期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Construction of tissue engineered articular cartilage with the technique of centrifuge tube culture
1
《Chinese Journal of Biomedical Engineering(English Edition)》 2001年第3期109-110,共2页
关键词 construction of tissue engineered articular cartilage with the technique of centrifuge tube cultur
下载PDF
Construction engineering management culture shift: Is the lowest tender offer dead? 被引量:2
2
作者 Eric SCHEEPBOUWER Douglas D.GRANSBERG Carla Lopez del PUERTO 《Frontiers of Engineering Management》 2017年第1期49-57,共9页
The procurement of public construction projects must walk a fine line between the corruption of state officials and collusion of contractors. The method of awarding projects to the lowest responsible tenderer was orig... The procurement of public construction projects must walk a fine line between the corruption of state officials and collusion of contractors. The method of awarding projects to the lowest responsible tenderer was originally implemented to guard against corruption of state officials. However, an investigation of the construction industry in the Canadian province of Quebec showed that lowest-tender-offer procurement gave rise to collusion of companies tendering for the contracts. Alternatively, bestvalue procurement has been used for decades, but here problems arise owing to the necessity of subjective judging of measures other than price to compare bids, giving rise to time-and money-consuming protests. The paper proposes a compelling argument that the construction engineering management(CEM) culture should refocus its efforts on enhancing project cost certainty rather than merely searching for means to design a project in a manner that produces the lowest initial cost, and awards the construction to the lowest tender offer that focuses on cost savings during the project development and delivery process. The difference in the two approaches is subtle but extremely important. To make the transition, the engineering management tools must be advanced to the next level.This means that all project control tools for managing cost,schedule, and technical scope must be transformed from working in the deterministic mode to the stochastic mode,thus making the probability of completing the projectwithin or below its official budget the primary decision criterion. To do so, CEMs must accept that there is a benefit in paying more for an alternative that increases cost certainty for the entire project. The authors of this paper hope that it will provide the grist for a more general dialog across all industry sectors where engineering management is practiced. 展开更多
关键词 cost certainty lowest responsible bid best value public procurement construction engineering management culture
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部