期刊文献+
共找到3,903篇文章
< 1 2 196 >
每页显示 20 50 100
Thermal performance of cast-in-place piles with artificial ground freezing in permafrost regions
1
作者 WANG Xinbin CHEN Kun +3 位作者 YU Qihao GUO Lei YOU Yanhui JIN Mingyang 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1307-1328,共22页
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap... During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost. 展开更多
关键词 Permafrost engineering cast-in-place pile Artificial ground freezing Thermal performance.
下载PDF
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
2
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 Free-standing pile group piled raft pileesoileraft interaction Physical modeling cast-in-place concrete piles
下载PDF
Field study of plastic tube cast-in-place concrete pile
3
作者 陈永辉 曹德洪 +2 位作者 王新泉 杜海伟 张霆 《Journal of Central South University》 SCIE EI CAS 2008年第S2期195-202,共8页
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin... The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits. 展开更多
关键词 PLASTIC tube cast-in-place concrete pile SOFT ground improvement pile-supported type reinforced EMBANKMENT CONSTRUCTION equipment CONSTRUCTION workmanship
下载PDF
Bearing Behavior of Cast-in-Place Expansive Concrete Pile in Coral Sand Under Vertical Loading
4
作者 DING Xuan-ming DENG Wei-ting +2 位作者 PENG Yu ZHOU Hang WANG Chun-yan 《China Ocean Engineering》 SCIE EI CSCD 2021年第3期352-360,共9页
The low side friction of piles in coral sand results in the low bearing capacity of foundations.In this paper,expansive concrete pile is utilized to improve the bearing capacity of pile foundations in coral sand.Both ... The low side friction of piles in coral sand results in the low bearing capacity of foundations.In this paper,expansive concrete pile is utilized to improve the bearing capacity of pile foundations in coral sand.Both model tests and numerical simulation are performed to reveal the bearing mechanism of expansive concrete pile in coral sand.Results showed that the lateral earth pressure near pile increases obviously and the side friction of piles is improved,after adding expansion agent to the concrete.The horizontal linear expansion is 1.11%and the bearing capacity increased 41%for the pile,when 25%expansion agent is added.Results in finite element numerical simulation also show that ultimate bearing capacity increases with the increase of the linear expansion ratio.Besides,the area for obvious increase in side friction is below the surface of soil about three times the pile diameter,and the expansion leads to a high side friction sharing of the pile.Therefore,the cast-in-place expansive concrete pile is effective in improving the bearing capacity of piles in coral sand. 展开更多
关键词 bearing behavior expansive concrete pile coral sand side friction numerical simulation
下载PDF
Field observation of the thermal disturbance and freezeback processes of cast-in-place pile foundations in warm permafrost regions
5
作者 Xin Hou Ji Chen +4 位作者 YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang 《Research in Cold and Arid Regions》 CSCD 2023年第1期18-26,共9页
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm... The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site. 展开更多
关键词 PERMAFROST cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
下载PDF
Applications of Ultrasonic Detection Technology in Bridge Concrete Pile Foundation Detection
6
作者 Wei Fu 《Journal of World Architecture》 2023年第6期45-50,共6页
In this paper,the application strategy of ultrasonic detection technology in the detection of concrete foundation piles is analyzed using a construction project as an example.It includes a basic overview of the projec... In this paper,the application strategy of ultrasonic detection technology in the detection of concrete foundation piles is analyzed using a construction project as an example.It includes a basic overview of the project,an overview of ultrasonic testing technology in bridge concrete pile foundation testing,and an analysis of its practical application in the concrete pile foundation testing of this project.The objective of this analysis is to provide some reference for the application of ultrasonic testing technology and the improvement of the quality of bridge concrete pile foundation testing. 展开更多
关键词 Bridge engineering concrete pile foundation Ultrasonic detection technology Ultrasonic detection principle
下载PDF
Influence of the penetration of adjacent X-section cast-in-place concrete(XCC)pile on the existing XCC pile in sand
7
作者 Peng ZHOU Jianhui XU +3 位作者 Changjie XU Guangwei CAO Jie CUP Xuanming DING 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2024年第7期557-572,共16页
A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the v... A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter. 展开更多
关键词 X-section cast-in-place concrete(XCC)pile Test PENETRATION SAND Lateral response Radial stress
原文传递
Design and construction of high and large span cast-in-place reinforced concrete cantilever flowering frame beam
8
作者 WANG Rui ZHEN Liang +2 位作者 WAN Chao WU Jing SHEN Yan-jun 《Journal of Civil Engineering and Architecture》 2009年第5期58-62,共5页
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante... The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order. 展开更多
关键词 cast-in-place reinforced concrete support of cantilever structure high and long span design and construction
下载PDF
Refreezing of cast-in-place piles under various engineering conditions 被引量:9
9
作者 Lei Guo QiHao Yu +2 位作者 XiaoNing Li XinBin Wang YongYu Yue 《Research in Cold and Arid Regions》 CSCD 2015年第4期376-383,共8页
In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafro... In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃. 展开更多
关键词 cast-in-place pile hydration heat REFREEZING engineering factor PERMAFROST
下载PDF
Quantitative analysis of magnetic anomaly of reinforcements in bored in-situ concrete piles 被引量:3
10
作者 Sun Bin Dong Ping Wang Chong Pu Xiaoxuan Wu Yongjing 《Applied Geophysics》 SCIE CSCD 2009年第3期275-286,301,共13页
We quantitatively study magnetic anomalies of reinforcement rods in bored insitu concrete piles for the first time and summarized their magnetic anomaly character. Key factors such as measuring borehole orientation, b... We quantitatively study magnetic anomalies of reinforcement rods in bored insitu concrete piles for the first time and summarized their magnetic anomaly character. Key factors such as measuring borehole orientation, borehole-reinforcement distance, and multiple-section reinforcement rods are discussed which contributes valid and quantitative reference for using the magnetic method to detect reinforcement rods. Through tests with model piles, we confirm the accuracy of theoretical computations and then utilize the law discovered in theoretical computations to explain the characteristics of the actual testing curves. The results show that the Za curves of the reinforcement rod reflect important factors regarding the reinforcement rods, such as rod length, change of reinforcement ratio, length of overlap, and etc. This research perfects the magnetic method for detecting reinforcement rods in bored in-situ concrete piles and the method has great importance for preventing building contractor fraud. 展开更多
关键词 Applied geophysics concrete piles reinforcement rods magnetic method
下载PDF
Deformation and failure modes of composite foundation with sub-embankment plain concrete piles 被引量:2
11
作者 Qian Su JunJie Huang 《Research in Cold and Arid Regions》 CSCD 2013年第5期614-625,共12页
With the development of high-speed railway in China, composite foundation with rigid piles has become a stamdard solution of meeting the high requirements of stability and post-construction settlement of embankment on... With the development of high-speed railway in China, composite foundation with rigid piles has become a stamdard solution of meeting the high requirements of stability and post-construction settlement of embankment on soft subgrade. Among several im- provement pattems, plain concrete piles have been extensively used to treat soft ground supported embankment. To investigate the deformation and failure modes of unimproved soft ground and soft ground reinforced by sub-embankment plain concrete piles, and to learn the influences of track and vehicle load, the effect of pile spacing, as well as the compression moduli of soil layers and upper load condition on the failure modes, a series of centrifuge model tests were performed. Test results indicate that the dis- placement of unimproved soft ground under the embankment increases continuously as embankment, track and train loading, and slip circle failure takes place. The deformation law of soft ground reinforced by sub-embankment plain concrete piles depends on pile spacing, compression modulus of the soft ground, and loading conditions. It was also found that plain concrete piles show displacement and failure patterns depending on its location, compression modulus of soft soil around the pile, and loading condi- tions. Furthermore, the evaluation of improved ground stability as well as the model test procedure is also presented. 展开更多
关键词 centrifuge model test composite foundation plain concrete pile deformation and failure modes EMBANKMENT soft ground
下载PDF
Uplift behavior and load transfer mechanism of prestressed high-strength concrete piles 被引量:1
12
作者 赖颖 金国芳 《Journal of Central South University》 SCIE EI CAS 2010年第1期136-141,共6页
Prestressed high-strength-concrete (PHC) tube-shaped pile is one of the recently used foundations for soft soil. The research on uplift resistance of PHC pile is helpful to the design of pile foundations. A field-scal... Prestressed high-strength-concrete (PHC) tube-shaped pile is one of the recently used foundations for soft soil. The research on uplift resistance of PHC pile is helpful to the design of pile foundations. A field-scale test program was conducted to study the uplift behavior and load transfer mechanism of PHC piles in soft soil. The pullout load tests were divided into two groups with different diameters, and there were three piles in each group. A detailed discussion of the axial load transfer and pile skin resistance distribution was also included. It is found from the tests that the uplift capacity increases with increasing the diameter of pile. When the diameter of piles increases from 500 to 600 mm, the uplift load is increased by 51.2%. According to the load-displacement (Q-S) curves, all the piles do not reach the ultimate state at the maximum load. The experimental results show that the piles still have uplift bearing capacity. 展开更多
关键词 prestresed high-strength concrete piles full-scale test uplift capacity load transfer mechanism
下载PDF
High-frequency interference waves in low strain dynamic testing of X-section concrete piles 被引量:1
13
作者 Qu Liming Fan Yuming +2 位作者 Ding Xuanming Yang Changwei Zhang Yanling 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2021年第4期877-885,共9页
Stress waves propagate along vertical,radial and circumferential directions when a non-uniformly distributed load is applied at one end of a three-dimensional shaft.As a result,the receiving signals are usually mixed ... Stress waves propagate along vertical,radial and circumferential directions when a non-uniformly distributed load is applied at one end of a three-dimensional shaft.As a result,the receiving signals are usually mixed with undesired interference components,often featuring as high-frequency fluctuations.Previous studies have revealed that sectional geometry(shape and size)greatly affects the high-frequency interference.In this study,low strain dynamic testing on full-scale X-section concrete is conducted in order to investigate the influences of high-frequency interference on velocity responses at the pile head.Emphasis is placed on the frequency and peak value of interference waves at various receiving points.Additionally,the effects of the geometrical,and mechanical properties of the pile shaft on high-frequency interference are elaborated on through the three-dimensional finite element method.The results show that the measured wave is obscured by interference waves superposed by two types of high-frequency components.The modulus and cross-sectional area are contributing factors to the frequency and peak value of the interference waves.On the other hand,the position with the least interference is determined,to some extent,by the accurate shape of the X-section. 展开更多
关键词 low strain dynamic testing X-section concrete pile high-frequency interference full-scale model test finite element method
下载PDF
Key technology for construction of connection between steel pylonand concrete pile cap of middle pylon of Taizhou Bridge 被引量:1
14
作者 Sun Yuxiang Zhang Hong +2 位作者 Xiao Wenfu Huang Tao You Xinpeng 《Engineering Sciences》 EI 2012年第3期8-11,共4页
Taizhou Bridge is a suspension bridge with three pylons and two 1 080 m main spans. The middle pylon is a steel frame with longitudinal herringbone shape and lateral gate shape. The connection between steel pylon and ... Taizhou Bridge is a suspension bridge with three pylons and two 1 080 m main spans. The middle pylon is a steel frame with longitudinal herringbone shape and lateral gate shape. The connection between steel pylon and concrete pile cap is a key part to transfer the huge inner force from the pylon to the foundation. Its construction quality is a critical factor to the overall structural loading of the whole bridge ; therefore the contact ratio between the bearing steel plate of pylon and concrete pile cap is required to be over 75 %. The inclined joint surface in two directions, longitudinally at 39/1 920 and laterally at 1/4, posted a challenge to the construction work. A procedure test was carried out to find an optimal construction method by comparison, and finally the post-injection method was selected as it can meet the requirement of concrete strength and contact ratio at the connection. The successful application of the post-injection method in Taizhou Bridge can nrovide an examnle and reference for similar nroiects in the future. 展开更多
关键词 middle pylon CONNECTION steel pylon concrete pile cap contact ratio post-injection method
下载PDF
Viscoelastic behavior of concrete pile
15
作者 丁科 唐小弟 《Journal of Central South University》 SCIE EI CAS 2008年第S1期411-414,共4页
Based on constitutive theory of viscoelasticity,the viscoelastic behaviour of concrete pile was investigated.The influence of viscosity coefficient on the stress,displacement and velocity response was discussed.With t... Based on constitutive theory of viscoelasticity,the viscoelastic behaviour of concrete pile was investigated.The influence of viscosity coefficient on the stress,displacement and velocity response was discussed.With the increase of viscosity coefficient,the amplitude of stress wave decreases,and the maximum value of the stress wave shifts to deeper position of the pile.In other words,the viscosity coefficient behaves as lag effect to stress wave. 展开更多
关键词 concrete pile VISCOELASTICITY stress VISCOSITY COEFFICIENT
下载PDF
Study on Interface mechanical behavior of steel tube reinforced concrete composite pile
16
作者 ZHAO Jiehao 《International English Education Research》 2016年第4期93-94,共2页
Currently for the steel tube reinforced concrete composite pile research, although predecessors make a comprehensive research on the composite pile beating performance, design technology, but there are still many prob... Currently for the steel tube reinforced concrete composite pile research, although predecessors make a comprehensive research on the composite pile beating performance, design technology, but there are still many problems have not been solved, such as the steel tube reinforced concrete pile composite interracial force learn performance research is still in the initial stage. In this paper, we mainly discuss the research methods of several interface mechanical properties and propose the possibility of studying the mechanical properties of the steel tube reinforced concrete composite pile by using the principle of ultrasonic speckle. 展开更多
关键词 Steel tube reinforced concrete composite pile Interface mechanical properties research methods
下载PDF
Application of a concrete thermal pile in cooling the warming permafrost under climate change
17
作者 Yun-Hu SHANG Fu-Jun NIU +2 位作者 Guo-Yu LI Jian-Hong FANG Ze-Yong GAO 《Advances in Climate Change Research》 SCIE CSCD 2024年第1期170-183,共14页
Permafrost degradation caused by climate warming is posing a serious threat to the stability of cast-in-place pile foundations in warm permafrost regions.Ambient cold energy can be effectively utilized by two-phase cl... Permafrost degradation caused by climate warming is posing a serious threat to the stability of cast-in-place pile foundations in warm permafrost regions.Ambient cold energy can be effectively utilized by two-phase closed thermosyphons(TPCTs)to cool the permafrost.Therefore,we installed TPCTs in a cast-in-place pile foundation to create a unique structure called a thermal pile,which effectively utilizes the TPCTs to regulate ground temperature.And we conducted a case study and numerical simulation to exhibit the cooling performance,and optimize the structure of the thermal pile.The purpose of this study is to promote the application of thermal piles in unstable permafrost regions.Based on the findings,the thermal pile operated for approximately 53%of the entire year and effectively reduced the deep ground temperature at a rate of at least-0.1℃per year.Additionally,it successfully raised the permafrost table that is 0.35 m shallower than the natural ground level.These characteristics prove highly beneficial in mitigating the adverse effects of permafrost degradation and enhancing infrastructure safety.Expanding the length of the condenser section and the diameter of the TPCT in a suitable manner can effectively enhance the cooling capability of the thermal pile and ensure the long-term mechanical stability of the pile foundation even under climate warming. 展开更多
关键词 Heat transfer Cold energy Warm permafrost Two-phase closed thermosyphons cast-in-place pile foundation
原文传递
High-Rise Residential Reinforced Concrete Building Optimisation
18
作者 Haibei Xiong Miguel Angel Hidalgo Calvo 《Open Journal of Civil Engineering》 2015年第4期437-450,共14页
In the last few decades structure optimisation has become a main task in a civil engineering project. As a matter of fact, due to the complexity and particularity of every structure, the great amount of variables and ... In the last few decades structure optimisation has become a main task in a civil engineering project. As a matter of fact, due to the complexity and particularity of every structure, the great amount of variables and design criteria to considerate and many other factors, a general optimisation’s method is not simple to formulate. As a result, this paper focuses on how to provide a successful optimisation method for a particular building type, high-rise reinforced concrete buildings. The optimization method is based on decomposition of the main structure into substructures: floor system, vertical load resisting system, lateral load resisting system and foundation system;then each of the subsystems using the design criteria established at the building codes is improved. Due to the effect of the superstructure optimisation on the foundation system, vertical and lateral load resisting system is the last to be considered after the improvement of floor. Finally, as a case example, using the method explained in the paper, a 30-story-high high-rise residential building complex is analysed and optimised, achieving good results in terms of structural behaviour and diminishing the overall cost of the structure. 展开更多
关键词 STRUCTURE Optimisation HIGH-RISE RESIDENTIAL Reinforced concrete Buildings Shear-Wall STRUCTURE Deep pileS Post GROUTING
下载PDF
温度与荷载共同作用下钢筋混凝土桩的细观损伤 被引量:1
19
作者 王多银 陈杰 +4 位作者 陈昊然 段伦良 胡勇 蒋明杰 洪璐 《科学技术与工程》 北大核心 2024年第6期2562-2572,共11页
为探究港口码头不同环境因素对码头桩身材料特性的劣化影响而降低桩身承载能力,通过颗粒流分析程序(particle flow code 3D,PFC3D)建立三维颗粒流离散元钢筋混凝土桩模型开展研究。对温度-应力模型进行建立,选取热学参数,构建了温度热... 为探究港口码头不同环境因素对码头桩身材料特性的劣化影响而降低桩身承载能力,通过颗粒流分析程序(particle flow code 3D,PFC3D)建立三维颗粒流离散元钢筋混凝土桩模型开展研究。对温度-应力模型进行建立,选取热学参数,构建了温度热管模型,通过分级加热,得到了钢筋混凝土桩的横向拉伸应变、纵向压缩应变以及微裂缝生长数量随温度变化曲线;调整模型混凝土粗骨料占比与强度等级,研究其对钢筋混凝土桩受热损伤的影响;通过施加温度场的模型进行水平加荷载后,得到的应力应变曲线;基于模型微裂隙数量的损伤变量,并构建了损伤变量-轴向应变曲线,进一步分析了温度-荷载共同作用的损伤规律。结果表明:混凝土轴向压缩应变和横向拉伸应变会随温度的增加而逐渐升高,细观微裂隙数量会随温度的升高而增长;粗骨料占比升高会使受热初始损伤增加;温度的升高,材料的宏观力学性能出现了不同程度的降低。 展开更多
关键词 钢筋混凝土桩 离散元 PFC3D 水平荷载 热力耦合
下载PDF
湿陷性黄土地基中桩基负摩阻力计算新方法
20
作者 赵敏 曹卫平 《土木与环境工程学报(中英文)》 CSCD 北大核心 2024年第2期1-10,共10页
负摩阻力对湿陷性黄土地基中桩基的承载变形性状具有重要影响,现行桩基规范及黄土规范推荐的负摩阻力计算方法不能反映黄土桩基负摩阻力的实际性状。对近30年来在黄土地区开展的钢筋混凝土灌注桩现场浸水试验实测数据进行统计,分析黄土... 负摩阻力对湿陷性黄土地基中桩基的承载变形性状具有重要影响,现行桩基规范及黄土规范推荐的负摩阻力计算方法不能反映黄土桩基负摩阻力的实际性状。对近30年来在黄土地区开展的钢筋混凝土灌注桩现场浸水试验实测数据进行统计,分析黄土浸水完成后桩身中性点深度、桩身最大负摩阻力深度及负摩阻力系数与桩长径比的关系,通过线性拟合得到了中性点深度比、最大负摩阻力深度比及负摩阻力系数与桩长径比的经验表达式,提出湿陷性黄土地基中桩基负摩阻力计算的新方法。新方法用三角形表示负摩阻力沿深度的分布,能反映负摩阻力从桩顶向下先逐渐增大、达到最大值后随深度增加逐渐减小、最终在中性点处减小为零的分布特征。将提出的方法、桩基规范及黄土规范方法的计算结果与实测结果进行对比,结果表明,桩基规范预测的中性点深度比优于黄土规范,黄土规范预测的最大下拉荷载优于桩基规范,而用新方法计算的负摩阻力最接近实测结果。 展开更多
关键词 湿陷性黄土 钢筋混凝土桩 负摩阻力 计算方法
下载PDF
上一页 1 2 196 下一页 到第
使用帮助 返回顶部