Computer technology has been comprehensively popularized in all walks of life with its continuous development. The construction cost management industry is surely no exception. To improve the application of computer t...Computer technology has been comprehensively popularized in all walks of life with its continuous development. The construction cost management industry is surely no exception. To improve the application of computer technology in construction cost management industry, this thesis would respectively discuss and analyze the importance of computer technology application in construction cost management, status quo of computer technology application in construction cost management, measures of improving computer technology application in construction cost management as well as the development prospect of computer technology application in construction cost management. The author is striving to arouse the attention and exploration of relevant departments as well as practitioners in the same industry.展开更多
Building construction projects generally needs a long period, and there are many fixed factors in the process of building, therefore, the management of the project cost is a little difficult. On the basis that the qua...Building construction projects generally needs a long period, and there are many fixed factors in the process of building, therefore, the management of the project cost is a little difficult. On the basis that the quality of construction is not affected, the effective management of the project cost can effectively control the costs so that the economic and social benefits of the construction unit will be raised, and then continue to promote the development of construction industry in China.展开更多
Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for ...Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for the daily management of construction enterprise managers. This article focuses on the construction economy under the conditions of market economy cost management, analyses related concepts and existing questions, and proposes targeted recommendations of the problem.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,constructio...With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping ...Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.展开更多
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst...Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.展开更多
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons...That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimat...Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimate process is mainly based on knowledge of human estimator. The main question concerns what human knowledge determines the success of the construction cost estimation process. To address this question we have applied Delphi technique and the output is eleven factors that are enough to precisely represent construction cost estimator knowledge. Then we have used First Order Logic (FOL) to represent these factors in terms of predicates and rules. These FOL rules could be used for evaluating construction cost estimator knowledge in five classes: fail, pass, acceptable, good, and very good. As a validation process we have done experiments using history data and the results have proved the accuracy of our proposed method.展开更多
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the c...Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
In this paper,combined with an actual case project,activity-based costing is used to analyze the labor costs,material costs,and the corresponding indirect costs(such as site management fees and taxes)where each cost i...In this paper,combined with an actual case project,activity-based costing is used to analyze the labor costs,material costs,and the corresponding indirect costs(such as site management fees and taxes)where each cost is analyzed in detailed.Through quantitative comparison,it further determines which business activities are the key cost control objects and proposes targeted implementation plans for actual cost management in the future in order to provide new ideas for improving the implementation efficiency in addition to a reasonable cost control of highway engineering projects.At the same time,through analyzing the situation of highways,different maintenance modes are compared to put forward a more perfect rural road maintenance and management mode.展开更多
Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for commun...Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium.展开更多
文摘Computer technology has been comprehensively popularized in all walks of life with its continuous development. The construction cost management industry is surely no exception. To improve the application of computer technology in construction cost management industry, this thesis would respectively discuss and analyze the importance of computer technology application in construction cost management, status quo of computer technology application in construction cost management, measures of improving computer technology application in construction cost management as well as the development prospect of computer technology application in construction cost management. The author is striving to arouse the attention and exploration of relevant departments as well as practitioners in the same industry.
文摘Building construction projects generally needs a long period, and there are many fixed factors in the process of building, therefore, the management of the project cost is a little difficult. On the basis that the quality of construction is not affected, the effective management of the project cost can effectively control the costs so that the economic and social benefits of the construction unit will be raised, and then continue to promote the development of construction industry in China.
文摘Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for the daily management of construction enterprise managers. This article focuses on the construction economy under the conditions of market economy cost management, analyses related concepts and existing questions, and proposes targeted recommendations of the problem.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.
文摘With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.
文摘Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.
文摘That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimate process is mainly based on knowledge of human estimator. The main question concerns what human knowledge determines the success of the construction cost estimation process. To address this question we have applied Delphi technique and the output is eleven factors that are enough to precisely represent construction cost estimator knowledge. Then we have used First Order Logic (FOL) to represent these factors in terms of predicates and rules. These FOL rules could be used for evaluating construction cost estimator knowledge in five classes: fail, pass, acceptable, good, and very good. As a validation process we have done experiments using history data and the results have proved the accuracy of our proposed method.
文摘Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
文摘In this paper,combined with an actual case project,activity-based costing is used to analyze the labor costs,material costs,and the corresponding indirect costs(such as site management fees and taxes)where each cost is analyzed in detailed.Through quantitative comparison,it further determines which business activities are the key cost control objects and proposes targeted implementation plans for actual cost management in the future in order to provide new ideas for improving the implementation efficiency in addition to a reasonable cost control of highway engineering projects.At the same time,through analyzing the situation of highways,different maintenance modes are compared to put forward a more perfect rural road maintenance and management mode.
文摘Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium.