期刊文献+
共找到809篇文章
< 1 2 41 >
每页显示 20 50 100
Dynamic finite element model updating of prestressed concrete continuous box-girder bridge 被引量:6
1
作者 Lin Xiankun Zhang Lingmi +1 位作者 Guo Qintao Zhang Yufeng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2009年第3期399-407,共9页
The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a... The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge . 展开更多
关键词 prestressed concrete continuous box-girder bridge field ambient vibration testing dynamic characteristics model updating accelerating genetic algorithm objective function
下载PDF
Weakening effect of vertical prestress ducts on web sections in prestressed concrete box girder bridges
2
作者 Shen Mingyan Zhong Xingu Yin Xuwen Shu Xiaojuan 《Engineering Sciences》 EI 2010年第2期73-79,共7页
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ... Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges. 展开更多
关键词 concrete box girder bridge vertical prestress duct weakening of web section experimental study finite element analysis
下载PDF
Simulation of Temperature Field in Original Segment of Concrete Box-Girder Bridge
3
作者 徐丰 徐雯 王波 《Journal of Southwest Jiaotong University(English Edition)》 2009年第2期102-108,共7页
Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analys... Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect. 展开更多
关键词 concrete box-girder bridge Original segment Thermal analysis Hydration heat Numerical simulation
下载PDF
Temperature distributions in concrete box girders due to heat of concrete hydration 被引量:1
4
作者 梅竹 贾艳敏 李成玉 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2011年第1期47-51,共5页
Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge ... Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge was measured on site.The two coefficients in the complex exponential function were determined to best fit the field measured data.ABAQUS program was used to simulate the heat transfer and determine the temperature distribution in the concrete box girders during concrete setting.The calculated temperature distribution in the box girders were compared with the field measured data and good agreement was observed.The temperature distribution and gradient in the entire box section,webs and bottom slab were analyzed using the measured and calculated results during the course of concrete hydration. 展开更多
关键词 heat of hydration temperature distribution box girder bridge concrete hydration
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
5
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
Identification of Connection Flexibility Effects Based on Load Testing of a Steel-Concrete Bridge
6
作者 Czeslaw Machelski Robert Toczkiewicz 《Journal of Civil Engineering and Architecture》 2012年第11期1504-1513,共10页
In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, doe... In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position, which can be used for verification of steel-concrete interaction in real bridge structures rather than in specimens is proposed. The range of the index value changes, obtained during load testing of a typical steel-concrete composite beam bridge, is presented. The investigation was carried out on a motorway viaduct, consisting of two parallel structures. During the testing values of strains in girders under static and quasi-static loads were measured. The readings from the gauges were used to determine the index, characterizing composite action of the girders. Results of bridge testing under movable load, changing position along the bridge span is presented and obtained in-situ influence functions of strains and index values are commented in the paper. 展开更多
关键词 Abstract: In the case of composite girders an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs used commonly in bridge structures does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position which can be used for verification of steel-concrete interaction in real bridge structures rather Composite bridge partial interaction
下载PDF
简支变结构连续小箱梁桥负弯矩区UHPC-NC组合桥面板抗裂性研究 被引量:1
7
作者 李俊 《铁道标准设计》 北大核心 2024年第5期75-81,96,共8页
针对当前简支变结构连续小箱梁桥负弯矩区钢束易堵孔、运营中桥面开裂病害等问题,提出一种无负弯矩钢束的UHPC-NC组合桥面板结构。以一座3×30 m简支变结构连续小箱梁桥为研究对象,以正常使用极限状态梁体不开裂为控制准则确定UHPC... 针对当前简支变结构连续小箱梁桥负弯矩区钢束易堵孔、运营中桥面开裂病害等问题,提出一种无负弯矩钢束的UHPC-NC组合桥面板结构。以一座3×30 m简支变结构连续小箱梁桥为研究对象,以正常使用极限状态梁体不开裂为控制准则确定UHPC合理构造尺寸,对所提出的负弯矩组合桥面板结构进行1∶2的缩尺模型试验。试验显示:裂缝首先出现于UHPC-NC交界面处的普通混凝土部分,随后逐渐向UHPC层沿伸,且C50混凝土开裂、梁体破坏对应的截面弯矩分别为3 520,9 152 kN·m(考虑1∶8弯矩缩尺比),大于正常使用极限状态、承载能力极限状态梁体截面弯矩3 300,5 838 kN·m,即该组合桥面板结构满足小箱梁的抗裂与承载能力要求。基于试验结果建立精细化有限元模型,采用参数分析法研究UHPC厚度对梁体开裂荷载、极限承载力等方面的影响。结果表明:梁体开裂弯矩主要由UHPC上覆层厚度决定,相较于普通钢筋混凝土梁,5 cm厚的UHPC上覆层可将梁体开裂弯矩提高28.9%,7.5 cm厚的UHPC上覆层可将梁体开裂弯矩提高41.6%;在配筋率不变的情况下,增大UHPC层厚度对梁体承载力无显著提升。综合考虑梁体受力性能以及施工便利性,建议背景工程UHPC厚度取10 cm。 展开更多
关键词 预应力混凝土桥 箱梁桥 模型试验 负弯矩区 超高性能混凝土 抗裂构造 数值模拟
下载PDF
PC箱梁桥火灾爆炸联合作用下损伤效应研究
8
作者 田力 李孟辉 +1 位作者 王剑飞 朱劲松 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2024年第11期1200-1210,共11页
利用ANSYS/LS-DYNA建立了预应力混凝土(prestressed concrete,PC)箱梁桥三维有限元模型,采用隐式分析方法对PC箱梁桥进行单独火灾分析,得到其在不同时刻下的温度及热应力的分布特征,采用显式分析方法对PC箱梁桥进行单独爆炸分析,得到其... 利用ANSYS/LS-DYNA建立了预应力混凝土(prestressed concrete,PC)箱梁桥三维有限元模型,采用隐式分析方法对PC箱梁桥进行单独火灾分析,得到其在不同时刻下的温度及热应力的分布特征,采用显式分析方法对PC箱梁桥进行单独爆炸分析,得到其在不同爆炸当量下的局部破坏特征以及整体位移情况.随后,对综合考虑高温和高应变率效应的混凝土本构模型和钢材本构模型进行试验验证,在得到可靠性结果的基础上对PC箱梁桥进行火灾爆炸联合作用分析.结果表明:发生桥上火灾时,桥面板的热应力重分布现象应该得到关注,桥上火灾热应力随着燃烧时间的推移,顶板和翼缘板应力下降程度要大于腹板上方混凝土应力下降程度,桥面板的热应力使得在爆炸的过程中会出现小当量炸药也能造成箱梁顶板严重局部损伤的现象.发生小当量爆炸时,若燃烧持续时间较短,材料产生的高热应力起主导作用,从而在后续爆炸过程中对顶板造成严重的局部损伤,但整体位移与常温爆炸相似;若燃烧持续时间较长,材料的高温软化效应起主导作用,顶板损伤情况有所减小,但整体位移会增大.发生大当量爆炸时,无论是材料产生的高热应力还是材料的高温软化均会造成箱梁顶板的严重破损,冲击波在箱梁的聚集作用下冲击底板与腹板交界处,最终底板坍塌.从热应力分布现象和爆炸局部破坏特征来看,单箱多室的箱梁桥可以适当提高抗爆性. 展开更多
关键词 火灾 爆炸 PC箱梁桥 有限元分析
下载PDF
简支波形腹板钢箱组合截面与传统截面箱梁桥抗震性能对比分析
9
作者 赫中营 高嘉 +1 位作者 孙鹏辉 王根会 《工程抗震与加固改造》 北大核心 2024年第1期83-92,82,共11页
为研究波形腹板钢箱-混凝土组合梁桥(CW-SBCCGB)与传统箱梁桥抗震性能的异同,基于截面等效原理,根据某实际工程CW-SBCCGB的单箱截面,等效出波形腹板混凝土箱梁桥(CW-CBGB)和混凝土箱梁桥(CBGB)的单箱截面,再结合动力分析理论和ABAQUS有... 为研究波形腹板钢箱-混凝土组合梁桥(CW-SBCCGB)与传统箱梁桥抗震性能的异同,基于截面等效原理,根据某实际工程CW-SBCCGB的单箱截面,等效出波形腹板混凝土箱梁桥(CW-CBGB)和混凝土箱梁桥(CBGB)的单箱截面,再结合动力分析理论和ABAQUS有限元模型对比分析3种截面简支梁桥动力特性和抗震性能的不同。结果表明:3种截面简支梁桥前五阶振型不变,CW-CBGB和CBGB前三阶频率相比于CW-SBCCGB有所下降,但相差不超过1Hz,第四阶及以后频率差异逐渐变大;剪滞效应对CW-SBCCGB和CW-CBGB动力特性影响较大,对CBGB影响较小;在纵桥向+竖桥向和横桥向+竖桥向地震作用下,CW-SBCCGB和CBGB的墩顶位移和跨中位移均大于CW-CBGB结构,CW-SBCCGB主梁跨中截面剪力最小,CW-CBGB跨中截面弯矩最小,说明CW-SBCCGB和CW-CBGB的抗震性能均优于CBGB的抗震性能。 展开更多
关键词 抗震性能 波形腹板钢箱-混凝土组合梁桥 波形腹板混凝土箱梁桥 混凝土箱梁桥 截面等效
下载PDF
基于BP神经网络的混凝土箱梁最大温度梯度预测 被引量:1
10
作者 王凯 张勇 +3 位作者 刘建磊 何旭辉 蔡陈之 黄石基 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第2期837-850,共14页
混凝土箱梁受到太阳辐射、大气温度波动等多种气象因素的综合作用,结构内部会产生显著的非均匀温度分布。截面内温度梯度可能会导致桥梁结构产生过大的温度应力与温度变形,影响桥梁结构的安全性和耐久性。本文旨在探究气象因素对混凝土... 混凝土箱梁受到太阳辐射、大气温度波动等多种气象因素的综合作用,结构内部会产生显著的非均匀温度分布。截面内温度梯度可能会导致桥梁结构产生过大的温度应力与温度变形,影响桥梁结构的安全性和耐久性。本文旨在探究气象因素对混凝土箱梁温度场的影响机理,并提出一种能精确预测中国多区域混凝土箱梁截面最大温度梯度的方法。首先建立了日照条件下混凝土箱梁温度场计算模型,将2 a以上气象资料作为输入条件,对多个地区混凝土箱梁温度场长期变化进行了仿真模拟,并对混凝土箱梁截面温度梯度的长期变化趋势进行了分析。然后利用主成分分析(PCA)确定了混凝土箱梁截面最大温度梯度预测模型所需的输入参数。最后利用遗传算法优化的BP神经网络建立预测混凝土箱梁竖向、横向温度梯度的网络模型,并与混凝土箱梁截面温度梯度进行比较。结果分析表明BP神经网络模型可以精确地预测混凝土箱梁最大温度梯度,预测值平均绝对误差(AAE)均小于0.9℃,均方根误差(RMSE)均小于1.2℃,决定系数(R^(2))均大于0.9。基于当地气象条件,本文利用经典的BP神经网络模型所建立的预测模型对中国不同地区的混凝土箱梁截面最大温度梯度均能给出准确的预测,为混凝土箱梁设计和施工阶段的最大温度梯度的计算提供一种高效的方法。 展开更多
关键词 桥梁工程 日照温度作用 BP神经网络 混凝土箱梁 温度梯度
下载PDF
赤壁长江公路大桥主桥4号桥塔墩结合梁墩顶节段施工技术 被引量:1
11
作者 付浩 赵前进 《世界桥梁》 北大核心 2024年第1期51-57,共7页
赤壁长江公路大桥主桥为(90+240+720+240+90)m钢-混结合梁斜拉桥,主梁分为121个节段,由双边箱截面钢主梁、横梁、小纵梁等组成,4号桥塔墩墩顶钢梁共3个节段,考虑枯水期施工边跨侧滩地外露,采用浮吊拼装+墩顶拖拉法施工。桥塔墩设置墩旁... 赤壁长江公路大桥主桥为(90+240+720+240+90)m钢-混结合梁斜拉桥,主梁分为121个节段,由双边箱截面钢主梁、横梁、小纵梁等组成,4号桥塔墩墩顶钢梁共3个节段,考虑枯水期施工边跨侧滩地外露,采用浮吊拼装+墩顶拖拉法施工。桥塔墩设置墩旁支架辅助钢梁架设,墩旁支架采用简易支架,设计为分离直立柱结构,避免了传统斜立柱支架体系结构复杂且受限于围堰尺寸的影响;墩旁支架设置钢梁拖拉系统及钢梁姿态调节装置,以实现钢梁的拼装、纵移和姿态调整。墩顶钢梁利用浮吊在中跨侧依次拼装单节段钢梁杆件后向边跨侧分次拖拉,墩顶钢梁全部就位后,采用竖向调节装置通过“顶落梁”工艺精调钢梁高程和横向调节装置对钢梁横向偏位进行纠偏,保证墩顶节段姿态满足设计要求。借助主梁永久结构简化塔区临时约束设计,抵抗风荷载、施工不平衡荷载和不平衡索力造成的钢梁平动和转动,确保主梁悬臂节段施工安全。 展开更多
关键词 斜拉桥 钢-混结合梁 双边箱截面 墩顶节段 墩旁支架 浮吊散拼 墩顶拖拉 施工技术
下载PDF
混凝土小箱梁早龄期开裂风险与防控
12
作者 刘纯 刘江 +1 位作者 吕毅 姜磊 《公路交通科技》 CAS CSCD 北大核心 2024年第9期141-151,共11页
预制混凝土小箱梁在浇注期间水化热作用下产生显著里表温差,存在早龄期开裂风险,影响其安全性及耐久性。为明晰预制混凝土小箱梁早龄期开裂风险,以陕西省安康地区某混凝土小箱梁桥为依托,研究其早龄期温度作用、温度效应及开裂风险,并... 预制混凝土小箱梁在浇注期间水化热作用下产生显著里表温差,存在早龄期开裂风险,影响其安全性及耐久性。为明晰预制混凝土小箱梁早龄期开裂风险,以陕西省安康地区某混凝土小箱梁桥为依托,研究其早龄期温度作用、温度效应及开裂风险,并通过正交试验分析得到了影响预制混凝土小箱梁早龄期开裂风险的主要因素。结果表明:预制混凝土小箱梁在浇注后水化反应迅速,12~16 h后,混凝土温度达到峰值54.9℃,温度最高位置集中于顶部梗腋处及底板,而底板位置受环境作用影响水化放热时间最长,在浇注后72 h内混凝土小箱梁整体温度基本呈对称分布;水化反应期间小箱梁各位置抗力水平增长基本一致,但翼缘、梗腋及腹板中部应力水平较高,开裂风险较大,最大拉应力达到2.71 MPa,最大开裂因子达到1.2;材料属性、结构参数、环境作用对混凝土小箱梁预制期间水化热温度作用均有影响,其中材料属性影响最为显著,主要包括水泥放热量和水泥掺量,调整材料参属性及入模温度可有效降低预制混凝土小箱梁开裂风险。研究结果可以指导预制混凝土小箱梁设计及施工,降低其早龄期开裂风险,提高其安全性及耐久性。 展开更多
关键词 桥梁工程 早龄期开裂风险 热-力耦合分析 预制混凝土小箱梁 水化热温度效应
下载PDF
深中通道泄洪区非通航孔桥主梁设计
13
作者 张卫红 《桥梁建设》 EI CSCD 北大核心 2024年第3期117-122,共6页
深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后... 深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后针对结构形式,提出预应力混凝土梁、钢-混组合梁和钢箱梁3种方案,从力学性能、经济性和施工风险等方面综合考虑,最终推荐采用钢箱梁方案。钢箱梁采用外形简洁流畅的封闭式断面,有利于后期维养;考虑全线景观效果,主梁高度取4 m,高跨比为1/27.5;横隔板间距取2.5 m,采用实腹式横隔板和框架式横肋的组合式设计,使箱室内部通透性更好;钢箱梁采用Q420qD钢和Q345qD钢2种材料。钢箱梁施工采用适合海上长大桥梁的大节段预制+现场拼装的施工方案。 展开更多
关键词 连续梁桥 预应力混凝土梁 钢-混组合梁 钢箱梁 封闭式断面 方案比选 结构设计
下载PDF
曲线钢-混组合箱梁桥车桥耦合振动及支座受力研究 被引量:1
14
作者 孙渤佳 马海龙 +1 位作者 王荣霞 王东升 《地震工程与工程振动》 CSCD 北大核心 2024年第1期137-147,共11页
曲线钢-混组合箱梁桥已经建设较多,在设计中因对其车桥耦合振动认识有限,相关支座反力因弯扭耦合效应引起的变化情况等尚未很好解决。基于ABAQUS有限元软件,利用傅里叶级数描述车辆平、竖曲线运动,实现了曲线梁桥车桥耦合振动的数值分析... 曲线钢-混组合箱梁桥已经建设较多,在设计中因对其车桥耦合振动认识有限,相关支座反力因弯扭耦合效应引起的变化情况等尚未很好解决。基于ABAQUS有限元软件,利用傅里叶级数描述车辆平、竖曲线运动,实现了曲线梁桥车桥耦合振动的数值分析,并基于既有试验和理论成果验证了方法的准确性。以某4跨曲线钢-混组合箱梁桥为例,分析了车辆在内、外侧车道以不同速度行驶及超高条件下对桥梁支座反力的影响。结果表明:当车辆沿着曲线梁桥内侧或外侧车道行驶时,另一侧箱梁的外支座会出现脱空的现象。车速对支座峰值反力的影响较小,但可以通过较低的车速减轻支座脱空。超高对支座反力的影响较小,车辆沿着内侧车道行驶时,缓解了外侧箱梁部分支座脱空;沿着外侧车道行驶时,加重了内侧箱梁支座脱空。 展开更多
关键词 钢-混组合曲线箱梁桥 车桥耦合振动 数值模型 支座脱空
下载PDF
悬臂施工的连续箱梁桥框架墩横梁监控技术的研究
15
作者 老国健 刘方刚 +1 位作者 李新平 赵小龙 《公路工程》 2024年第4期35-41,共7页
大跨径框架墩连续箱梁桥施工过程中可能存在不平衡荷载使框架墩横梁受扭,为了消除框架墩的受扭一般采用配重方式进行施工监控。以广佛肇高速公路上的一座主墩采用墩梁固结的框架墩大跨径连续箱梁桥为工程背景,采用结构力学方法推导出框... 大跨径框架墩连续箱梁桥施工过程中可能存在不平衡荷载使框架墩横梁受扭,为了消除框架墩的受扭一般采用配重方式进行施工监控。以广佛肇高速公路上的一座主墩采用墩梁固结的框架墩大跨径连续箱梁桥为工程背景,采用结构力学方法推导出框架墩横梁端部截面倾斜角随不平衡弯矩变化的理论计算式和框架墩立柱水平变位与不平衡弯矩关系的计算公式,同时给出了与水箱配重相关的计算公式,并提出了对框架墩横梁监控的两种监控方法。理论计算公式通过在实际工程的应用,对比了该桥梁的框架墩横梁施工监控中采用有限元数值分析计算获得的数值拟合公式,两者公式中的常系数基本相等,验证了提出的框架墩横梁受扭监控计算理论公式的正确性。并对采用监测横断端部倾斜角的监控方法与采用监测立柱水平变位的监控方法进行了对比分析。研究成果可为同类工程的施工监控提供帮助。 展开更多
关键词 桥梁工程 预应力混凝土箱梁 框架墩横梁 施工监控
下载PDF
高速公路桥梁工程后张法预应力砼箱梁施工技术研究 被引量:1
16
作者 郭朝华 《江西建材》 2024年第2期203-205,共3页
文中将后张法预应力砼箱梁施工技术应用于高速公路桥梁建设项目中,设置预应力孔道及锚垫板,以便于进一步的箱梁模板安装施工;在箱梁的混凝土强度达到设计强度的90%后,进行箱梁砼钢绞线穿束;确定施工流程,根据工程概况,对箱梁进行静荷载... 文中将后张法预应力砼箱梁施工技术应用于高速公路桥梁建设项目中,设置预应力孔道及锚垫板,以便于进一步的箱梁模板安装施工;在箱梁的混凝土强度达到设计强度的90%后,进行箱梁砼钢绞线穿束;确定施工流程,根据工程概况,对箱梁进行静荷载测试。结果显示,测试点在静荷载下达到的累计沉降量均在10 mm以内,说明箱梁抗压能力较强,施工质量较好,满足设计要求。 展开更多
关键词 桥梁工程 后张法 预应力砼箱梁施工
下载PDF
PC连续箱梁桥的日照温度效应及合龙温度研究
17
作者 贾毅 柳其钱 +2 位作者 李琪 刘勇弘 乔文斗 《工业安全与环保》 2024年第1期13-17,23,共6页
以云南省某大跨径预应力混凝土连续箱梁桥为工程背景,研究其日照温度效应以及合龙温度的确定。使用ANSYS数值模拟混凝土箱梁的温度场,结合实测值验证其可靠性,并拟合相应的指数型温度梯度曲线;使用Midas研究日照温度模式对混凝土箱梁桥... 以云南省某大跨径预应力混凝土连续箱梁桥为工程背景,研究其日照温度效应以及合龙温度的确定。使用ANSYS数值模拟混凝土箱梁的温度场,结合实测值验证其可靠性,并拟合相应的指数型温度梯度曲线;使用Midas研究日照温度模式对混凝土箱梁桥施工中和成桥下的内力和位移影响;基于年温差效应对合理合龙温度进行研究,并针对非设计合龙温度下的合理施工提出相应的改善措施。结果表明,温度场计算理论得出的数据同实测值吻合较好;拟合出指数型的升温和降温模式下的温度效应公式,尤其是对最大悬臂状态的下挠影响显著,最大下挠值达21.6 mm;结构因整体升温或降温产生的横向位移值比竖向位移值大,升温22℃时,最大纵向位移值为-31.2 mm;合龙温度为10℃时,对主梁结构的受力最好,同时升温带来的结构上挠值对结构长期变形有利。 展开更多
关键词 预应力混凝土连续箱梁桥 数值模拟 温度场 温度效应 合龙温度
下载PDF
钢-混凝土组合箱梁桥空间网格计算模型研究
18
作者 卫少阳 邬晓光 《科技通报》 2024年第9期87-92,115,共7页
本文分析了钢-混凝土组合箱梁桥基本计算方法,指出了设计计算中应用单梁模型、梁格模型与实体模型的缺陷,详细介绍了空间网格模型的基本原理,将空间网格模型引入钢-混凝土组合箱梁计算中。为探究空间网格计算模型在钢-混凝土组合箱梁桥... 本文分析了钢-混凝土组合箱梁桥基本计算方法,指出了设计计算中应用单梁模型、梁格模型与实体模型的缺陷,详细介绍了空间网格模型的基本原理,将空间网格模型引入钢-混凝土组合箱梁计算中。为探究空间网格计算模型在钢-混凝土组合箱梁桥中的计算效率和可靠性,以一主跨480 m双塔五跨钢-混凝土组合箱梁桥为例,将主梁按照空间网格模型划分,分析成桥阶段恒载、活载以及设计标准荷载组合作用下主梁边、中跨关键截面的应力。结果表明:空间网格模型可以准确分析组合箱梁截面整体空间效应,无须单独建立局部模型就能考虑到混凝土顶板的剪力滞效应和活载局部效应,计算得出的应力结果直接用于配筋计算,为钢-混凝土组合箱梁桥分析提供新的思路和方向。 展开更多
关键词 钢-混凝土组合箱梁桥 空间网格模型 空间效应 配筋计算
下载PDF
基于UHPC预制结构的BRT站台铺装层快速维修技术 被引量:1
19
作者 王鹏 王敏 +1 位作者 王康宁 伍鹏飞 《城市道桥与防洪》 2024年第3期140-145,M0013,共7页
为有效延长城市快速公交系统(BRT)站台铺装层的使用寿命并提升正交异性钢桥面板的抗疲劳性能,同时满足不中断交通的需求,提出了“正交异性钢桥面板+短剪力钉+预制超高性能混凝土(UHPC)板+TPO(薄层环氧抗滑铺装材料)”的复合桥面结构及... 为有效延长城市快速公交系统(BRT)站台铺装层的使用寿命并提升正交异性钢桥面板的抗疲劳性能,同时满足不中断交通的需求,提出了“正交异性钢桥面板+短剪力钉+预制超高性能混凝土(UHPC)板+TPO(薄层环氧抗滑铺装材料)”的复合桥面结构及装配化施工工艺。以成都二环线高架桥BRT站台为工程背景,设计了BRT站台铺装层快速维修方案,通过有限元分析确定了最优方案,并开展了BRT站台钢桥面维修改造试验段的实施。有限元分析结果表明:10 mm UHPC灌浆料+50 mm预制UHPC板+10 mm TPO为最佳方案,维修方案的剪力钉受力性能、UHPC抗裂性能均满足结构受力需求,且具有较大的安全储备,改造后正交异性钢桥面板常见疲劳敏感细节的疲劳性能显著提升。结合试验段实施提出了涵盖UHPC板预制、原铺装层处理、预制UHPC板安装和磨耗层与沥青接缝施工4个流程的城市BRT站台铺装层维修施工工艺,为同类型公交站台铺装层维护提供了理论和技术支撑。 展开更多
关键词 桥梁工程 钢箱梁桥 超高性能混凝土 预制结构 铺装层改造 施工工艺
下载PDF
既有箱梁移至邻近新建高铁线条件下帮宽桥墩受力分析
20
作者 张晓华 李逢林 +2 位作者 李伟超 李战胜 卢文良 《工程质量》 2024年第9期39-43,共5页
论文以既有箱梁移至邻近新建高铁线条件下的帮宽桥墩为研究对象,介绍了墩身帮宽方法、施工工艺及界面植筋情况,建立了帮宽桥墩有限元模型,对比研究了墩身帮宽前后的受力特性。结果表明:墩身帮宽前后的最大主拉应力分别为 0.17 MPa、1.06... 论文以既有箱梁移至邻近新建高铁线条件下的帮宽桥墩为研究对象,介绍了墩身帮宽方法、施工工艺及界面植筋情况,建立了帮宽桥墩有限元模型,对比研究了墩身帮宽前后的受力特性。结果表明:墩身帮宽前后的最大主拉应力分别为 0.17 MPa、1.06 MPa,均小于 C35 混凝土的轴心抗拉强度标准值 2.20 MPa,墩身受力性能较好;墩高约 2.2~7.7 m 范围内,接缝面法向正应力由帮宽前的受压转变为帮宽后的受拉,但数值较小;墩身帮宽后接缝面的切向剪应力绝对值较墩身帮宽前的小,接缝面受力状态较为理想;墩身处于弹性阶段,工作性能良好。 展开更多
关键词 高速铁路 箱梁 桥墩 帮宽 新老混凝土 植筋 数值模拟
下载PDF
上一页 1 2 41 下一页 到第
使用帮助 返回顶部