This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction...This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction industry in Ghana. The research methodology employed in this study was a quantitative technique. Questionnaires were distributed to 641 participants within construction industry in Ghana. Questionnaires retrieved for the analysis were 536. Three steps approached were used for the data analysis. These include Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA), and Structural Equation Modeling (SEM) analysis. After conducting the EFA and CFA, SEM was also used to analyze the construct validity. The SEM analysis helps to determine four key indicator variables for the leadership and top management construct. These include Leadership/Top Management approach to employees’ management, Leadership/Top Management understanding of TQM, Leadership/Top Management empowerment of employees to resolve quality issues, and Leadership/Top Management endorsement of TQM. All the four indicator variables were found to be good of fit and closely associated with the dependent variable. The study adds to the body of knowledge by using EFA, CFA and SEM techniques to establish key leadership and top management factors affecting TQM implementation in Ghana’s construction industry. The findings in general suggested that leadership and top Management factors identified have a direct positive impact on sustaining TQM implementation in the Ghanaian construction industry. Consequently, the leadership and top management factors identified in this study can help improve TQM in the Ghanaian construction industry.展开更多
In the field of the construction industry, logistics management has become an issue of concern which needs to be focused on in order to ensure effective, successful and timely execution of projects in the construction...In the field of the construction industry, logistics management has become an issue of concern which needs to be focused on in order to ensure effective, successful and timely execution of projects in the construction industry. Logistics management in construction is a multidisciplinary process which makes sure things are done at the right time, cost and quality as well as material supply and handling, schedule control, site infrastructure and equipment location, site physical flow management, traffic arrangements on and around the construction site, and information management related to all physical and services flow. This paper seeks to identify and evaluate the possible factors that affect logistics management in the construction industry and also to ascertain the current practices of inventory management and the effect on logistics management envisage by construction personnel’s and stake holders. A descriptive survey research was conducted with both structured and unstructured questionnaire and administered both via e-mail and by sending questionnaire link onto a WhatsApp platform groups of the respondents, and out of the 187 respondents that took part in the survey, 22 respondents feedback were incomplete so 165 member respondents results were analyzed representing 88.2% response rate. The survey results were analyzed, displayed and interpreted in the form of tables, bar charts, column chart and pie chart with the use of SPSS software. The research survey respondents </span><span style="font-family:Verdana;">were </span><span style="font-family:Verdana;">comprised of Project Managers, Project Coordinators, Foremen, Site Managers/</span><span style="font-family:Verdana;"> </span><span style="font-family:Verdana;">Officers, Logistics Managers, Inventory Managers and Laborers. The survey results revealed that majority of the total respondents are in the capacity or position as Logistics Managers and also have from 5 to 10 years working experience, and as well majority of the respondents have also attained Master’s degree qualification. It was also revealed that logistics management is greatly affected by the inability or the failure to embrace, adopt and integrate new and emerging technology and its approach into the logistics management system. Majority of the respondents also indicated that in general the adequacy of inventory management system was dissatisfied representing 63.8% of the total respondents. The construction industry not only needed to improve its inventory management systems but also to ensure appropriate inventory management techniques for enhancing high degree of accuracy, reduced cycle times and replenishment of stock. This usually accounts for the poor delivery and quality of work, accompanied with delays and other associated losses in project construction. For effective Logistics management to be achieved in the construction industry, the introduction of modern technology to carry out logistics functions in the construction industry should be paramount to the industry players.展开更多
Accounts receivables are amounts that customers owe on account, which resulting from sale goods and services. Compames generally expect to collect accounts receivable within 30 to 60 days. Sales and profits can be inc...Accounts receivables are amounts that customers owe on account, which resulting from sale goods and services. Compames generally expect to collect accounts receivable within 30 to 60 days. Sales and profits can be increased by granting customers the privileges of making payment a month or more after the date of sale. The accounts receivable play significant important role in company' s flow of funds, lots of companies was bankrupted and going bankrupt because capital turnover is so bad in reality, so that how to strength the management of the accounts receivable becomes the key in the process of making the industry survive and develop. Especially the construction industry, it will produce a large amount of the accounts receivable because of the it ' s own character of whole industry. This text will to come up with the corresponding countermeasure by analyzing accounts receivable management situation and the influence to companies and forming causes.展开更多
Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the cont...Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the contractual roles to settle the claims comfortably, this paper devote the research and literate review to find the key problems in contract claim management and give recommendation accordingly. With this focused objective, this paper presents a research analysis based on randomly selected data from international construction organization. The contract claim case studies analyzed by sampling survey scientific research method that follows a research strategy of specific to general. In the beginning, the paper analyzes the elements of contract claim administration,and then provides the general overview of the contract claim. Finally, it numerates the claim causes usage through cases studies under different contract condition of FIDIC. In addition to these discussions, analysis of other secondary data and recommendations forwarded to explain how claims should handle properly. During the thesis research period,there were 14 simple random selected projects have been studied as a case studies. From studied projects,the time extension in average, exceed 117.7% of its original contract completion time and the cost compensation increase 34.8% comparing to its initial contract value. Thus, the main causes of the majority contract claim problem lies on the failure in contract claim management and on unforeseen circumstance like variation, adverse climate, right of way problems, etc. Finally this thesis contributes to the improvement of contract claim management construction industry and open ways for further researches related to claim management.展开更多
The development of digital transformation in the construction industry has led to the increasing adoption of smart contracts.As programmable applications to automatically write,verify,and enforce transaction condition...The development of digital transformation in the construction industry has led to the increasing adoption of smart contracts.As programmable applications to automatically write,verify,and enforce transaction conditions,smart contracts can be used in different areas mainly to improve automation level,information security,and built digital environment enhancement.However,the smart contract is commonly mentioned as a blockchain appendage,while its unique connotation and value in the construction industry have not been recognized.Therefore,this study carries out a systematic review based on 81 research articles published from 2014 to 2021 on smart contract applications in construction to explore and highlight their potentials under domain-specific requirements.Results are analyzed according to research type categorization and domain codification.Eight research domains are identified,where the three most highly explored domains are contract and payment,supply chain and logistics,and information management.The integration of smart contracts with other innovative concepts and advanced technologies is analyzed.The applicability,benefits,and challenges of smart contract applications regarding different research domains are discussed.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management ...A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction.展开更多
The Ghanaian construction industry continues to improve by the recent intensification of infrastructure development by government and the private sector. Nonetheless, this is happening with a strong focus on economic ...The Ghanaian construction industry continues to improve by the recent intensification of infrastructure development by government and the private sector. Nonetheless, this is happening with a strong focus on economic development to the detriment of the environment these activities affect. This paper focuses on identifying the strategies by which sustainable environmental management could be structured to mitigate the impact of construction activities in Ghana. A mixed-method research approach was adopted. Quantitative data were collected from 83 practitioners in the construction industry, while qualitative data were elicited from 18 Construction and Environmental Management practitioners. The mean scores indicated that all the 20 strategies for integrating environmental concerns into construction activities in Ghana were considered significant by the respondents. The empirical findings of the study indicate that for environmental concerns to be effectively integrated into construction activities in Ghana, a concerted effort will be required from the various actors within the construction industry. These include the role of clients in selecting environmentally conscious service providers, designers focusing on environmentally friendly construction materials and methods, reduce, recycling and reuse of waste materials, the commitment of government towards sustainable development, and well-structured educational campaigns to promote environmentally sustainable construction activities.展开更多
In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on ...In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.展开更多
With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,constructio...With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.展开更多
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou...The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
文摘This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction industry in Ghana. The research methodology employed in this study was a quantitative technique. Questionnaires were distributed to 641 participants within construction industry in Ghana. Questionnaires retrieved for the analysis were 536. Three steps approached were used for the data analysis. These include Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA), and Structural Equation Modeling (SEM) analysis. After conducting the EFA and CFA, SEM was also used to analyze the construct validity. The SEM analysis helps to determine four key indicator variables for the leadership and top management construct. These include Leadership/Top Management approach to employees’ management, Leadership/Top Management understanding of TQM, Leadership/Top Management empowerment of employees to resolve quality issues, and Leadership/Top Management endorsement of TQM. All the four indicator variables were found to be good of fit and closely associated with the dependent variable. The study adds to the body of knowledge by using EFA, CFA and SEM techniques to establish key leadership and top management factors affecting TQM implementation in Ghana’s construction industry. The findings in general suggested that leadership and top Management factors identified have a direct positive impact on sustaining TQM implementation in the Ghanaian construction industry. Consequently, the leadership and top management factors identified in this study can help improve TQM in the Ghanaian construction industry.
文摘In the field of the construction industry, logistics management has become an issue of concern which needs to be focused on in order to ensure effective, successful and timely execution of projects in the construction industry. Logistics management in construction is a multidisciplinary process which makes sure things are done at the right time, cost and quality as well as material supply and handling, schedule control, site infrastructure and equipment location, site physical flow management, traffic arrangements on and around the construction site, and information management related to all physical and services flow. This paper seeks to identify and evaluate the possible factors that affect logistics management in the construction industry and also to ascertain the current practices of inventory management and the effect on logistics management envisage by construction personnel’s and stake holders. A descriptive survey research was conducted with both structured and unstructured questionnaire and administered both via e-mail and by sending questionnaire link onto a WhatsApp platform groups of the respondents, and out of the 187 respondents that took part in the survey, 22 respondents feedback were incomplete so 165 member respondents results were analyzed representing 88.2% response rate. The survey results were analyzed, displayed and interpreted in the form of tables, bar charts, column chart and pie chart with the use of SPSS software. The research survey respondents </span><span style="font-family:Verdana;">were </span><span style="font-family:Verdana;">comprised of Project Managers, Project Coordinators, Foremen, Site Managers/</span><span style="font-family:Verdana;"> </span><span style="font-family:Verdana;">Officers, Logistics Managers, Inventory Managers and Laborers. The survey results revealed that majority of the total respondents are in the capacity or position as Logistics Managers and also have from 5 to 10 years working experience, and as well majority of the respondents have also attained Master’s degree qualification. It was also revealed that logistics management is greatly affected by the inability or the failure to embrace, adopt and integrate new and emerging technology and its approach into the logistics management system. Majority of the respondents also indicated that in general the adequacy of inventory management system was dissatisfied representing 63.8% of the total respondents. The construction industry not only needed to improve its inventory management systems but also to ensure appropriate inventory management techniques for enhancing high degree of accuracy, reduced cycle times and replenishment of stock. This usually accounts for the poor delivery and quality of work, accompanied with delays and other associated losses in project construction. For effective Logistics management to be achieved in the construction industry, the introduction of modern technology to carry out logistics functions in the construction industry should be paramount to the industry players.
文摘Accounts receivables are amounts that customers owe on account, which resulting from sale goods and services. Compames generally expect to collect accounts receivable within 30 to 60 days. Sales and profits can be increased by granting customers the privileges of making payment a month or more after the date of sale. The accounts receivable play significant important role in company' s flow of funds, lots of companies was bankrupted and going bankrupt because capital turnover is so bad in reality, so that how to strength the management of the accounts receivable becomes the key in the process of making the industry survive and develop. Especially the construction industry, it will produce a large amount of the accounts receivable because of the it ' s own character of whole industry. This text will to come up with the corresponding countermeasure by analyzing accounts receivable management situation and the influence to companies and forming causes.
文摘Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the contractual roles to settle the claims comfortably, this paper devote the research and literate review to find the key problems in contract claim management and give recommendation accordingly. With this focused objective, this paper presents a research analysis based on randomly selected data from international construction organization. The contract claim case studies analyzed by sampling survey scientific research method that follows a research strategy of specific to general. In the beginning, the paper analyzes the elements of contract claim administration,and then provides the general overview of the contract claim. Finally, it numerates the claim causes usage through cases studies under different contract condition of FIDIC. In addition to these discussions, analysis of other secondary data and recommendations forwarded to explain how claims should handle properly. During the thesis research period,there were 14 simple random selected projects have been studied as a case studies. From studied projects,the time extension in average, exceed 117.7% of its original contract completion time and the cost compensation increase 34.8% comparing to its initial contract value. Thus, the main causes of the majority contract claim problem lies on the failure in contract claim management and on unforeseen circumstance like variation, adverse climate, right of way problems, etc. Finally this thesis contributes to the improvement of contract claim management construction industry and open ways for further researches related to claim management.
基金This study was carried out as part of the BIMcontracts research project funded by the German Federal Ministry for Economic Affairs and Energy(BMWi)within the“Smart Data Economy”technology program(Grant No.01MD19006B).
文摘The development of digital transformation in the construction industry has led to the increasing adoption of smart contracts.As programmable applications to automatically write,verify,and enforce transaction conditions,smart contracts can be used in different areas mainly to improve automation level,information security,and built digital environment enhancement.However,the smart contract is commonly mentioned as a blockchain appendage,while its unique connotation and value in the construction industry have not been recognized.Therefore,this study carries out a systematic review based on 81 research articles published from 2014 to 2021 on smart contract applications in construction to explore and highlight their potentials under domain-specific requirements.Results are analyzed according to research type categorization and domain codification.Eight research domains are identified,where the three most highly explored domains are contract and payment,supply chain and logistics,and information management.The integration of smart contracts with other innovative concepts and advanced technologies is analyzed.The applicability,benefits,and challenges of smart contract applications regarding different research domains are discussed.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction.
文摘The Ghanaian construction industry continues to improve by the recent intensification of infrastructure development by government and the private sector. Nonetheless, this is happening with a strong focus on economic development to the detriment of the environment these activities affect. This paper focuses on identifying the strategies by which sustainable environmental management could be structured to mitigate the impact of construction activities in Ghana. A mixed-method research approach was adopted. Quantitative data were collected from 83 practitioners in the construction industry, while qualitative data were elicited from 18 Construction and Environmental Management practitioners. The mean scores indicated that all the 20 strategies for integrating environmental concerns into construction activities in Ghana were considered significant by the respondents. The empirical findings of the study indicate that for environmental concerns to be effectively integrated into construction activities in Ghana, a concerted effort will be required from the various actors within the construction industry. These include the role of clients in selecting environmentally conscious service providers, designers focusing on environmentally friendly construction materials and methods, reduce, recycling and reuse of waste materials, the commitment of government towards sustainable development, and well-structured educational campaigns to promote environmentally sustainable construction activities.
文摘In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.
文摘With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.
文摘The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.