Through analyzing influence of urban development and construction on ecological water conservancy landscapes,common ecological problems of existing water conservancy landscapes were explored.Causes responsible for the...Through analyzing influence of urban development and construction on ecological water conservancy landscapes,common ecological problems of existing water conservancy landscapes were explored.Causes responsible for these problems were summarized as poor knowledge about ecology,unclear objective of construction,water conservancy projects violating the principle of conserving and restoring ecological conditions,and degraded biodiversity of water environment.It was stressed that ecological construction of water conservancy landscapes should break traditional water conservancy concepts,adopt ecological treatment and build ecological landscapes;geomorphic,hydrological and hydraulic of original river systems should be maintained as much as possible;sewage not discharged to natural water directly;water circulation enhanced to promote self-purification capacity of water;necessary purification measures adopted for rivers and lakes.On the basis of above strategies,construction of ecological water conservancy landscapes in Nanchang City was taken for example to analyze problems in the previous construction and present achievements,then principles to be followed in the future construction and protection of ecological water conservancy landscapes in Nanchang City were proposed.展开更多
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin...For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high展开更多
With economy development,human destruction of eco-environment is deteriorating,which has become a key treatment nationwide.What's more,eco-environment construction is proceeding and multi-eco-environment projects are...With economy development,human destruction of eco-environment is deteriorating,which has become a key treatment nationwide.What's more,eco-environment construction is proceeding and multi-eco-environment projects are developing.Water and soil conservation and eco-environment construction should be a strategic task long-term insisted on,which is a part of agricultural construction.The research analyzed the relationship between water and soil conservation with eco-environment,concluded the process of ecological civilization construction in promoting water and soil conservation,and proposed countermeasures,laying foundation for water and soil conservation and ecological construction.展开更多
The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,th...The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,the temperature during winter remain at lower level,in which environmental factors play the most important role in the construction of water conservancy projects.In particular,low temperature directly affects the strength of concrete and delays its solidification,this highly affects the quality and progress of concrete construction.In order to overcome this barrier,better planning,for reasonable and effective construction techniques and targeted control measures should be adopted to reduce the adverse effects of low temperature to assure a strong and safe architecture.展开更多
Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual pre...Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual precipitation, but is significantly reduced after reservoir construction compared to earlier values. Comparisons of intense, pre- and post-construction rainfall events suggest that the Chebahe and Dalongtan reservoir projects respectively clips the magnitude of the flood peaks and delays runoff delivery.展开更多
基金Supported by Special Scientific and Technological Program of Jiangxi Provincial Department of Science and Technology: " Key Techniques of Flood Disaster and Risk Management in the Fuhe River Basin"(2011BBG70031-3)~~
文摘Through analyzing influence of urban development and construction on ecological water conservancy landscapes,common ecological problems of existing water conservancy landscapes were explored.Causes responsible for these problems were summarized as poor knowledge about ecology,unclear objective of construction,water conservancy projects violating the principle of conserving and restoring ecological conditions,and degraded biodiversity of water environment.It was stressed that ecological construction of water conservancy landscapes should break traditional water conservancy concepts,adopt ecological treatment and build ecological landscapes;geomorphic,hydrological and hydraulic of original river systems should be maintained as much as possible;sewage not discharged to natural water directly;water circulation enhanced to promote self-purification capacity of water;necessary purification measures adopted for rivers and lakes.On the basis of above strategies,construction of ecological water conservancy landscapes in Nanchang City was taken for example to analyze problems in the previous construction and present achievements,then principles to be followed in the future construction and protection of ecological water conservancy landscapes in Nanchang City were proposed.
基金supported by the National Natural Science Foundation of China(Grants No.51179108and50909066)the Key Research Foundation of Nanjing Hydraulic Research Institute(Grant No.Y711007)
文摘For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high
基金Supported by the Planning Subject of‘the Twelfth Five-year-plan’in National Scienceand Technology for the Rural Development in China(2011BAD31B01)~~
文摘With economy development,human destruction of eco-environment is deteriorating,which has become a key treatment nationwide.What's more,eco-environment construction is proceeding and multi-eco-environment projects are developing.Water and soil conservation and eco-environment construction should be a strategic task long-term insisted on,which is a part of agricultural construction.The research analyzed the relationship between water and soil conservation with eco-environment,concluded the process of ecological civilization construction in promoting water and soil conservation,and proposed countermeasures,laying foundation for water and soil conservation and ecological construction.
文摘The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,the temperature during winter remain at lower level,in which environmental factors play the most important role in the construction of water conservancy projects.In particular,low temperature directly affects the strength of concrete and delays its solidification,this highly affects the quality and progress of concrete construction.In order to overcome this barrier,better planning,for reasonable and effective construction techniques and targeted control measures should be adopted to reduce the adverse effects of low temperature to assure a strong and safe architecture.
基金supported by the National Natural Science Foundation of China (No. 31460132)the Scientific Research Project of Hubei Provincial Department of Education (No. Q20122901)
文摘Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual precipitation, but is significantly reduced after reservoir construction compared to earlier values. Comparisons of intense, pre- and post-construction rainfall events suggest that the Chebahe and Dalongtan reservoir projects respectively clips the magnitude of the flood peaks and delays runoff delivery.