Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equ...At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.展开更多
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m...The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.展开更多
As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.B...As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.Based on this,the article focuses on the strategy of equipment installation engineering and civil engineering construction cooperation from different construction stages and hopes to help.展开更多
At present,China’s bridges are mostly made of concrete,which contain a large amount of cement,sand and gravel and other materials,which can easily cause environmental pollution.At the same time,China’s total steel p...At present,China’s bridges are mostly made of concrete,which contain a large amount of cement,sand and gravel and other materials,which can easily cause environmental pollution.At the same time,China’s total steel production continues to rank first in the world.The construction and development of steel bridges have sufficient basic support.At the same time,steel is more environmental-friendly than concrete,with higher strength,lower weight,and can reduce construction waste significantly,so the development of steel bridges has been on the rise.To optimize the application effect of steel structure bridges,it is necessary to analyze the construction management and installation quality control strategies of steel bridges for reference.展开更多
This paper expounds the concept of HVAC construction,specifically analyzes the current situation of HVAC construction in construction engineering,and focuses on the key and difficult points in HVAC construction.In ord...This paper expounds the concept of HVAC construction,specifically analyzes the current situation of HVAC construction in construction engineering,and focuses on the key and difficult points in HVAC construction.In order to provide an effective reference for improving the quality of HVAC construction in the current construction engineering,some suggestions are put forward for improvement of relevant technologies involved in key and difficult points.展开更多
If the indoor drainage pipe is blocked and the drainage is not smooth,sewage and pollutants will enter the room and endanger human health.If the pipeline is blocked as a result,a certain intensity of water pressure ma...If the indoor drainage pipe is blocked and the drainage is not smooth,sewage and pollutants will enter the room and endanger human health.If the pipeline is blocked as a result,a certain intensity of water pressure may be brought,which may cause pipeline leakage.In this article,we will analyze and explain the quality problems that often occur during the construction process due to the blockage of the internal drainage pipe,and propose appropriate methods and solutions to improve the quality of the project.展开更多
A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional constructi...A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional construction which requires compaction of soil, aggregate base, sub-base and asphaltic layers. A Geosynthetic Access Mat (GAM) system can serve as an alternative to other traditional construction techniques to accommodate temporary construction. Due to its rigidity, the mat system can provide substantial vertical resistance to the applied load under a large deflection subject to soil conditions. This paper provides details of GAM specifications, soil conditions, applications, installation procedure, comparison with other soil stabilization methods and Aramco experience for deployments of these mats.展开更多
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The p...In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.展开更多
The average coal consumption of thermal power plants inShandong Provincial Grid was reduced from 449 g(standardcoal)/kWh in 1979 to 389 g(standard coal)/kWh in 1989,as inrecent ten years,the thermal power plants of Sh...The average coal consumption of thermal power plants inShandong Provincial Grid was reduced from 449 g(standardcoal)/kWh in 1979 to 389 g(standard coal)/kWh in 1989,as inrecent ten years,the thermal power plants of Shandong Provinceadopted the method of constructing large scale generating units andimproving the economic performance of old generation units,mean-while the other technical and economical targets also were improvedsignificantly.For instance,the electric energy consumption rate展开更多
建筑信息模型(Building Information Modeling,BIM)技术能够优化工程流程,减少返工和浪费,降低错误率和成本,提升项目的整体性能。同时,BIM技术还促进各方协同合作,提高沟通协调效率,减少信息丢失和误解。介绍BIM技术在厂房机电安装中...建筑信息模型(Building Information Modeling,BIM)技术能够优化工程流程,减少返工和浪费,降低错误率和成本,提升项目的整体性能。同时,BIM技术还促进各方协同合作,提高沟通协调效率,减少信息丢失和误解。介绍BIM技术在厂房机电安装中的应用现状,分析了BIM技术在产业园建设项目厂房机电安装方面的优势和问题,给出了扬州新能源产业园东区建设项目中应用BIM的具体案例和实施建议。展开更多
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.
基金provided through the U.S. Department of the Interior, Bureau of Ocean Energy Management
文摘The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.
文摘As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.Based on this,the article focuses on the strategy of equipment installation engineering and civil engineering construction cooperation from different construction stages and hopes to help.
文摘At present,China’s bridges are mostly made of concrete,which contain a large amount of cement,sand and gravel and other materials,which can easily cause environmental pollution.At the same time,China’s total steel production continues to rank first in the world.The construction and development of steel bridges have sufficient basic support.At the same time,steel is more environmental-friendly than concrete,with higher strength,lower weight,and can reduce construction waste significantly,so the development of steel bridges has been on the rise.To optimize the application effect of steel structure bridges,it is necessary to analyze the construction management and installation quality control strategies of steel bridges for reference.
文摘This paper expounds the concept of HVAC construction,specifically analyzes the current situation of HVAC construction in construction engineering,and focuses on the key and difficult points in HVAC construction.In order to provide an effective reference for improving the quality of HVAC construction in the current construction engineering,some suggestions are put forward for improvement of relevant technologies involved in key and difficult points.
文摘If the indoor drainage pipe is blocked and the drainage is not smooth,sewage and pollutants will enter the room and endanger human health.If the pipeline is blocked as a result,a certain intensity of water pressure may be brought,which may cause pipeline leakage.In this article,we will analyze and explain the quality problems that often occur during the construction process due to the blockage of the internal drainage pipe,and propose appropriate methods and solutions to improve the quality of the project.
文摘A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional construction which requires compaction of soil, aggregate base, sub-base and asphaltic layers. A Geosynthetic Access Mat (GAM) system can serve as an alternative to other traditional construction techniques to accommodate temporary construction. Due to its rigidity, the mat system can provide substantial vertical resistance to the applied load under a large deflection subject to soil conditions. This paper provides details of GAM specifications, soil conditions, applications, installation procedure, comparison with other soil stabilization methods and Aramco experience for deployments of these mats.
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
文摘In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.
文摘The average coal consumption of thermal power plants inShandong Provincial Grid was reduced from 449 g(standardcoal)/kWh in 1979 to 389 g(standard coal)/kWh in 1989,as inrecent ten years,the thermal power plants of Shandong Provinceadopted the method of constructing large scale generating units andimproving the economic performance of old generation units,mean-while the other technical and economical targets also were improvedsignificantly.For instance,the electric energy consumption rate
文摘建筑信息模型(Building Information Modeling,BIM)技术能够优化工程流程,减少返工和浪费,降低错误率和成本,提升项目的整体性能。同时,BIM技术还促进各方协同合作,提高沟通协调效率,减少信息丢失和误解。介绍BIM技术在厂房机电安装中的应用现状,分析了BIM技术在产业园建设项目厂房机电安装方面的优势和问题,给出了扬州新能源产业园东区建设项目中应用BIM的具体案例和实施建议。