In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has bee...In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.展开更多
Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of ...Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed.展开更多
A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate...A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge.展开更多
The creep-induced deformation of the arch rib of concrete-filled steel tubular (CFST) arches under a sustained load can increase the bending moment, which may lead to earlier stability failure called creep buckling....The creep-induced deformation of the arch rib of concrete-filled steel tubular (CFST) arches under a sustained load can increase the bending moment, which may lead to earlier stability failure called creep buckling. To investigate the influences of concrete creep on the buckling strength of arches, a theoretical analysis for the creep buckling of CFST circular arches under distributed radial load is performed. The simplified Arutyunyan-Maslov (AM) creep law is used to model the creep behavior of concrete core, and the creep integral operator is introduced. The analytical solutions of the time-dependent buckling strength under the sustained load are achieved and compared with the existing formula based on the age-adjusted effective modulus method (AEMM). Then the solutions are used to determine the influences of the steel ratio and the first loading age on the creep buckling of CFST arches. The results show that the analytical solutions are of good accuracy and applicability. For CFST arches, the steel ratio and the first loading age have significant influences on creep buckling. An approximate log-linear relationship between the decreased degrees of the creep buckling strength and the first loading age is found. For the commonly used parameters, the maximum loss of the buckling strength induced bv concrete creen is close to 40%展开更多
Expansive concrete is used in the steel tube of Concrete-filled steel tubular(CFST)columns to solve the problem of steel-to-concrete debonding.Self-stress is generated between concrete and steel plate due to concrete ...Expansive concrete is used in the steel tube of Concrete-filled steel tubular(CFST)columns to solve the problem of steel-to-concrete debonding.Self-stress is generated between concrete and steel plate due to concrete expansion,which can effectively improve the mechanical performance of CFST columns.Deformation tests were conducted on concrete and CFST columns,respectively.The free deformation of concrete and circumferential deformation of steel tubes were measured and analyzed.A calculation method was proposed to evaluate the hoop strain,self-stress and creep deformation of the CFST columns.The test and calculation results indicate that the proper addition of expansion agent in the internal concrete can keep concrete expansive and generate self-stresses for a long time.The expansion and self-stresses prevent the debonding between the steel tube and the internal concrete.Increasing the dosage of expansive agents and reducing the curing age both increase the expansive deformation and self-stress of CFST columns.Increasing the tube thickness reduces the expansive deformation and increases the initial self-stress of CFST columns.展开更多
The simplified algorithm for out-of-plane ultimate loadcarrying capacity of concrete-filled steel tubular( CFST) solid-rib arches under uniform vertical load was studied. The experimentally validated finite element mo...The simplified algorithm for out-of-plane ultimate loadcarrying capacity of concrete-filled steel tubular( CFST) solid-rib arches under uniform vertical load was studied. The experimentally validated finite element model was developed. The out-of-plane equivalent length coefficients of solid-rib arches were obtained using out-of-plane elastic eigenvalue buckling analysis. Then the out-ofplane elastic stability coefficient was plotted against the normalized slenderness ratio,and the out-of-plane eigenvalue buckling load or elastic buckling capability of arches was calculated. Lastly effects of different parameters on the out-of-plane ultimate load-carrying capacity of CFST solid-rib arches were determined using geometric and material nonlinear finite element analysis, and a simplified algorithm was established by fitting the out-of-plane elastic-plastic stability coefficient and normalized slenderness ratio using PerryRobertson formula. Ratio of the elastic stability coefficient to the elastic-plastic counterpart was plotted against the out-of-plane normalized slenderness ratio,from which the out-of-plane elasticplastic ultimate load-carrying capacity was determined according to the corresponding elastic buckling load. Results show that the proposed simplified algorithm can accurately predict the out-of-plane eigenvalue buckling load and the elastic-plastic ultimate loadcarrying capacity of the CFST solid-rib arches.展开更多
文摘In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.
基金financially supported by the Guangxi Key Research and Development Plan Program(AB22036007).
文摘Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed.
文摘A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge.
基金Supported by the National Natural Science Foundation of China(No.51378162,No.51178150)the National Key Technology Research and Development Program of the Ministry of Science and Technology of China(No2013BAJ08B01)
文摘The creep-induced deformation of the arch rib of concrete-filled steel tubular (CFST) arches under a sustained load can increase the bending moment, which may lead to earlier stability failure called creep buckling. To investigate the influences of concrete creep on the buckling strength of arches, a theoretical analysis for the creep buckling of CFST circular arches under distributed radial load is performed. The simplified Arutyunyan-Maslov (AM) creep law is used to model the creep behavior of concrete core, and the creep integral operator is introduced. The analytical solutions of the time-dependent buckling strength under the sustained load are achieved and compared with the existing formula based on the age-adjusted effective modulus method (AEMM). Then the solutions are used to determine the influences of the steel ratio and the first loading age on the creep buckling of CFST arches. The results show that the analytical solutions are of good accuracy and applicability. For CFST arches, the steel ratio and the first loading age have significant influences on creep buckling. An approximate log-linear relationship between the decreased degrees of the creep buckling strength and the first loading age is found. For the commonly used parameters, the maximum loss of the buckling strength induced bv concrete creen is close to 40%
基金The National Key R&D Program of China(No.2017YFC0703705)the National Natural Science Foundation of China(No.51778183)Jiangsu Planned Projects for Postdoctoral Research Funds(No.2020Z088).
文摘Expansive concrete is used in the steel tube of Concrete-filled steel tubular(CFST)columns to solve the problem of steel-to-concrete debonding.Self-stress is generated between concrete and steel plate due to concrete expansion,which can effectively improve the mechanical performance of CFST columns.Deformation tests were conducted on concrete and CFST columns,respectively.The free deformation of concrete and circumferential deformation of steel tubes were measured and analyzed.A calculation method was proposed to evaluate the hoop strain,self-stress and creep deformation of the CFST columns.The test and calculation results indicate that the proper addition of expansion agent in the internal concrete can keep concrete expansive and generate self-stresses for a long time.The expansion and self-stresses prevent the debonding between the steel tube and the internal concrete.Increasing the dosage of expansive agents and reducing the curing age both increase the expansive deformation and self-stress of CFST columns.Increasing the tube thickness reduces the expansive deformation and increases the initial self-stress of CFST columns.
基金National Natural Science Foundation of China(No.51178119)
文摘The simplified algorithm for out-of-plane ultimate loadcarrying capacity of concrete-filled steel tubular( CFST) solid-rib arches under uniform vertical load was studied. The experimentally validated finite element model was developed. The out-of-plane equivalent length coefficients of solid-rib arches were obtained using out-of-plane elastic eigenvalue buckling analysis. Then the out-ofplane elastic stability coefficient was plotted against the normalized slenderness ratio,and the out-of-plane eigenvalue buckling load or elastic buckling capability of arches was calculated. Lastly effects of different parameters on the out-of-plane ultimate load-carrying capacity of CFST solid-rib arches were determined using geometric and material nonlinear finite element analysis, and a simplified algorithm was established by fitting the out-of-plane elastic-plastic stability coefficient and normalized slenderness ratio using PerryRobertson formula. Ratio of the elastic stability coefficient to the elastic-plastic counterpart was plotted against the out-of-plane normalized slenderness ratio,from which the out-of-plane elasticplastic ultimate load-carrying capacity was determined according to the corresponding elastic buckling load. Results show that the proposed simplified algorithm can accurately predict the out-of-plane eigenvalue buckling load and the elastic-plastic ultimate loadcarrying capacity of the CFST solid-rib arches.