期刊文献+
共找到9,530篇文章
< 1 2 250 >
每页显示 20 50 100
A Building Information Modeling-Life Cycle Cost Analysis Integrated Model to Enhance Decisions Related to the Selection of Construction Methods at the Conceptual Design Stage of Buildings
1
作者 Nkechi McNeil-Ayuk Ahmad Jrade 《Open Journal of Civil Engineering》 2024年第3期277-304,共28页
Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to ... Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to perform real-time evaluations to explore various design options. However, when integrated with LCCA, BIM provides a comprehensive economic perspective that helps stakeholders understand the long-term financial implications of design decisions. This study presents a methodology for developing a model that seamlessly integrates BIM and LCCA during the conceptual design stage of buildings. This integration allows for a comprehensive evaluation and analysis of the design process, ensuring that the development aligns with the principles of low carbon emissions by employing modular construction, 3D concrete printing methods, and different building design alternatives. The model considers the initial construction costs in addition to all the long-term operational, maintenance, and salvage values. It combines various tools and data through different modules, including energy analysis, Life Cycle Assessment (LCA), and Life Cycle Cost Analysis (LCCA) to execute a comprehensive assessment of the financial implications of a specific design option throughout the lifecycle of building projects. The development of the said model and its implementation involves the creation of a new plug-in for the BIM tool (i.e., Autodesk Revit) to enhance its functionalities and capabilities in forecasting the life-cycle costs of buildings in addition to generating associated cash flows, creating scenarios, and sensitivity analyses in an automatic manner. This model empowers designers to evaluate and justify their initial investments while designing and selecting potential construction methods for buildings, and enabling stakeholders to make informed decisions by assessing different design alternatives based on long-term financial considerations during the early stages of design. 展开更多
关键词 Life Cycle cost Analysis (LCCA) Building Information Modeling (BIM) cost Decision Modular construction and 3D Concrete Printing
下载PDF
Discussion on Construction Project Cost Budget Settlement Review
2
作者 Hongfeng Liu Yumin Yuan 《Journal of Architectural Research and Development》 2024年第1期43-48,共6页
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c... Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work. 展开更多
关键词 construction project cost Budget settlement Review strategy
下载PDF
Cost Control Strategies in the Pre-Construction Period of Highway Construction
3
作者 Chunbo Chen 《Journal of Architectural Research and Development》 2024年第3期104-109,共6页
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ... Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects. 展开更多
关键词 Highway construction Preliminary management cost control Contract management Investment estimate
下载PDF
Application Analysis of BIM Technology in Construction Engineering Cost Management
4
作者 Rui Ma 《Journal of Electronic Research and Application》 2024年第5期52-57,共6页
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c... With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand. 展开更多
关键词 BIM technology construction engineering cost management
下载PDF
Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine 被引量:2
5
作者 Gwang-Hee Kim Jae-Min Shin +1 位作者 Sangyong Kim Yoonseok Shin 《Journal of Building Construction and Planning Research》 2013年第1期1-7,共7页
Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawin... Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawings, documentation and the like are still incomplete. As such, various techniques have been applied to accurately estimate construction costs at an early stage, when project information is limited. While the various techniques have their pros and cons, there has been little effort made to determine the best technique in terms of cost estimating performance. The objective of this research is to compare the accuracy of three estimating techniques (regression analysis (RA), neural network (NN), and support vector machine techniques (SVM)) by performing estimations of construction costs. By comparing the accuracy of these techniques using historical cost data, it was found that NN model showed more accurate estimation results than the RA and SVM models. Consequently, it is determined that NN model is most suitable for estimating the cost of school building projects. 展开更多
关键词 ESTIMATING construction costS Regression Analysis NEURAL Network Support VECTOR MACHINE
下载PDF
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels 被引量:4
6
作者 A.Mahmoodzadeh S.Zare 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期734-745,共12页
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est... Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding. 展开更多
关键词 Markov process Geological condition Monte-Carlo (MC) simulation construction time and costs Hamro tunnel
下载PDF
Control and Management of Construction Project Cost 被引量:1
7
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 construction project construction stage Project cost Control and management
下载PDF
Strategies for Prioritizing Ecological Construction with Consideration of Agricultural Industry Development in Northern China’s Agro- pastoral Ecotone : A Perspective of Opportunity Cost 被引量:2
8
作者 Liang REN Fang SUN Ding DING 《Asian Agricultural Research》 2021年第9期6-12,19,共8页
In northern China’s agro-pastoral ecotone,there are conflicts between agricultural industry and ecological construction resource competition,and also problems urgently to be solved for economic growth and sustainable... In northern China’s agro-pastoral ecotone,there are conflicts between agricultural industry and ecological construction resource competition,and also problems urgently to be solved for economic growth and sustainable ecological improvement.Taking the development concept of"lucid waters and lush mountains being mountains of gold and silver"as the guiding principle of prioritizing ecological and green development,this paper studied the strategies for prioritizing ecological construction with consideration of economic development of agricultural industry from the perspective of opportunity cost.Through the analysis of opportunity cost,externality,and Pareto optimal theory,and using the calculation method of the unit equivalent factor value of terrestrial ecological service function,this paper calculated the ecological service value of forest,grassland,and farmland.It found that the ecological value of forest and grassland per unit area was greater than the ecological value of agricultural industry.This indicates that the opportunity cost of farmland for ecological construction was less than that of agricultural industry.Based on the theoretical and quantitative analysis,it came up with recommendations for establishing a comprehensive system for prioritizing ecological construction with consideration of agricultural industry development and establishing and improving the incentive mechanism of ecological construction. 展开更多
关键词 Opportunity cost Northern China’s agro-pastoral ecotone Agricultural industry Ecological construction Coordinated development
下载PDF
A Review of Deepwater Pipeline Construction in the U.S. Gulf of Mexico-Contracts, Cost, and Installation Methods
9
作者 Mark J. Kaiser 《Journal of Marine Science and Application》 CSCD 2016年第3期288-306,共19页
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m... The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi. 展开更多
关键词 construction cost contract type empirical statistics installation methods deepwater pipeline review
下载PDF
Leaf Construction Cost and Related Ecophysiological Parameters of Rice Crop and Its Important Weeds
10
作者 Vartika SINGH Hema SINGH 《Rice science》 SCIE 2012年第3期233-240,共8页
To understand the reason for the success of weeds,we investigated the energetic cost of leaf construction,and certain ecophysiological traits of rice and its dominant weeds.On physiological basis among all weeds,Caesu... To understand the reason for the success of weeds,we investigated the energetic cost of leaf construction,and certain ecophysiological traits of rice and its dominant weeds.On physiological basis among all weeds,Caesulia axillaris Roxburgh was found to be the most serious,followed by Echinochloa cruss-galli L.Beauv and Echinochloa colonum L.Link,while Fimbristylis miliaceae L.Vahl and Cyperus iria L.were moderate weeds of the rice fields.C.axillaris had the lowest leaf construction cost (LCC) both on a mass basis (1.15 g/g) and on a unit area basis (22.93 g/m2).Comparatively higher specific leaf area,photosynthetic rate,photosynthetic nitrogen use efficiency,leaf area ratio and leaf area index provided C.axillaris with further competitive advantage.Low LCC suggests that weeds utilize carbon resource more efficiently than the crop and potentially spend the saved energy on other competitive strategies viz.seed production,biomass production and high relative growth rate,which results in low crop yield and increase in weed seed bank. 展开更多
关键词 Caesulia axillaris Echinochloa cruss-galli leaf construction cost photosynthetic rate RICE
下载PDF
Construction Management and Cost Control of Landscaping Projects
11
作者 FENG Yuneng 《Journal of Landscape Research》 2012年第11期11-12,16,共3页
Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping ... Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given. 展开更多
关键词 LANDSCAPING construction MANAGEMENT cost CONTROL
下载PDF
An Exploratory Study into Social Cost Considerations in Ghanaian Construction Industry
12
作者 James Cofie Danku Theophilus Adjei-Kumi +1 位作者 Bernard Kofi Baiden Kofi Agyekum 《Journal of Building Construction and Planning Research》 2020年第1期14-29,共16页
Construction causative nuisances, inconveniences, interferences and disruptions to the routine economic and social life patterns of adjacent or neighboring communities are referred to as social cost. This study explor... Construction causative nuisances, inconveniences, interferences and disruptions to the routine economic and social life patterns of adjacent or neighboring communities are referred to as social cost. This study explores the understanding and level of consideration of social cost by construction professionals in Ghana. Relevant literature sources are reviewed to define, rationalize and classify social cost. The study used the survey approach with a set of questionnaires addressed to construction contractors and professionals to gather the data. It was realized that not much consideration is given to social cost at the tender stage of the construction process. The five factors hindering social cost inclusion in tendering are “difficulty in allocating social costs”, “governmental interferences”, “lack of historical data”, “lack of appreciation of social costs” and “low stakeholder agitation”. The paper advocated for integration of social cost into the tendering process. The study will serve as a foundation to design a social cost assessment system at the pre-contract stage. 展开更多
关键词 SOCIAL cost construction Industry construction PROFESSIONALS COMMUNITY Ghana
下载PDF
Representing the Knowledge of Public Construction Project Cost Estimator by Using Rule-Based Method
13
作者 Abelrahman Osman Elfaki Saleh Alatawi 《Journal of Building Construction and Planning Research》 2015年第4期189-195,共7页
Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimat... Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimate process is mainly based on knowledge of human estimator. The main question concerns what human knowledge determines the success of the construction cost estimation process. To address this question we have applied Delphi technique and the output is eleven factors that are enough to precisely represent construction cost estimator knowledge. Then we have used First Order Logic (FOL) to represent these factors in terms of predicates and rules. These FOL rules could be used for evaluating construction cost estimator knowledge in five classes: fail, pass, acceptable, good, and very good. As a validation process we have done experiments using history data and the results have proved the accuracy of our proposed method. 展开更多
关键词 construction MANAGEMENT construction cost Estimation RULE-BASED System
下载PDF
Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
14
作者 Muhammad Ilyas Jing Li Irfan Ullah 《World Journal of Engineering and Technology》 2020年第1期1-12,共12页
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems... Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days. 展开更多
关键词 cost and TIME Overruns DELAY Factors construction Industry PROJECTS DELAY
下载PDF
Construction economic cost management under the market economy
15
作者 QI Ya-li 《Ecological Economy》 2019年第2期156-160,共5页
Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for ... Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for the daily management of construction enterprise managers. This article focuses on the construction economy under the conditions of market economy cost management, analyses related concepts and existing questions, and proposes targeted recommendations of the problem. 展开更多
关键词 MARKET ECONOMY construction cost cost MANAGEMENT
下载PDF
Analysis of Construction Duration and Cost for Public Sector Civil Engineering Projects in Libya
16
作者 Tgarid Ali Xiaohui Zhong Utpal Dutta 《Journal of Civil Engineering and Architecture》 2018年第12期838-847,共10页
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst... Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice. 展开更多
关键词 PUBLIC PROJECTS CIVIL engineering PROJECTS actual construction DURATION actual construction cost
下载PDF
Implementing Life Cycle Costing in Malaysian Construction Industry: A Review
17
作者 Nor Azizah Mohammed Rum Zainal Abidin Akasah 《Journal of Civil Engineering and Architecture》 2012年第9期1202-1209,共8页
The construction industry is a sector that contributes a lot to the economic growth of Malaysia, as it is developing rapidly similar in fashion to other developing countries around the world. In line with the 9th Mala... The construction industry is a sector that contributes a lot to the economic growth of Malaysia, as it is developing rapidly similar in fashion to other developing countries around the world. In line with the 9th Malaysia Plan, development in Malaysia must meet current and future needs to achieve sustainability in economic development, as well as functioning as a social and environmental responsibility for prosperity without compromising the needs of future generations. To ensure that the government's objective is met, construction industry should implement the LCC (life cycle costing) method in structure and infrastructure projects so as to not cause losses to the industry itself and to the government. Through LCC, factors contributing to, and the associated cost of maintenance works for a building are identified at the design stage to obtain a more accurate projection of the total cost. This paper describes the LCC as a vital element in the construction industry since this method can drive quality improvement by taking into account the comprehensive cost of a project. The main aim of this paper is to aid in understanding the application of the LCC concept for the construction industry, particularly for the maintenance phase. This paper also identifies LCC processes involved in a building construction project and subsequently provides recommendation on appropriate measures to implement LCC in the construction industry in Malaysia. 展开更多
关键词 construction industry life cycle costing operation maintenance.
下载PDF
Avoiding Cost Overruns in Construction Projects in India
18
作者 Abdussalam Shibani Kumar Arumugam 《Management Studies》 2015年第4期192-202,共11页
The main aim of this paper is to identify the major reasons for cost overruns in construction projects in India as well as the critical success factors that are helping to avoid the cost overruns. For this, the existi... The main aim of this paper is to identify the major reasons for cost overruns in construction projects in India as well as the critical success factors that are helping to avoid the cost overruns. For this, the existing literature is reviewed and critical success factors are identified. Based on them, survey questions and interview questions are prepared. The findings supported the proposed hypothesis, i.e., lack of certain critical success factors leads to cost overruns in construction projects in India. They also confirmed the proposed proactive and reactive strategies of some researchers. The effective critical success factors include appropriate planning in the initial stages, skills of contractors and architects, good relationship and regular coordination among client and contractor, and early contribution of contractor with the project. The ideal methods that help to reduce cost overruns include efficient planning, proper management of site and supervision of the project, suitable planning and arrangement of project, proper methods for construction, regular meetings on development of the project, and hiring proficient subcontractors and suppliers. 展开更多
关键词 INDIA construction critical success factors cost overrun
下载PDF
Long Run Relationships, Vertical Integration and International Competition: Can They Contribute to Explaining Regional Construction Cost Differences?
19
作者 Abukar Warsame 《Journal of Civil Engineering and Architecture》 2014年第3期378-387,共10页
The existence of opportunistic behavior by contractors or sub-contractors in the bidding process encouraged by the governance structure of construction companies as well as the kind of relationship that exist between ... The existence of opportunistic behavior by contractors or sub-contractors in the bidding process encouraged by the governance structure of construction companies as well as the kind of relationship that exist between contractors and clients is thought to have some bearing on the rising construction cost observed in some regions of Sweden. Three hypotheses that are intended to test the impact that long run relationship between contractors and developers, vertically integrated firms, and the increase of international competition could have on the construction cost increase levels were tested on a predetermined number of projects from six cities in different regions. The semi-structured survey produces inconclusive results. Long run and collaborative relationship was prevalent in small region though respondents in this region did not draw strong connection between construction cost increase levels and the kind of observed relationship. In Stockholm region, short-term relationship was mostly prevalent. Vertical integration and foreign competition impacts on construction costs were not significant in either region. 展开更多
关键词 construction costs COMPETITION long-term relationship vertical integration.
下载PDF
Discussion on Construction Project Cost Composition and Its Management
20
作者 Yang XIAO 《International Journal of Technology Management》 2013年第7期25-27,共3页
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons... That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed. 展开更多
关键词 construction Project Project cost cost Composition Management Measures
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部