期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Construction parameters of graded sand-gravel foundation on seismic response law of nuclear safety grade underground corridor
1
作者 Yue Li Xunqiang Yin 《Earthquake Research Advances》 CSCD 2022年第4期39-45,共7页
The treatment of soft soil foundation under nuclear safety grade corridors with graded sand and gravel materials has a good development prospect.It is of great engineering value to explore the influence of constructio... The treatment of soft soil foundation under nuclear safety grade corridors with graded sand and gravel materials has a good development prospect.It is of great engineering value to explore the influence of construction parameters of graded sand and gravel foundation on the seismic response of gallery structures.Taking the safety grade underground corridor of a nuclear power plant as the engineering background,the equivalent linear method is used to consider the nonlinear dynamic characteristics of graded sand and gravel.The energy transfer boundary is applied at the truncation boundary to simulate the dissipation effect of scattered wave fluctuation energy and the ground motion input.The thicknessless contact element is introduced to consider the contact effect between the corridor structure and the graded sand and gravel foundation,so as to establish the calculation model of the dynamic interaction between the graded sand and gravel foundation and the corridor structure.Furthermore,the influence of the relative compactness and the foundation treatment depth on the seismic response of the corridor structure is studied,and the calculation results of the acceleration response spectrum and relative displacement of the corridor structure are analyzed.The calculation results show that the two construction parameters have different degrees of influence on the seismic response of corridor structure.The research results can provide reference for the engineering design and construction of underground corridors,and provide technical support for the application of graded gravel materials in soft soil foundation treatment. 展开更多
关键词 nuclear power plants Underground corridor graded sand-gravel foundation construction parameters Seismic response
下载PDF
Study on Ground Deformation during Shield Tunnel Construction
2
作者 Zhongkun Zhang 《Journal of Construction Research》 2021年第2期19-26,共8页
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass... Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction. 展开更多
关键词 Shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation Shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation
下载PDF
Studies on the Construction Parameter of an Artificial Occluded Cell for In-situ Inspection of the Propagation Rate of Localized Corrosion
3
作者 Liangcai LEI, Fengping WANG, Yanmin GAO and Yuanlong DU State Key Lab for Corrosion and Protection, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016, China To whom correspondence should be addressed Present address: Department of 《Journal of Materials Science & Technology》 SCIE EI CAS CSCD 2001年第3期355-358,共4页
An artificial localized corrosion system is assembled and some parameters related to the localized corrosion in active dissolution state (i.e., non-passive state) have been studied. The results showed that the develop... An artificial localized corrosion system is assembled and some parameters related to the localized corrosion in active dissolution state (i.e., non-passive state) have been studied. The results showed that the developed electrochemical system can satisfactorily imitate a naturally formed localized corrosion and the coupling current can indicate the maximum localized propagating rate. In this artificial system, the anodic dissolution reaction followed the auto-catalytic mechanism. The localized corrosion current density was dependent on the area ratio R of the cathode to the occluded anode. While R was equal to or more than 6, the coupling current reached at a maximum value and did not alter with the increase in R-value. Therefore, R=7 is chosen as one of these optimum parameters used in constructing the system, with which the biggest galvanic current might be obtained. In contrast, the thickness of the polymer filler separating the occluded anode area from the bulk electrolyte solution and the volume of the occluded anode area did not affect the corrosion current obviously. They might affect the response time to approach a steady state. 展开更多
关键词 In Cell Studies on the construction Parameter of an Artificial Occluded Cell for In-situ Inspection of the Propagation Rate of Localized Corrosion UNS
下载PDF
Plugging behaviors of temporary plugging particles in hydraulic fractures
4
作者 GUO Jianchun ZHAN Li +5 位作者 LU Qianli QI Tianjun LIU Yuxuan WANG Xin CHEN Chi GOU Xinghao 《Petroleum Exploration and Development》 SCIE 2023年第2期464-472,共9页
Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experim... Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity. 展开更多
关键词 hydraulic fracture temporary plugging and diversion temporary plugging particle plugging characteristics construction parameters combination
下载PDF
Machine learning-based automatic control of tunneling posture of shield machine 被引量:4
5
作者 Hongwei Huang Jiaqi Chang +3 位作者 Dongming Zhang Jie Zhang Huiming Wu Gang Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1153-1164,共12页
For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shiel... For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shield machine by setting hundreds of tunneling parameters empirically.Machine learning(ML)algorithm is an alternative method that can let the computer to learn from the driver’s operation and try to model the relationship between parameters automatically.Thus,in this paper,three ML algorithms,i.e.multi-layer perception(MLP),support vector machine(SVM)and gradient boosting regression(GBR),are improved by genetic algorithm(GA)and principal component analysis(PCA)to predict the tunneling posture of the shield machine.A set of the parameters for shield tunneling is extracted from the construction site of a Shanghai metro.In total,53,785 pairwise data points are collected for about 373 d and the ratio between training set,validation set and test set is 3:1:1.Each pairwise data point includes 83 types of parameters covering the shield posture,construction parameters,and soil stratum properties at the same time.The test results show that the averaged R2 of MLP,SVM and GBR based models are 0.942,0.935 and 0.6,respectively.Then the automatic control for the posture of shield tunnel is illustrated with an application example of the proposed models.The proposed method is proved to be helpful in controlling the construction quality with optimized construction parameters. 展开更多
关键词 Shield tunneling Machine learning(ML) construction parameters Optimization
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部