regions or precipitous gorges. In this paper, deformation characteristics of toppling block at upper abutment, deforming tensile rip wedge in the middle part and deep fractures are comprehensively analyzed based on the geological conditions, construction methods and monitoring results of left abutment slope in Jinping Ⅰ hydropower station. Safety analyses of surface and shallow-buried rock masses and the corresponding anchorage system are presented. The monitoring results indicate that the global stability of the large wedge block in the left abutment is effectively under control, and the abutment slope is stable in a global sense. After the completion of excavation, the deformations of toppling block at the top of the slope and deep fracture zone continue at a very low rate, which can be explained as 'rock mass creep'. Further monitoring and analysis are needed.展开更多
Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is lo...Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.展开更多
In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications su...In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications such as forecast of marine environment,prevention and mitigation of disaster,exploitation of marine resources,marine environmental protection,and management of transportation safety.In this paper,we summarise the composition,development courses,and present operational status of three systems of operational in-situ marine monitoring,namely coastal marine automated network station,ocean data buoy and voluntary observing ship measuring and reporting system.Additionally,we discuss the technical development in these in-situ systems and achievements in the key generic technologies along with future development trends.展开更多
基金sponsored by the Key Construction Program of the Three Gorges Project,China
文摘According to the construction project of the crustal deformation mobile monitoring network in the cascade hydropower stations built in the lower reaches of Jinsha River,this paper analyzes the design ideas and layout principles of crustal deformation mobile monitoring used in the monitoring of reservoir induced earthquakes. This paper introduces three types of monitoring networks used in the Xiluodu reservoir and Xiangjiaba reservoir, as well as the work already undertaken,in order to provide a kind of reference for the related engineering construction and comprehensive monitoring of reservoir induced earthquakes.
文摘The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.
文摘Safety monitoring and stability analysis of high slopes are important for high dam construction in high mountainous regions or precipitous gorges. In this paper, deformation characteristics of toppling block at upper abutment, deforming tensile rip wedge in the middle part and deep fractures are comprehensively analyzed based on the geological conditions, construction methods and monitoring results of left abutment slope in Jinping Ⅰ hydropower station. Safety analyses of surface and shallow-buried rock masses and the corresponding anchorage system are presented. The monitoring results indicate that the global stability of the large wedge block in the left abutment is effectively under control, and the abutment slope is stable in a global sense. After the completion of excavation, the deformations of toppling block at the top of the slope and deep fracture zone continue at a very low rate, which can be explained as 'rock mass creep'. Further monitoring and analysis are needed.
文摘Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.
基金The National Key Research and Development Program of China under contract No.2022YFC3104200the Key R&D Program of Shandong Province,China under contract No.2023ZLYS01+3 种基金the Consulting and Research Project of the Chinese Academy of Engineering under contract Nos 2022-XY-21,2022-DFZD-35,2023-XBZD-09 and 2021-XBZD-13the Major Innovation Special Project of Qilu University of Technology(Shandong Academy of Sciences),Science Education Industry Integration Pilot Project under contract No.2023HYZX01Special Funds for“Mount Taishan Scholars”Construction Projectthe Special Funds of Laoshan Laboratory.
文摘In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications such as forecast of marine environment,prevention and mitigation of disaster,exploitation of marine resources,marine environmental protection,and management of transportation safety.In this paper,we summarise the composition,development courses,and present operational status of three systems of operational in-situ marine monitoring,namely coastal marine automated network station,ocean data buoy and voluntary observing ship measuring and reporting system.Additionally,we discuss the technical development in these in-situ systems and achievements in the key generic technologies along with future development trends.