Refined mathematical model for the breaching of concrete-face sand-gravel dams due to overtopping failure
1
作者 QIU Wen LI Yan-long +2 位作者 WEN Li-feng WANG Jing YIN Qiao-gang 《Journal of Mountain Science》 SCIE CSCD 2023年第3期670-687,共18页
Overtopping is one of the main reasons for the breaching of concrete-face sand-gravel dams(CFSGDs).In this study,a refined mathematical model was established based on the characteristics of the overtopping breaching o... Overtopping is one of the main reasons for the breaching of concrete-face sand-gravel dams(CFSGDs).In this study,a refined mathematical model was established based on the characteristics of the overtopping breaching of CFSGDs.The model characteristics were as follows:(1)Based on the Renormailzation Group(RNG)k-εturbulence theory and volume of fluid(VOF)method,the turbulent characteristics of the dam-break flow were simulated,and the erosion surface of the water and soil was tracked;(2)In consideration of the influence of the change in the sediment content on the dam-break flow,the dam material transport equation,which could reflect the characteristics of particle settlement and entrainment motion,was used to simulate the erosion process of the sand gravels;(3)Based on the bending moment balance method,a failure equation of the concrete face slab under dead weight and water load was established.The proposed model was verified through a case study on the failure of the Gouhou CFSGD.The results showed that the proposed model could well simulate the erosion mode of the special vortex flow of the CFSGD scouring the support body of the concrete face slab inward and reflect the mutual coupling relationship between the dam-break flow,sand gravels,and concrete face slabs.Compared with the measured values,the relative errors of the peak discharge,final breach average width,dam breaching duration,and maximum failure length of the face slab calculated using the proposed model were all less than 12%,thus verifying the rationality of the model.The proposed model was demonstrated to perform better and provide more detailed results than three selected parametric models and three simplified mathematical models.The study results can aid in establishing the risk level and devising early warning strategies for CFSGDs. 展开更多
关键词 concrete-face sand-gravel dam OVERTOPPING dam-break flow Concrete face slab failure Refined mathematical model
下载PDF
Seepage simulation of high concrete-faced rockfill dams based on generalized equivalent continuum model 被引量:6
2
作者 Shou-kai Chen Qi-dong He Ji-gang Cao 《Water Science and Engineering》 EI CAS CSCD 2018年第3期250-257,共8页
This research focused on the three-dimensional(3 D) seepage field simulation of a high concrete-faced rockfill dam(CFRD) under complex hydraulic conditions. A generalized equivalent continuum model of fractured rock m... This research focused on the three-dimensional(3 D) seepage field simulation of a high concrete-faced rockfill dam(CFRD) under complex hydraulic conditions. A generalized equivalent continuum model of fractured rock mass was used for equivalent continuous seepage field analysis based on the improved node virtual flow method. Using a high CFRD as an example, the generalized equivalent continuum range was determined, and a finite element model was established based on the terrain and geological conditions, as well as structural face characteristics of the dam area. The equivalent seepage coefficients of different material zones or positions in the dam foundation were calculated with the Snow model or inverse analysis. Then, the 3 D seepage field in the dam area was calculated under the normal water storage conditions, and the corresponding water head distribution, seepage flow, seepage gradient, and seepage characteristics in the dam area were analyzed. The results show that the generalized equivalent continuum model can effectively simulate overall seepage patterns of the CFRD under complex hydraulic conditions and provide a reference for seepage analysis of similar CFRDs. 展开更多
关键词 concrete-faced ROCKFILL dam(CFRD) GENERALIZED equivalent CONTINUUM model Node virtual flow method Fractured rock mass SEEPAGE field SEEPAGE coefficient
下载PDF
A simplified physically-based breach model for a high concrete-faced rockfill dam:A case study 被引量:5
3
作者 Qi-ming Zhong Sheng-shui Chen Zhao Deng 《Water Science and Engineering》 EI CAS CSCD 2018年第1期46-52,共7页
A simplified physically-based model was developed to simulate the breaching process of the Gouhou concrete-faced rockfill dam (CFRD), which is the only breach case of a high CFRD in the world. Considering the dam he... A simplified physically-based model was developed to simulate the breaching process of the Gouhou concrete-faced rockfill dam (CFRD), which is the only breach case of a high CFRD in the world. Considering the dam height, a hydraulic method was chosen to simulate the initial scour position on the downstream slope, with the steepening of the downstream slope taken into account; a headcut erosion formula was adopted to simulate the backward erosion as well. The moment equilibrium method was utilized to calculate the ultimate length of a concrete slab under its self-weight and water loads. The calculated results of the Gouhou CFRD breach case show that the proposed model provides reasonable peak breach flow, final breach width, and failure time, with relative errors less than 15% as compared with the measured data. Sensitivity studies show that the outputs of the proposed model are more or less sensitive to different parameters. Three typical parametric models were compared with the proposed model, and the comparison demonstrates that the proposed physically-based breach model performs better and provides more detailed results than the parametric models. 展开更多
关键词 concrete-faced rockfill dam Physically-based breach model Parametric breach model Sensitivity analysis Gouhou CFRD
下载PDF
Reservoir water effects on earthquake performance evaluation of Torul Concrete-Faced Rockfill Dam
4
作者 Alemdar BAYRAKTAR Murat Emre KARTAL Hasan Basri BASAGA 《Water Science and Engineering》 EI CAS 2009年第1期43-57,共15页
This study presents earthquake performance analysis of the Torul Concrete-Faced Rockfill (CFR) Dam with two-dimensional dam-soil and dam-soil-reservoir finite element models. The Lagrangian approach was used with fl... This study presents earthquake performance analysis of the Torul Concrete-Faced Rockfill (CFR) Dam with two-dimensional dam-soil and dam-soil-reservoir finite element models. The Lagrangian approach was used with fluid elements to model impounded water. The interface elements were used to simulate the slippage between the concrete face slab and the rockfill. The horizontal component of the 1992 Erzincan earthquake, with a peak ground acceleration of 0.515g, was considered in time-history analysis. The Drucker-Prager model was preferred in nonlinear analysis of the concrete slab, rockfill and foundation soil. The maximum principal stresses and the maximum displacements in two opposite directions were compared by the height of the concrete slab according to linear time-history analysis to reveal the effect of reservoir water. The changes of critical displacements and principal stresses with time are also shown in this paper. According to linear and nonlinear time-history analysis, the effect of the reservoir water on the earthquake performance of the Torul CFR Dam was investigated and the possible damage situation was examined. The results show that the hydrodynamic pressure of reservoir water leads to an increase in the maximum displacements and principal stresses of the dam and reduces the earthquake performance of the dam. Although the linear time-history analysis demonstrates that the earthquake causes a momentous damage to the concrete slab of the Torul CFR Dam, the nonlinear time-history analysis shows that no evident damage occurs in either reservoir case. 展开更多
关键词 earthquake performance evaluation concrete-faced rockfill dam dam-soil-reservoir interaction Drucker-Prager model interface element Lagrangian approach nonlinear time-history analysis
下载PDF
Comparison between the Isotope Tracking Method and Resistivity Tomography of Earth Rock-Fill Dam Seepage Detection
5
作者 Mingjie Zhao Hui Wang +1 位作者 Xiao Sun Yao Zhang 《Engineering(科研)》 2011年第4期389-399,共11页
This paper compares the different inversion results of three different earth rock-fill dam models with the actual leakage passages by performing isotope tracing tests and resistivity tomographic tests. The accuracy of... This paper compares the different inversion results of three different earth rock-fill dam models with the actual leakage passages by performing isotope tracing tests and resistivity tomographic tests. The accuracy of the experimental results is evaluated, and the characteristics of these two methods are analyzed. As a result, some significant references are offered for earth rock-fill dam’s hidden defects detection. The experimental results show that the leakage and the direction of the seepage can be judged by isotope tracing tests, meanwhile, the degree of the leakage can be confirmed through the determination of the horizontal seepage velocity and the vertical seepage velocity, but it is difficult to properly determine the position of leakage passages and the range of leakage. Relatively speaking, the positions of the leakage passages can be accurately and directly displayed through resistivity tomographic tests. The experiment results show that the resistivity tomographic method is much better than isotope tracing method with regard to earth rock-fill dam’s hidden defects detection, and the resistivity tomographic method expresses much more convenience and much higher precision than isotope tracing method. 展开更多
关键词 EARTH rock-fill dam LEAKAGE Diagnosis ISOTOPES TRACING RESISTIVITY Tomography
下载PDF
Application of 3D Electrical Resistivity Tomography for Diagnosing Leakage in Earth Rock-Fill Dam
6
作者 Xin Zhang Mingjie Zhao +2 位作者 Kui Wang Pan Liu Huan Liu 《Engineering(科研)》 2016年第5期269-275,共7页
The leakage occurs during operation of the dam in Liuhuanggou reservoir. It’s a threat to the safety of the people’s lives and property in downstream. In order to eliminate the hidden danger of reservoir, ensure the... The leakage occurs during operation of the dam in Liuhuanggou reservoir. It’s a threat to the safety of the people’s lives and property in downstream. In order to eliminate the hidden danger of reservoir, ensure the safety of the dam, play better the function of flood control and water storage of the reservoir etc., we apply the 3D electrical resistivity tomography detecting technology and volume rendering image processing technology, make the measurement in field, process the data and combine the field survey to find out the leakage channels inside the dam. The results show that the 3D resistivity images appear the low resistivity zone corresponding with the leakage channels. There are two main leakage channels that come from different location inside the dam. It is feasible to diagnose the leakage in earth rock-fill dam by applying 3D electrical resistivity tomography. 展开更多
关键词 Earth rock-fill dam LEAKAGE 3D Electrical Resistivity Tomography Volume Rendering
下载PDF
堆石混凝土坝概述及下一代混凝土坝施工技术展望
7
作者 Feng Jin Duruo Huang +1 位作者 Michel Lino Hu Zhou 《Engineering》 SCIE EI CAS CSCD 2024年第1期99-105,共7页
Over the past few decades,one of the most significant advances in dam construction has been the inven-tion of the rock-filled concrete(RFC)dam,which is constructed by pouring high-performance self-compacting concrete(... Over the past few decades,one of the most significant advances in dam construction has been the inven-tion of the rock-filled concrete(RFC)dam,which is constructed by pouring high-performance self-compacting concrete(HSCC)to fill the voids in preplaced large rocks.The innovative use of large rocks in dam construction provides engineers with a material that requires less cement consumption and hydration heat while enhancing construction efficiency and environmental friendliness.However,two fundamental scientific issues related to RFC need to be addressed:namely,the pouring compactness and the effect of large rocks on the mechanical and physical properties of RFC.This article provides a timely review of fundamental research and innovations in the design,construction,and quality control of RFCdams.Prospects for next-generation concrete dams are discussed from the perspectives of envi-ronmental friendliness,intrinsic safety,and labor savings. 展开更多
关键词 rock-filled concrete dam Pouring compactness Effect of large rocks Intelligent quality control Unmanned dam construction
下载PDF
Prediction of Concrete Faced Rock Fill Dams Settlements Using Genetic Programming Algorithm 被引量:3
8
作者 Seyed Morteza Marandi Seyed Mahmood VaeziNejad Elyas Khavari 《International Journal of Geosciences》 2012年第3期601-609,共9页
In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries a... In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries across the world is gathered with their reported settlements. The results showed that the GP model is able to estimate the dam settlement properly based on four properties, void ratio of dam’s body (e), height (H), vertical deformation modulus (Ev) and shape factor (Sc) of the dam. For verification of the model applicability, obtained results compared with other research methods such as Clements’s formula and the finite element model. The comparison showed that in all cases the GP model led to be more accurate than those of performed in literature. Also a proper compatibility between the GP model and the finite element model was perceived. 展开更多
关键词 CONCRETE FACED rock-fill damS Settlement Genetic Programming ALGORITHM Finite Element Model
下载PDF
Key technical problems of extra-high concrete faced rock-fill dam 被引量:2
9
作者 MA HongQi1? & CAO KeMing2 1Yunnan Huaneng Lancang River Hydropower Co., Ltd., Kunming 650011, China 2East China Investigation, Design & Research Institute, Hangzhou 310014, China 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期20-33,共14页
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete ... This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. 展开更多
关键词 CONCRETE FACED rock-fill dam extra-high dam KEY TECHNOLOGY
原文传递
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
10
作者 Peter TSCHERNUTTER 《Frontiers of Structural and Civil Engineering》 SCIE EI 2011年第1期63-70,共8页
This paper demonstrates the difficulties in determining the relevant material parameters for a valuation of the deformation behavior of the up-and downstream dam shell by means of an embankment dam of medium height.La... This paper demonstrates the difficulties in determining the relevant material parameters for a valuation of the deformation behavior of the up-and downstream dam shell by means of an embankment dam of medium height.Laboratory as well as field tests on solid rock-fill material were performed before the beginning of construction.During the construction the properties of the available rock-fill changed from solid to soft materials.This gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.Several times higher dam settlements as well as significant differential settlements between the up-and downstream dam shell were observed during construction and operation.Apart from this situation,the dam has been operated for nearly 20 years and the behavior of the water barrier has been very good. 展开更多
关键词 embankment dam bituminous concrete membrane rock-fill material properties deformation behavior
原文传递
ON THE CALCULATION OF FLOW OVER AND THROUGH A ROCK-FILL DAM
11
作者 Liu Fa-quan (Xi’an University of Technology, Xi’an 710048, P. R. China ) 《Journal of Hydrodynamics》 SCIE EI CSCD 1999年第1期1-10,共10页
For an overtopped rock-fill dam, the flow field consists of open flow and seepage flow, which have different properties. The overflow is characterized as variable flow and the seepage flow is not the Darcy flow, but n... For an overtopped rock-fill dam, the flow field consists of open flow and seepage flow, which have different properties. The overflow is characterized as variable flow and the seepage flow is not the Darcy flow, but non-Darcy flow. For the analysis of the flow characters, using the energy theory and the FEM, the author presents a method to calculate the combined flow (i. e. flow over and through a dam ) in this paper. The experimental work shows that, the calculated results agree well with the experimental ones.Therefore, it is not only possible, but also feasible to solve this problem with the presented method. 展开更多
关键词 overtopped flow seepage flow rock-fill dam non-Darcy flow
原文传递
Three-dimensional seismic response analysis of a concrete-faced rockfill dam on overburden layers
12
作者 Dakuo FENG Ga ZHANG Jianmin ZHANG 《Frontiers of Structural and Civil Engineering》 SCIE EI 2010年第2期258-266,共9页
Reasonable seismic response analysis of a high rockfill dam is of great engineering significance in guiding its design and ensuring its seismic safety during operation,especially of a concrete-faced rockfill dam(CFRD)... Reasonable seismic response analysis of a high rockfill dam is of great engineering significance in guiding its design and ensuring its seismic safety during operation,especially of a concrete-faced rockfill dam(CFRD)on overburden layers.The three-dimensional seismic behavior of the Miaojiaba CFRD is simulated and analyzed by the finite element method(FEM).The results indicate that:1)the amplification coefficient along the dam axis gradually increases with the altitude,and reaches maximum at the dam crest;2)the vertical residual deformation mainly exhibits downwards and reaches maximum near the dam crest;3)the earthquake significantly aggravates the deformation of peripheral joints;4)the impounding condition and overburden characteristics have great effects on the dam's seismic response. 展开更多
关键词 concrete-faced rockfill dam(CFRD) overburden layer dynamic analysis finite element method(FEM)
原文传递
Investigation of the 5.12 Wenchuan Earthquake damages to the Zipingpu Water Control Project and an assessment of its safety state 被引量:26
13
作者 GUAN ZhiCheng Water Resources and Hydropower Planning & Design General Institute, Beijing100120, China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第4期820-834,共15页
On May 12, 2008, a major earthquake measured 8 on the Richter scale jolted Wenchuan County in Si- chuan Province, China with the epicentral intensity of XI degrees. Zipingpu Dam is located 17.17 km from the epicenter ... On May 12, 2008, a major earthquake measured 8 on the Richter scale jolted Wenchuan County in Si- chuan Province, China with the epicentral intensity of XI degrees. Zipingpu Dam is located 17.17 km from the epicenter and the influence intensity at the damsite reached IX―X degrees. It is the first time in the world for such a high concrete-faced rockfill dam (CFRD) in China to experience such a strong earthquake occurring in such a short distance. Due to its location of special importance to the down- stream areas, the safety state and damaging condition of the Zipingpu Dam has attracted great atten- tions from various circles. Based on site investigation of the damages to the Zipingpu Dam and com- parison analysis of the observation data obtained before and after the earthquake, the paper makes a comprehensive assessment of the key technical issues relevant to this high CFRD, including its safety state and the high slope stability after the earthquake. 展开更多
关键词 EARTHQUAKE EARTHQUAKE damage INVESTIGATION concrete-faced ROCKFILL dam dam project safety state Zipingpu dam
原文传递
Strengthening of the concrete face slabs of dams using sprayable strain-hardening fiber-reinforced cementitious composites
14
作者 Qinghua LI Xing YIN +2 位作者 Botao HUANG Yifeng ZHANG Shilang XU 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第2期145-160,共16页
In this study,sprayable strain-hardening fiber-reinforced cementitious composites(FRCC)were applied to strengthen the concrete slabs in a concrete-face rockfill dam(CFRD)for the first time.Experimental,numerical,and a... In this study,sprayable strain-hardening fiber-reinforced cementitious composites(FRCC)were applied to strengthen the concrete slabs in a concrete-face rockfill dam(CFRD)for the first time.Experimental,numerical,and analytical investigations were carried out to understand the flexural properties of FRCC-layered concrete slabs.It was found that the FRCC layer improved the flexural performance of concrete slabs significantly.The cracking and ultimate loads of a concrete slab with an 80 mm FRCC layer were 132%and 69%higher than those of the unstrengthened concrete slab,respectively.At the maximum crack width of 0.2 mm,the deflection of the 80-mm FRCC strengthened concrete slab was 144%higher than that of the unstrengthened concrete slab.In addition,a FE model and a simplified analytical method were developed for the design and analysis of FRCC-layered concrete slabs.Finally,the test result of FRCC leaching solution indicated that the quality of the water surrounding FRCC satisfied the standard for drinking water.The findings of this study indicate that the sprayable strain-hardening FRCC has a good potential for strengthening hydraulic structures such as CFRDs. 展开更多