Acoustic Non-Destructive Testing Technology in Concrete Bridge Inspection and Pile Foundation Detection
1
作者 Wei Fu 《Journal of Architectural Research and Development》 2024年第1期20-25,共6页
This article takes the actual construction project of a certain concrete bridge project as an example to analyze the application of acoustic non-destructive testing technology in its detection.It includes an overview ... This article takes the actual construction project of a certain concrete bridge project as an example to analyze the application of acoustic non-destructive testing technology in its detection.It includes an overview of a certain bridge construction project studied and acoustic non-destructive testing technology and the application of acoustic non-destructive testing technology in actual testing.This analysis hopes to provide some guidelines for acoustic non-destructive testing of modern concrete bridge projects. 展开更多
关键词 concrete bridge bridge detection Acoustic detection Non-destructive testing technology
下载PDF
Recent Construction Technology Innovations and Practices for Large-Span Arch Bridges in China
2
作者 Jielian Zheng 《Engineering》 SCIE EI CAS CSCD 2024年第10期110-129,共20页
Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of ... Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed. 展开更多
关键词 concrete-filled steel tubular arch bridges Steel-reinforced concrete arch bridges Cable-stayed fastening-hanging cantilevered assembly Non-rocky thrust abutment foundation Stiff skeleton Encasing concrete pouring Longitudinal reinforcement optimization
下载PDF
Numerical Simulation Analysis of Welded Joints in Arch Ribs of Large Span Steel Pipe Arch Bridges
3
作者 Deer He Nianchun Deng Xiuning Peng 《Journal of Harbin Institute of Technology(New Series)》 CAS 2024年第3期19-30,共12页
In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for weld... In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for welded joints of arch-ribbed steel tubes using 7-,8-and 9-layer welds is carried out and its accuracy is demonstrated.The steel pipe welding temperature changes,residual stress distribution,different processes residual stress changes in the law,the prediction of post-weld residual stress distribution and deformation are studied in this paper.The results show that the temperature field values and test results are more consistent with the accuracy of numerical simulation of welding,the welding process is mainly in the form of heat transfer;Residual high stresses are predominantly distributed in the Fusion zone(FZ)and Heat-affected zone(HAZ),with residual stress levels tending to decrease from the center of the weld along the axial path,the maximum stress appears in the FZ and HAZ junction;The number of welding layers has an effect on the residual stress distribution,the number of welding layers increases,the residual stress tends to decrease,while the FZ and HAZ high stress area range shrinks;Increasing the number of plies will increase the amount of residual distortion. 展开更多
关键词 steel pipe and concrete arch bridge arch rib multi-pass welding residual stress numerical simulation
下载PDF
Bridge Condition Assessment by Visual Inspection-Croatian Experience
4
作者 Goran Puž 《Journal of Civil Engineering and Architecture》 2024年第10期504-514,共11页
Most decisions relating to bridge maintenance are founded on assessments that are based on visual inspections conducted by specially trained engineers,using procedures and aids defined in the management system.Visual ... Most decisions relating to bridge maintenance are founded on assessments that are based on visual inspections conducted by specially trained engineers,using procedures and aids defined in the management system.Visual inspection is the main tool for bridge condition assessment,and is therefore of crucial significance for planning periodic maintenance activities.Paper shall present the study aimed at harmonizing bridge assessment activities,which was conducted in early 2012 in company Hrvatske ceste-Croatian National Road Authority.Small RC bridges were chosen for this study,since visual inspection is usually only tool utilized for their assessment.Ratings obtained by inspection were analyzed using methods of mathematical statistics.The results point to weaknesses in the current assessment system,while the study itself constitutes a good basis for further improvement of management aids,manuals and procedures for bridge inspection. 展开更多
关键词 Visual inspection concrete bridges bridge management bridge rating
下载PDF
Real-Time Detection of Cracks on Concrete Bridge Decks Using Deep Learning in the Frequency Domain 被引量:9
5
作者 Qianyun Zhang Kaveh Barri +1 位作者 Saeed K.Babanajad Amir H.Alavi 《Engineering》 SCIE EI 2021年第12期1786-1796,共11页
This paper presents a vision-based crack detection approach for concrete bridge decks using an integrated one-dimensional convolutional neural network(1D-CNN)and long short-term memory(LSTM)method in the image frequen... This paper presents a vision-based crack detection approach for concrete bridge decks using an integrated one-dimensional convolutional neural network(1D-CNN)and long short-term memory(LSTM)method in the image frequency domain.The so-called 1D-CNN-LSTM algorithm is trained using thousands of images of cracked and non-cracked concrete bridge decks.In order to improve the training efficiency,images are first transformed into the frequency domain during a preprocessing phase.The algorithm is then calibrated using the flattened frequency data.LSTM is used to improve the performance of the developed network for long sequence data.The accuracy of the developed model is 99.05%,98.9%,and 99.25%,respectively,for training,validation,and testing data.An implementation framework is further developed for future application of the trained model for large-scale images.The proposed 1D-CNN-LSTM method exhibits superior performance in comparison with existing deep learning methods in terms of accuracy and computation time.The fast implementation of the 1D-CNN-LSTM algorithm makes it a promising tool for real-time crack detection. 展开更多
关键词 Crack detection concrete bridge deck Deep learning REAL-TIME
下载PDF
Crack detection of reinforced concrete bridge using video image 被引量:8
6
作者 许薛军 张肖宁 《Journal of Central South University》 SCIE EI CAS 2013年第9期2605-2613,共9页
With the digital image technology,a crack detection method of reinforced concrete bridge was studied for the performance assessment.The effects including the image gray level,pixel rate,noise filter,and edge detection... With the digital image technology,a crack detection method of reinforced concrete bridge was studied for the performance assessment.The effects including the image gray level,pixel rate,noise filter,and edge detection were analyzed considering cracks qualities.A computer program was developed by visual C++6.0 programming language to detect the cracks,which was tested by 15cases of bridge video images.The results indicate that the relative error is within 6%for cracks larger than 0.3 mm cracks and it is less than 10%for crack width between 0.2 mm and 0.3 mm.In addition,for the crack below 0.1 mm,the relative error is more than30%because the bridge is in safe stage and it is very difficult to detect the actual width of crack. 展开更多
关键词 concrete bridge crack detection computer vision image processing
下载PDF
Fragility curves of concrete bridges retrofitted by column jacketing 被引量:6
7
作者 MasanobuShinozuka Sang-HoonKim +1 位作者 Shigeru Kushiyama Jin-Hak Yi 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2002年第2期195-205,共11页
The Northridge earthquake inflicted various levels of damage upon a large number of Caltrans' bridges not retrofitted by column jacketing.In this respect,this study represents results of fragility curve developmen... The Northridge earthquake inflicted various levels of damage upon a large number of Caltrans' bridges not retrofitted by column jacketing.In this respect,this study represents results of fragility curve development for two (2) sample bridges typical in southern California,strengthened for seismic retrofit by means of steel jacketing of bridge columns.Monte Carlo simulation is performed to study nonlinear dynamic responses of the bridges before and after column retrofit.Fragility curves in this study are represented by lognormal distribution functions with two parameters and developed as a function of PGA.The sixty (60) ground acceleration time histories for the Los Angeles area developed for the Federal Emergency Management Agency (FEMA) SAC (SEAOC-ATC CUREe) steel project are used for the dynamic analysis of the bridges. The improvement in the fragility with steel jacketing is quantified by comparing fragility curves of the bridge before and after column retrofit.In this first attempt to formulate the problem of fragility enhancement,the quantification is made by comparing the median values of the fragility curves before and after the retrofit.Under the hypothesis that this quantification also applies to empirical fragility curves developed on the basis of Northridge earthquake damage,the enhanced version of the empirical curves is developed for the ensuing analysis to determine the enhancement of transportation network performance due to the retrofit. 展开更多
关键词 fragility curves concrete bridges RETROFIT column jacketing nonlinear dynanlic ANALYSIS DUCTILITY
下载PDF
Determination of initial cable force of cantilever casting concrete arch bridge using stress balance and influence matrix methods 被引量:7
8
作者 TIAN Zhong-chu PENG Wen-ping +2 位作者 ZHANG Jian-ren JIANG Tian-yong DENG Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第11期3140-3155,共16页
Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and inf... Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge. 展开更多
关键词 concrete arch bridge cantilever casting initial cable force stress balance method influence matrix method
下载PDF
Earthquake simulation test of circular reinforced concrete bridge column under multidirectional seismic excitation 被引量:4
9
作者 Junichi Sakai Shigeki Unjoh 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2006年第1期103-110,共8页
Structures behave multi-directionally when subjected to earthquake excitation. Thus, it is essential to evaluate the effect of multidirectional loading on the dynamic response and seismic performance of reinforced con... Structures behave multi-directionally when subjected to earthquake excitation. Thus, it is essential to evaluate the effect of multidirectional loading on the dynamic response and seismic performance of reinforced concrete bridge columns in order to develop more advanced and reliable design procedures. To investigate such effects, a 1/4 scaled circular reinforced concrete bridge column specimen was tested under two horizontal and one vertical components of a strong motion that has long duration with several strong pulses. Damage progress of reinforced concrete columns subjected to strong excitation was evaluated from the test. The test results demonstrate that the lateral force response in the principal directions become smaller than computed flexural capacity due to the bilateral flexural loading effects, and that the lateral response is not significantly affected by the fluctuation of the axial force because the horizontal response and axial force barely reached the maximum simultaneously due to difference of the predominant natural periods between the vertical and the horizontal directions. Accuracy of fiber analyses is discussed using the test results. 展开更多
关键词 multidirectional seismic excitation reinforced concrete bridge columns shake table test nonlinear dynamic analyses fiber analysis
下载PDF
Numerical investigation of temperature gradient-induced thermal stress for steel–concrete composite bridge deck in suspension bridges 被引量:5
10
作者 WANG Da DENG Yang +1 位作者 LIU Yong-ming LIU Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第1期185-195,共11页
A3D finite element model(FEM)with realistic field measurements of temperature distributions is proposed to investigate the thermal stress variation in the steel–concrete composite bridge deck system.First,a brief lit... A3D finite element model(FEM)with realistic field measurements of temperature distributions is proposed to investigate the thermal stress variation in the steel–concrete composite bridge deck system.First,a brief literaturereview indicates that traditional thermal stress calculation in suspension bridges is based on the2D plane structure with simplified temperature profiles on bridges.Thus,a3D FEM is proposed for accurate stress analysis.The focus is on the incorporation of full field arbitrary temperature profile for the stress analysis.Following this,the effect of realistic temperature distribution on the structure is investigated in detail and an example using field measurements of Aizhai Bridge is integrated with the proposed3D FEM model.Parametric studies are used to illustrate the effect of different parameters on the thermal stress distribution in the bridge structure.Next,the discussion and comparison of the proposed methodology and simplified calculation method in the standard is given.The calculation difference and their potential impact on the structure are shown in detail.Finally,some conclusions and recommendations for future bridge analysis and design are given based on the proposed study. 展开更多
关键词 suspension bridge steel–concrete composite bridge deck vertical temperature gradient finite element method thermal stress
下载PDF
Dynamic finite element model updating of prestressed concrete continuous box-girder bridge 被引量:6
11
作者 Lin Xiankun Zhang Lingmi +1 位作者 Guo Qintao Zhang Yufeng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2009年第3期399-407,共9页
The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a... The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge . 展开更多
关键词 prestressed concrete continuous box-girder bridge field ambient vibration testing dynamic characteristics model updating accelerating genetic algorithm objective function
下载PDF
Cellular Automata-based Chloride Ion Diffusion Simulation of Concrete Bridges under Multi-factor Coupling Actions 被引量:2
12
作者 ZHU Jinsong HE Likun 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2012年第1期160-165,共6页
In order to accurately simulate the diffusion of chloride ion in the existing concrete bridge and acquire the precise chloride ion concentration at given time, a cellular automata (CA)-based model is proposed. The p... In order to accurately simulate the diffusion of chloride ion in the existing concrete bridge and acquire the precise chloride ion concentration at given time, a cellular automata (CA)-based model is proposed. The process of chloride ion diffusion is analyzed by the CA-based method and a nonlinear solution of the Fick's second law is obtained. Considering the impact of various factors such as stress states, temporal and spatial variability of diffusion parameters and water-cement ratio on the process of chloride ion diffusion, the model of chloride ion diffusion under multi-factor coupling actions is presented. A chloride ion penetrating experiment reported in the literature is used to prove the effectiveness and reasonability of the present method, and a T-type beam is taken as an illustrative example to analyze the process of chloride ion diffusion in practical application. The results indicate that CA-based method can simulate the diffusion of chloride ion in the concrete structures with acceptable precision. 展开更多
关键词 concrete bridge chloride ion diffusion cellular automata multi-factor coupling actions
下载PDF
Time-dependent behavior comparison of long-span concrete arch bridge between prototype and model 被引量:1
13
作者 WANG Yong-bao QIN Peng-ju +2 位作者 LIU Zhi-hua ZHANG Xiao MAO Min 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第5期1565-1577,共13页
Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction seque... Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction sequence and the time-dependent behavior of CABSS,an experimental study of a model bridge was explored.But the measured displacement and stress ratios of arch rib between prototype and model bridge did not subject to linear similarity relation when the time-dependent behavior was considered.So,the three-dimensional finite element models were established,and verified by the measured data.Then,the displacements and stresses of the prototype and model were compared with each other,when the elastic analysis or coupling of temperature and shrinkage,creep effect was considered.Furthermore,a parametric study was studied.The results showed that when the temperature,shrinkage and creep effect of concrete are considered,the finite element analysis results of prototype and model agree well with the measured results.The displacement and stress ratios of prototype and model bridge in construction and bridge completed stage do not present the geometric similarity ratio 7.5 and 1.0,respectively.They are also much influenced by concrete predicting model and variation of temperature. 展开更多
关键词 concrete arch bridge time-dependent behavior finite element model test stiffened skeleton
下载PDF
Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder 被引量:6
14
作者 ZHANG Zhi-cheng XIE Xu +1 位作者 ZHANG He CHEN Heng-zhi 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2007年第5期682-692,共11页
A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate... A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge. 展开更多
关键词 Ultimate strength concrete filled steel tubular (CFST) arch bridge Stiffening girder Fiber model beam element Construction process
下载PDF
Simplified full-depth precast concrete deck panel systems for accelerated bridge construction 被引量:4
15
作者 Zhongguo John Ma Yulin Zhan +2 位作者 Lin Xiao Lungui Li Weiwei Lu 《Journal of Modern Transportation》 2016年第4期251-260,共10页
A simplified full-depth precast concrete deck panel system for accelerating bridge construction (ABC) is introduced and a finite dement analysis (FEA) is con- ducted to investigate the static and dynamic responses... A simplified full-depth precast concrete deck panel system for accelerating bridge construction (ABC) is introduced and a finite dement analysis (FEA) is con- ducted to investigate the static and dynamic responses of this conceptual deck system. The FEA results are compared to those of the traditional full-depth precast concrete deck panel system. The comparison results show that the mechanical behavior of the new deck system is different from that of the traditional deck system. The concrete decks in the new system act as two-way slabs, instead of the one-way slab in the traditional system. Meanwhile, the connections in both the longitudinal and transverse direc- tions may need to accommodate the negative moments. Compared to those in the traditional system, the longitu- dinal nominal stress at middle span increases a lot in the new deck system and the effective flange width varies significantly. In addition, the dynamic results show that the impact factor is influenced by the spacing of connections. Finally, some design concerns of the new deck system are proposed. 展开更多
关键词 Simplified full-depth precast concrete deckpanel systems ~ Accelerated bridge construction ~ Structuralresponse
下载PDF
Evaluation method research on prestressed concrete bridges
16
作者 黄侨 林阳子 任远 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第2期155-159,共5页
Considering the construction features of prestressed concrete bridge, the comprehensive evaluation method about the bridge damage conditions are studied. Particular attentions are paid on establishing a muhilevel eval... Considering the construction features of prestressed concrete bridge, the comprehensive evaluation method about the bridge damage conditions are studied. Particular attentions are paid on establishing a muhilevel evaluation model for damaged prestressed concrete bridge, and the evaluation indices of the model as well as the rating standards are defined in the model. A normal relative function about the evaluation indices of each element is developed to calculate the relative degree, and for each element which is no sub-level elements. When evaluating the elements in sub-item level or index level of the model, the weights of elements that are pertained to one element are adopted, taking account of their deterioration degree. At the same time, the dam- age conditions of bridge are characterized by relative degree, element evaluation scale and structural technology mark of bridge, so it agrees with Code for Maintenance of Highway Bridges and Culvers. 展开更多
关键词 prestressed concrete bridge EVALUATION AHP analytic hierarchy process relational degree weight modify
下载PDF
Degradation process assessment of prestressed concrete continuous bridges in life-cycle
17
作者 田浩 李国平 陈艾荣 《Journal of Central South University》 SCIE EI CAS 2012年第5期1411-1418,共8页
To accurately evaluate the degradation process of prestressed concrete continuous bridges exposed to aggressive environments in life-cycle,a finite element-based approach with respect to the lifetime performance asses... To accurately evaluate the degradation process of prestressed concrete continuous bridges exposed to aggressive environments in life-cycle,a finite element-based approach with respect to the lifetime performance assessment of concrete bridges was proposed.The existing assessment methods were firstly introduced and compared.Some essential mechanics problems involved in the degradation process,such as the deterioration of materials properties,the reduction of sectional areas and the variation of overall structural performance caused by the first two problems,were investigated and solved.A computer program named CBDAS(Concrete Bridge Durability Analysis System) was written to perform the above-metioned approach.Finally,the degradation process of a prestressed concrete continuous bridge under chloride penetration was discussed.The results show that the concrete normal stress for serviceability limit state exceeds the threshold value after 60 a,but the various performance indicators at ultimate limit state are consistently in the allowable level during service life.Therefore,in the case of prestressed concrete bridges,the serviceability limit state is more possible to have durability problems in life-cycle;however,the performance indicators at ultimate limit state can satisfy the requirements. 展开更多
关键词 prestressed concrete continuous bridges LIFE-CYCLE degradation process finite element chloride penetration serviceability limit state ultimate limit state
下载PDF
Lifetime Reliability Analysis of Flexural Cracking for Prestressed Concrete Bridge
18
作者 童育强 向天宇 +2 位作者 杜斌 袁新朋 赵人达 《Journal of Southwest Jiaotong University(English Edition)》 2009年第3期207-211,共5页
Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design ... Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design specifications. For deterioration of structural performances, chloride-induced reinforcement corrosion is emphasized. Through integrating first order reliability method (FORM) and time discretized approach, the time-variant reliability is evaluated. For illustrative propose, the reliability of a typical simply supported prestressed concrete beam is exemplified. 展开更多
关键词 Prestressed concrete bridge RELIABILITY Service limit state Flexural cracking
下载PDF
Simulation of Temperature Field in Original Segment of Concrete Box-Girder Bridge
19
作者 徐丰 徐雯 王波 《Journal of Southwest Jiaotong University(English Edition)》 2009年第2期102-108,共7页
Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analys... Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect. 展开更多
关键词 concrete box-girder bridge Original segment Thermal analysis Hydration heat Numerical simulation
下载PDF
Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
20
作者 Janusz Hotowaty Dariusz Jurkowski 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页
The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river... The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints. 展开更多
关键词 Prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework.