Based on the analysis of the common limitations of business processmanagement (BPM) methodologies and the requirements of small and medium sized-enterprises (SMEs),the importance of a 'performance construct' o...Based on the analysis of the common limitations of business processmanagement (BPM) methodologies and the requirements of small and medium sized-enterprises (SMEs),the importance of a 'performance construct' of BPM methodologies is identified, a six-phaseperformance-driven BPM methodology for the production and operation processes of Chinese SMEs isdeveloped. A case study on the process management of a medium-sized enterprise shows a successfulexample of running the methodology.展开更多
The need for the analysis of modern businesses is rapidly increasing as the supporting enterprise systems generate more and more data.This data can be extremely valuable for executing organizations because the data al...The need for the analysis of modern businesses is rapidly increasing as the supporting enterprise systems generate more and more data.This data can be extremely valuable for executing organizations because the data allows constant monitoring,analyzing,and improving the underlying processes,which leads to the reduction of cost and the improvement of the quality.Process mining is a useful technique for analyzing enterprise systems by using an event log that contains behaviours.This research focuses on the process discovery and refinement using real-life event log data collected from a large multinational organization that deals with coatings and paints.By investigating and analyzing their order handling pro-cesses,this study aims at learning a model that gives insight inspection of the processes and performance analysis.Furthermore,the animation is also performed for the better inspection,diagnostics,and compliance-related questions to specify the system.The configuration of the system and the conformance checking for further enhancement is also addressed in this research.To achieve the objectives,this research uses process mining techniques,i.e.process discovery in the form of formal Petri nets models with the help of process maps,and process refinement through conformance checking and enhancement.Initially,the identified executed process is reconstructed by using the process discovery techniques.Following the reconstruction,we perform a deep analysis for the underlying process to ensure the process improvement and redesigning.Finally,some recommendations are made to improve the enterprise management system processes.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
Before the implementation of product data management (PDM) system, person model and enterprise process model (EPM) must be firstly established. For the convenience of project management, all the related users must be ...Before the implementation of product data management (PDM) system, person model and enterprise process model (EPM) must be firstly established. For the convenience of project management, all the related users must be allocated to the “Person User Role Group” net. Based on the person model and the direction of information flow, the EPM is established subsequently. The EPM consists of several release levels, in which the access controls are defined. The EPM procedure shows the blueprint of the workflow process structure. The establishment of person model and EPM in an enterprise has been instanced at the end of this paper.展开更多
As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with l...As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with low profitability,low overall scientific and technological level,insufficient innovation ability and weak application and protection of intellectual property rights.Based on the current situation of construction enterprises,combined with the author's enterprise,this paper considers the problems existing in the intellectual property management of construction enterprises,and puts forward some countermeasures for the intellectual property management.展开更多
This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies va...This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies various factors that cause construction enterprise risks from multiple angles,and uses scientific and effective methods to identify and evaluate risks,as well as determine the risk level.Through the overall risk management response strategies and empirical research of construction enterprises,this paper analyzes the general theory and main avoidance strategies of risk response of construction enterprises,and lays the foundation for follow-up risk management response in the form of cases through the implementation of technical route and innovation points.展开更多
The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coo...The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coordination is also discussed. First, based on the analysis of traditi onal project management, project management and coordination of distributed coop erative product design in the virtual enterprise is put forward. Then, aiming at the characteristics of a distributed concurrent product design process, the inh erent rules and complex interrelations in product development are studied. Accor dingly, the architecture of project management of distributed cooperative produc t design in a virtual enterprise is presented to adapt to distributed concurrent development of complex products. The main advantages of the architecture are al so discussed. Finally, the emphasis is placed on the project management process. Its main functions are set forth, such as project definition, task decompositio n and distribution, resource constraints and dynamic resource scheduling, proces s fusion, task scheduling and monitoring, project plan, cost and quality evaluat ion, etc.展开更多
The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,...The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,using the analytic hierarchy process(AHP)and quantitative research method,it evaluated the cost of the discipline construction members and the functions realized.Finally,it determined the performance value level and came up with the value optimization recommendations.展开更多
With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as pr...With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.展开更多
Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platf...Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.展开更多
The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most cr...The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.展开更多
Knowledge transfer is widely emphasized as a strategic issue for firm competition. A model for intra-firm horizontal knowledge transfer is proposed to model horizontal knowledge transfer to solve some demerits in curr...Knowledge transfer is widely emphasized as a strategic issue for firm competition. A model for intra-firm horizontal knowledge transfer is proposed to model horizontal knowledge transfer to solve some demerits in current knowledge transfer researches. The concept model of intra-firm horizontal knowledge transfer was described and a framework was provided to define the main components of the transfer process. Horizontal knowledge transfer is that knowledge is transferred from the source to the same hierarchical level recipients as the target. Horizontal knowledge transfer constitutes a strategic area of knowledge management research. However, little is known about the circumstances under which one particular mechanism is the most appropriate. To address these issues, some significant conclusions are drawn concerning knowledge transfer mechanisms in a real-world setting.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniquen...Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.展开更多
In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-sp...In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-speed railway(HSR),and in combination with the key points and main challenges in the reinforcement framework construction of Guangzhou-Zhanjiang HSR,the overall technical route for the intelligent manufacturing of reinforcement framework of simply-supported box girders is put forward.The component design of reinforcement framework of simply supported box girder is carried out based on BIM,and the feasibility of the scheme is verified through segment assembly test.The assembly techniques are studied in combination with the mesh design scheme to achieve rapid forming of the reinforcement framework.R&D of automatic processing equipment for components,material transshipment equipment,automatic hoisting equipment and technological equipment for assembly clamping fixture are carried out to realize the overall design of equipment production line.An intelligent control system is developed for the whole-process intelligent construction of reinforcement framework to realize the full life-cycle applications for the workshop production and visual management including intelligent layout and quality traceability.The research results systematically optimize and innovate the assembly and forming technologies of reinforcement framework in the prefabrication beam yard of high-speed railway,realize the component processing,automatic assembly and information technology management,improve the construction quality,efficiency and information technology level of intelligent manufacturing of reinforcement framework of railway prefabricated beam as a whole,and reduce the construction cost of the project.The research has realized a major breakthrough in the construction technology of railway prefabricated box girders,which has the extensive technical and market promotion values.展开更多
文摘Based on the analysis of the common limitations of business processmanagement (BPM) methodologies and the requirements of small and medium sized-enterprises (SMEs),the importance of a 'performance construct' of BPM methodologies is identified, a six-phaseperformance-driven BPM methodology for the production and operation processes of Chinese SMEs isdeveloped. A case study on the process management of a medium-sized enterprise shows a successfulexample of running the methodology.
文摘The need for the analysis of modern businesses is rapidly increasing as the supporting enterprise systems generate more and more data.This data can be extremely valuable for executing organizations because the data allows constant monitoring,analyzing,and improving the underlying processes,which leads to the reduction of cost and the improvement of the quality.Process mining is a useful technique for analyzing enterprise systems by using an event log that contains behaviours.This research focuses on the process discovery and refinement using real-life event log data collected from a large multinational organization that deals with coatings and paints.By investigating and analyzing their order handling pro-cesses,this study aims at learning a model that gives insight inspection of the processes and performance analysis.Furthermore,the animation is also performed for the better inspection,diagnostics,and compliance-related questions to specify the system.The configuration of the system and the conformance checking for further enhancement is also addressed in this research.To achieve the objectives,this research uses process mining techniques,i.e.process discovery in the form of formal Petri nets models with the help of process maps,and process refinement through conformance checking and enhancement.Initially,the identified executed process is reconstructed by using the process discovery techniques.Following the reconstruction,we perform a deep analysis for the underlying process to ensure the process improvement and redesigning.Finally,some recommendations are made to improve the enterprise management system processes.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘Before the implementation of product data management (PDM) system, person model and enterprise process model (EPM) must be firstly established. For the convenience of project management, all the related users must be allocated to the “Person User Role Group” net. Based on the person model and the direction of information flow, the EPM is established subsequently. The EPM consists of several release levels, in which the access controls are defined. The EPM procedure shows the blueprint of the workflow process structure. The establishment of person model and EPM in an enterprise has been instanced at the end of this paper.
文摘As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with low profitability,low overall scientific and technological level,insufficient innovation ability and weak application and protection of intellectual property rights.Based on the current situation of construction enterprises,combined with the author's enterprise,this paper considers the problems existing in the intellectual property management of construction enterprises,and puts forward some countermeasures for the intellectual property management.
文摘This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies various factors that cause construction enterprise risks from multiple angles,and uses scientific and effective methods to identify and evaluate risks,as well as determine the risk level.Through the overall risk management response strategies and empirical research of construction enterprises,this paper analyzes the general theory and main avoidance strategies of risk response of construction enterprises,and lays the foundation for follow-up risk management response in the form of cases through the implementation of technical route and innovation points.
文摘The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coordination is also discussed. First, based on the analysis of traditi onal project management, project management and coordination of distributed coop erative product design in the virtual enterprise is put forward. Then, aiming at the characteristics of a distributed concurrent product design process, the inh erent rules and complex interrelations in product development are studied. Accor dingly, the architecture of project management of distributed cooperative produc t design in a virtual enterprise is presented to adapt to distributed concurrent development of complex products. The main advantages of the architecture are al so discussed. Finally, the emphasis is placed on the project management process. Its main functions are set forth, such as project definition, task decompositio n and distribution, resource constraints and dynamic resource scheduling, proces s fusion, task scheduling and monitoring, project plan, cost and quality evaluat ion, etc.
基金Project of the 13th Five-Year Plan for Education and Science of Tianjin"Study on Dynamic Monitoring Mechanism of Discipline Construction Performance in Colleges and Universities"(HE3078).
文摘The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,using the analytic hierarchy process(AHP)and quantitative research method,it evaluated the cost of the discipline construction members and the functions realized.Finally,it determined the performance value level and came up with the value optimization recommendations.
文摘With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.
基金funded by Ministry of Industry and Information Technology of the People’s Republic of China[Grant No.2018473].
文摘Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.
文摘The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.
文摘Knowledge transfer is widely emphasized as a strategic issue for firm competition. A model for intra-firm horizontal knowledge transfer is proposed to model horizontal knowledge transfer to solve some demerits in current knowledge transfer researches. The concept model of intra-firm horizontal knowledge transfer was described and a framework was provided to define the main components of the transfer process. Horizontal knowledge transfer is that knowledge is transferred from the source to the same hierarchical level recipients as the target. Horizontal knowledge transfer constitutes a strategic area of knowledge management research. However, little is known about the circumstances under which one particular mechanism is the most appropriate. To address these issues, some significant conclusions are drawn concerning knowledge transfer mechanisms in a real-world setting.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
文摘Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.
文摘In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-speed railway(HSR),and in combination with the key points and main challenges in the reinforcement framework construction of Guangzhou-Zhanjiang HSR,the overall technical route for the intelligent manufacturing of reinforcement framework of simply-supported box girders is put forward.The component design of reinforcement framework of simply supported box girder is carried out based on BIM,and the feasibility of the scheme is verified through segment assembly test.The assembly techniques are studied in combination with the mesh design scheme to achieve rapid forming of the reinforcement framework.R&D of automatic processing equipment for components,material transshipment equipment,automatic hoisting equipment and technological equipment for assembly clamping fixture are carried out to realize the overall design of equipment production line.An intelligent control system is developed for the whole-process intelligent construction of reinforcement framework to realize the full life-cycle applications for the workshop production and visual management including intelligent layout and quality traceability.The research results systematically optimize and innovate the assembly and forming technologies of reinforcement framework in the prefabrication beam yard of high-speed railway,realize the component processing,automatic assembly and information technology management,improve the construction quality,efficiency and information technology level of intelligent manufacturing of reinforcement framework of railway prefabricated beam as a whole,and reduce the construction cost of the project.The research has realized a major breakthrough in the construction technology of railway prefabricated box girders,which has the extensive technical and market promotion values.