In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects refe...In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects referring to the new editions of FIDIC Conditions of Contract in China in 6 aspects: revisions of the existing model contract forms; finding solutions to the payment delay problem; advocating the Design/Build and EPC turnkey project delivery system; clarifying the roles of supervising engineers and opening up the new regions of their work. This paper also prepares a short form model contract for small projects in China, improving the settlement of construction disputes.展开更多
The objectives of this research were to identify and appraising the common dispute problems in domestic and international funded public works projects. The interview and questionnaire method were used in this research...The objectives of this research were to identify and appraising the common dispute problems in domestic and international funded public works projects. The interview and questionnaire method were used in this research. Randomly distributed questionnaire technique was applied to select samples of 390 various construction practitioners consisting of owners, consultants and main contractors to evaluate the severity of the 43 identified dispute factors. This survey found that contract and specification dispute problem was the highest concern among four main dispute problems for construction practitioners. The insufficient working drawing details factor was ranked as the highest overall severity index. The results of the survey also indicated that both domestic and international funded public projects faced moderately severe dispute level among construction team.展开更多
文摘In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects referring to the new editions of FIDIC Conditions of Contract in China in 6 aspects: revisions of the existing model contract forms; finding solutions to the payment delay problem; advocating the Design/Build and EPC turnkey project delivery system; clarifying the roles of supervising engineers and opening up the new regions of their work. This paper also prepares a short form model contract for small projects in China, improving the settlement of construction disputes.
文摘The objectives of this research were to identify and appraising the common dispute problems in domestic and international funded public works projects. The interview and questionnaire method were used in this research. Randomly distributed questionnaire technique was applied to select samples of 390 various construction practitioners consisting of owners, consultants and main contractors to evaluate the severity of the 43 identified dispute factors. This survey found that contract and specification dispute problem was the highest concern among four main dispute problems for construction practitioners. The insufficient working drawing details factor was ranked as the highest overall severity index. The results of the survey also indicated that both domestic and international funded public projects faced moderately severe dispute level among construction team.