The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenan...The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenance. With the development of computer technology and sensors, on-line monitoring of high-voltage electric power equipment has developed rapidly. By introducing the main principle of Schering bridge to measure tanδ, the way of on-line monitoring of high-voltage electric power equipment was explained. Difference methods of on-line monitoring of insulation parameters for 35 kV substation were discussed. Finally, the shortcomings as well as its tendency of on-line monitoring were analyzed.展开更多
文摘The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenance. With the development of computer technology and sensors, on-line monitoring of high-voltage electric power equipment has developed rapidly. By introducing the main principle of Schering bridge to measure tanδ, the way of on-line monitoring of high-voltage electric power equipment was explained. Difference methods of on-line monitoring of insulation parameters for 35 kV substation were discussed. Finally, the shortcomings as well as its tendency of on-line monitoring were analyzed.