期刊文献+
共找到4,360篇文章
< 1 2 218 >
每页显示 20 50 100
Application Analysis of BIM Technology in Construction Engineering Cost Management
1
作者 Rui Ma 《Journal of Electronic Research and Application》 2024年第5期52-57,共6页
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c... With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand. 展开更多
关键词 BIM technology construction engineering cost management
下载PDF
Cost Management Strategy of Highway Engineering Construction Stage Using the List Pricing Model
2
作者 Zhenghong Peng 《Journal of World Architecture》 2022年第5期47-52,共6页
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta... Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage. 展开更多
关键词 List pricing model Highway engineering construction stage cost management
下载PDF
Analysis of Construction Duration and Cost for Public Sector Civil Engineering Projects in Libya
3
作者 Tgarid Ali Xiaohui Zhong Utpal Dutta 《Journal of Civil Engineering and Architecture》 2018年第12期838-847,共10页
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst... Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice. 展开更多
关键词 PUBLIC projects CIVIL engineering projects actual construction DURATION actual construction cost
下载PDF
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
4
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
Application of Earned Value Method in Project Cost Management and Schedule Management
5
作者 Wenjing Xu 《Proceedings of Business and Economic Studies》 2021年第4期146-152,共7页
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role... At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability. 展开更多
关键词 Earned value method engineering project cost management
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
6
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 construction safety Mechanical and electrical installation Installation engineering engineering projects Safety management
下载PDF
Research on Intelligent Cost Estimation of Engineering Foundation Projects Based on CSIs Theory
7
作者 Jie Di Wenhao Xing +2 位作者 Meng Wu Dan Zhang Jiashuo Zhao 《Journal of World Architecture》 2024年第5期29-35,共7页
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio... Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases. 展开更多
关键词 Project management cost Significant Items(CSIs) engineering costing Intelligent estimation
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
8
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Control and Management of Construction Project Cost 被引量:1
9
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 construction project construction stage Project cost Control and management
下载PDF
Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
10
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 THREE-DIMENSIONAL VISUALIZATION VIRTUAL REALITY engineering construction PROJECT management
下载PDF
Discussion on Construction Project Cost Composition and Its Management
11
作者 Yang XIAO 《International Journal of Technology Management》 2013年第7期25-27,共3页
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons... That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed. 展开更多
关键词 construction Project Project cost cost Composition management Measures
下载PDF
Cost Control research in Construction Project Management
12
作者 Danjing wang 《International Journal of Technology Management》 2013年第4期98-100,共3页
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face... Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional. 展开更多
关键词 cost Control construction Project management Quality Control.
下载PDF
Research on Contract Management and Control in the Process of Project Cost
13
作者 Lingtao BIAN 《International Journal of Technology Management》 2015年第5期44-46,共3页
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ... In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract. 展开更多
关键词 construction project cost management Contract management Problems and countermeasures
下载PDF
Thinking substation construction project management methods
14
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
The Innovation and Practice in Jakarta-Bandung High Speed Railway Construction
15
作者 WANG Tongjun Deputy General Manager ZHANG Yiran(Translated) 《Chinese Railways》 2024年第1期3-12,共10页
As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely ... As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely implementing China's high speed railway technology with all systems,elements and industrial chain.It marks the success of extensive consultation,joint contribution and shared benefits between China and region states to achieve modernization.By studying the Jakarta-Bandung HSR project,this paper concludes the innovations and successful practices in“going global”of China's railway industry in terms of project organization,engineering construction,railway equipment,operation management,risk prevention and control,etc.Meanwhile,focusing on one of the eight major steps to support high-quality Belt and Road cooperation proposed by President Xi Jinping—building a multidimensional“the Belt and Road”connectivity network,this paper puts forward the specific outlook for China's high speed railway to“go global”and jointly build“the Belt and Road”Initiative from two perspectives of international railway engineering and international scientific and technological cooperation. 展开更多
关键词 Jakarta-Bandung HSR “the Belt and Road”Initiative railway“going global” project organization engineering construction railway equipment operation management risk prevention and control
下载PDF
海洋石油工程项目建设成本管理思路 被引量:1
16
作者 单晓亮 《化工管理》 2024年第16期12-14,共3页
海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建... 海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建设风险。文章结合海洋石油工程项目管理中加强成本管理的价值意义分析出发,对当前成本管理工作开展中的现状及实施路径进行了综合探究,着重从成本管理构架、成本预算管理、成本控制要点、成本核算分析、成本考核等方面阐述,以期提升中国海上工程项目建设国际市场竞争力。 展开更多
关键词 海洋石油 工程项目 施工成本 成本控制 预算管理
下载PDF
工程造价超预算的原因分析和控制方法研究
17
作者 胡立群 唐克静 +2 位作者 周文瑞 汤飞 江柳清 《湖北工业职业技术学院学报》 2024年第3期76-79,共4页
在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进... 在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进度失去控制、项目成本管理缺乏力度三个主要原因,提出了相应的控制方法,应严审施工组织设计以减少施工变更、严控工程施工进度以降低延期消耗、强化预算控制意识以提升投入效能。 展开更多
关键词 工程造价 超预算 控制方法 项目管理
下载PDF
项目成本控制下饲料厂房建设期工程造价动态管理研究
18
作者 孙志丽 《中国饲料》 北大核心 2024年第6期101-104,共4页
饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影... 饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影响因素的基础上,分析工程造价动态管理应用于饲料厂房建设时存在的问题并提出相应对策,以期提升建设期工程造价动态管理的效果。 展开更多
关键词 饲料厂房 动态管理 项目成本 工程造价
下载PDF
智能建管平台下工程总承包项目信息共享激励研究
19
作者 丁继勇 孙梦 《科技管理研究》 CSSCI 2024年第6期166-176,共11页
信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进... 信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进行有效的数字化管控的智能建管平台的应用可以有效改善EPC项目中信息不对称现象。但是工程实践中存在总承包商信息共享积极性不高的问题。针对这一问题,以业主方主导构建的智能建管平台为特定情境,运用演化博弈理论构建业主方和总承包商之间的博弈模型,分析双方在信息共享激励过程中的策略选择并进行仿真研究,以探讨不同参数对总承包商信息共享行为的影响,以及影响双方策略选择的关键因素。结果发现:业主方的额外收益越大、激励成本越低,其更倾向于采取激励策略;总承包商积极信息共享的潜在收益越大、消极信息共享的机会收益越小,其更倾向于采取积极信息共享策略;总承包商的智能建管平台应用成熟度和对总承包商的补贴对双方的策略都有显著影响。基于此,提出业主方应从物质激励和声誉激励相结合、基于智能建管平台应用的不同时期及时调整激励策略和辅以适当惩罚机制3个维度来制定激励策略,以促进总承包商积极共享信息。 展开更多
关键词 智能建管平台 工程总承包项目 信息共享 演化博弈 工程项目管理
下载PDF
基于区块链的建筑工程项目供应链管理优化研究
20
作者 赵庆华 戚诺 孙斌 《工程管理学报》 2024年第5期100-104,共5页
针对建筑工程项目供应链管理中存在的物流问题,如信息不对称、协同不足及物资品质控制困难等,提出了一种基于区块链技术的管理优化平台。通过利用区块链的去中心化、不可篡改和高度透明特性,构建了一个信息共享与智能合约自动执行的供... 针对建筑工程项目供应链管理中存在的物流问题,如信息不对称、协同不足及物资品质控制困难等,提出了一种基于区块链技术的管理优化平台。通过利用区块链的去中心化、不可篡改和高度透明特性,构建了一个信息共享与智能合约自动执行的供应链管理模型。该模型能够有效提升供应链各参与方之间的信息共享效率,优化物流调度及物资管理流程,从而改善资料传递和库存控制的及时性。结果表明,该区块链平台在促进建筑工程项目供应链的高效运作、增强透明度和确保物资品质方面具有明显的优势,为改善我国建筑行业的供应链管理提供了理论和实践参考。 展开更多
关键词 区块链技术 建筑工程项目 供应链管理
下载PDF
上一页 1 2 218 下一页 到第
使用帮助 返回顶部