The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a...The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge .展开更多
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ...Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.展开更多
Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analys...Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect.展开更多
Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge ...Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge was measured on site.The two coefficients in the complex exponential function were determined to best fit the field measured data.ABAQUS program was used to simulate the heat transfer and determine the temperature distribution in the concrete box girders during concrete setting.The calculated temperature distribution in the box girders were compared with the field measured data and good agreement was observed.The temperature distribution and gradient in the entire box section,webs and bottom slab were analyzed using the measured and calculated results during the course of concrete hydration.展开更多
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper...The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.展开更多
In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, doe...In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position, which can be used for verification of steel-concrete interaction in real bridge structures rather than in specimens is proposed. The range of the index value changes, obtained during load testing of a typical steel-concrete composite beam bridge, is presented. The investigation was carried out on a motorway viaduct, consisting of two parallel structures. During the testing values of strains in girders under static and quasi-static loads were measured. The readings from the gauges were used to determine the index, characterizing composite action of the girders. Results of bridge testing under movable load, changing position along the bridge span is presented and obtained in-situ influence functions of strains and index values are commented in the paper.展开更多
为有效延长城市快速公交系统(BRT)站台铺装层的使用寿命并提升正交异性钢桥面板的抗疲劳性能,同时满足不中断交通的需求,提出了“正交异性钢桥面板+短剪力钉+预制超高性能混凝土(UHPC)板+TPO(薄层环氧抗滑铺装材料)”的复合桥面结构及...为有效延长城市快速公交系统(BRT)站台铺装层的使用寿命并提升正交异性钢桥面板的抗疲劳性能,同时满足不中断交通的需求,提出了“正交异性钢桥面板+短剪力钉+预制超高性能混凝土(UHPC)板+TPO(薄层环氧抗滑铺装材料)”的复合桥面结构及装配化施工工艺。以成都二环线高架桥BRT站台为工程背景,设计了BRT站台铺装层快速维修方案,通过有限元分析确定了最优方案,并开展了BRT站台钢桥面维修改造试验段的实施。有限元分析结果表明:10 mm UHPC灌浆料+50 mm预制UHPC板+10 mm TPO为最佳方案,维修方案的剪力钉受力性能、UHPC抗裂性能均满足结构受力需求,且具有较大的安全储备,改造后正交异性钢桥面板常见疲劳敏感细节的疲劳性能显著提升。结合试验段实施提出了涵盖UHPC板预制、原铺装层处理、预制UHPC板安装和磨耗层与沥青接缝施工4个流程的城市BRT站台铺装层维修施工工艺,为同类型公交站台铺装层维护提供了理论和技术支撑。展开更多
基金National Natural Science Foundation of China Under Grant No.50575101Transportation Science Research Item of Jiangsu Province Under Grant No.06Y20
文摘The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge .
文摘Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.
基金The Soft Science Foundation of Ministry of Construction of China (No.06-k3-14)
文摘Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect.
基金Sponsored by Northeast Forestry University (GRAM09) and Traffic Department of Heilongjiang Province
文摘Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge was measured on site.The two coefficients in the complex exponential function were determined to best fit the field measured data.ABAQUS program was used to simulate the heat transfer and determine the temperature distribution in the concrete box girders during concrete setting.The calculated temperature distribution in the box girders were compared with the field measured data and good agreement was observed.The temperature distribution and gradient in the entire box section,webs and bottom slab were analyzed using the measured and calculated results during the course of concrete hydration.
文摘The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.
文摘In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position, which can be used for verification of steel-concrete interaction in real bridge structures rather than in specimens is proposed. The range of the index value changes, obtained during load testing of a typical steel-concrete composite beam bridge, is presented. The investigation was carried out on a motorway viaduct, consisting of two parallel structures. During the testing values of strains in girders under static and quasi-static loads were measured. The readings from the gauges were used to determine the index, characterizing composite action of the girders. Results of bridge testing under movable load, changing position along the bridge span is presented and obtained in-situ influence functions of strains and index values are commented in the paper.
文摘为有效延长城市快速公交系统(BRT)站台铺装层的使用寿命并提升正交异性钢桥面板的抗疲劳性能,同时满足不中断交通的需求,提出了“正交异性钢桥面板+短剪力钉+预制超高性能混凝土(UHPC)板+TPO(薄层环氧抗滑铺装材料)”的复合桥面结构及装配化施工工艺。以成都二环线高架桥BRT站台为工程背景,设计了BRT站台铺装层快速维修方案,通过有限元分析确定了最优方案,并开展了BRT站台钢桥面维修改造试验段的实施。有限元分析结果表明:10 mm UHPC灌浆料+50 mm预制UHPC板+10 mm TPO为最佳方案,维修方案的剪力钉受力性能、UHPC抗裂性能均满足结构受力需求,且具有较大的安全储备,改造后正交异性钢桥面板常见疲劳敏感细节的疲劳性能显著提升。结合试验段实施提出了涵盖UHPC板预制、原铺装层处理、预制UHPC板安装和磨耗层与沥青接缝施工4个流程的城市BRT站台铺装层维修施工工艺,为同类型公交站台铺装层维护提供了理论和技术支撑。