There are many processes involved in construction, it is necessary to optimize the path planning of construction robots. Most researches focused more on optimization algorithms, but less on comparative analysis based ...There are many processes involved in construction, it is necessary to optimize the path planning of construction robots. Most researches focused more on optimization algorithms, but less on comparative analysis based on the advantages and shortcomings of these algorithms. Therefore, the innovation of this paper is to analyze three advanced optimization algorithms (genetic algorithm, hybrid particle swarm algorithm and ant colony algorithm) and discuss how these algorithms can improve the optimization performance by adjusting parameters. Finally, the three algorithms are compared and analyzed to find an optimization algorithm that is suitable for path planning optimization of construction robots. The purpose of the optimization is to obtain the maximum benefit with the least cost and complete project in an efficient and economical way.展开更多
Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appr...Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appropriate settings of the algorithm’s parameters is considered to be a nontrivial task and is usually set manually to values that are known to give reasonable performance. In this paper, Ant Colony Optimization with Parametric Analysis (ACO-PA) is developed to overcome this drawback. The main feature of the ACO-PA is the ability of deciding the appropriate parameter values within the predefined parameter variations. Besides, a new approach which enables the pheromone information value to be proportional to the heuristic information value is introduced. The effectiveness of the proposed algorithm is investigated through the application of the algorithm to the construction site layout problems taken from the state-of-art. Results show that the ACO-PA can reduce transportation cost up to 16.8% compared to the site layouts generated by Genetic Algorithms and basic ACO. Moreover, the effects of parameter settings on the generated solutions are investigated.展开更多
Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different...Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.展开更多
For the optimization of pipelines, most researchers are mainly concerned with designing the most reasonable section to meet the requirements of strength and stiffness, and at the same time reduce the cost as much as p...For the optimization of pipelines, most researchers are mainly concerned with designing the most reasonable section to meet the requirements of strength and stiffness, and at the same time reduce the cost as much as possible. It is undeniable that they do achieve this goal by using the lowest cost in design phase to achieve maximum benefits. However, for pipelines, the cost and incomes of operation management are far greater than those in design phase. Therefore, the novelty of this paper is to propose an optimization model that considers the costs and incomes of the construction and operation phases, and combines them into one model. By comparing three optimization algorithms (genetic algorithm, quantum genetic algorithm and simulated annealing algorithm), the same optimization problem is solved. Then the most suitable algorithm is selected and the optimal solution is obtained, which provides reference for construction and operation management during the whole life cycle of pipelines.展开更多
To meet the requirements of specifications,intelligent optimization of steel bar blanking can improve resource utilization and promote the intelligent development of sustainable construction.As one of the most importa...To meet the requirements of specifications,intelligent optimization of steel bar blanking can improve resource utilization and promote the intelligent development of sustainable construction.As one of the most important building materials in construction engineering,reinforcing bars(rebar)account for more than 30%of the cost in civil engineering.A significant amount of cutting waste is generated during the construction phase.Excessive cutting waste increases construction costs and generates a considerable amount of CO_(2)emission.This study aimed to develop an optimization algorithm for steel bar blanking that can be used in the intelligent optimization of steel bar engineering to realize sustainable construction.In the proposed algorithm,the integer linear programming algorithm was applied to solve the problem.It was combined with the statistical method,a greedy strategy was introduced,and a method for determining the dynamic critical threshold was developed to ensure the accuracy of large-scale data calculation.The proposed algorithm was verified through a case study;the results confirmed that the rebar loss rate of the proposed method was reduced by 9.124%compared with that of traditional distributed processing of steel bars,reducing CO_(2)emissions and saving construction costs.As the scale of a project increases,the calculation quality of the optimization algorithmfor steel bar blanking proposed also increases,while maintaining high calculation efficiency.When the results of this study are applied in practice,they can be used as a sustainable foundation for building informatization and intelligent development.展开更多
There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk f...There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control.展开更多
Time and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project...Time and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. We show a model of linear entire mixed programming to solve the considered problem. The aim is to minimize the project total time, by means of the assignment of equipments of work to the different production lines of the activities to realizing. The fundamental beginning is to support the same production (rate of production in meters/day of the activity in view of the equipment of work) for tbe different equipments to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. However, this paper also presents the bibliographical study on methodologies of the optimization of construction processes in response to the two objectives: time and cost. This will consider the use of recta-heuristic techniques, such as population based algorithms.展开更多
[Objectives]To explore the evolution of the legal system of farmland protection and explore the rules and characteristics of policy development based on the theory and logic of institutional change since China's r...[Objectives]To explore the evolution of the legal system of farmland protection and explore the rules and characteristics of policy development based on the theory and logic of institutional change since China's reform and opening up,reveal the problems and deep-seated reasons of its legislation,clarify the direction of farmland protection in the new period,and solve the"non-agricultural""non-grain"and ecological problems of farmland.[Methods]Literature analysis and inductive deduction methods were used.[Results]The evolution of the farmland protection legal system has gone through the process of"national consciousness-policy guidelines-institutional system",the change from"single subject to multiple subjects";change from the use of"one-way administrative means to coordinated use of administrative,economic and technical means".The practical problems of the farmland protection legal system are mainly due to the insufficient systematization of the farmland protection legal system itself,the generalization of quantity protection,the transformation of quality protection,and the absence of ecological protection.[Conclusions]It is recommended to improve the existing farmland protection legal system from the establishment of the Farmland Protection Law,the improvement of the farmland protection public participation mechanism and supervision mechanism,the establishment of the farmland quality construction and improvement system,the differentiated farmland occupation and supplementation balance system,and the ecological restoration system.展开更多
During the construction process of the construction project,the construction technology management work can improve the overall quality of the project construction.In the context of increasingly fierce competition in ...During the construction process of the construction project,the construction technology management work can improve the overall quality of the project construction.In the context of increasingly fierce competition in the construction market,construction enterprises should strengthen the management of construction technology,enhance their technical level and market competitiveness,and promote the development of the construction market[1].The paper mainly analyzes the optimization methods of build-Keywords:ing construction technology management.展开更多
With the improvement of the quality education in our country, the teaching reform of college English teaching has been carried out. In the college English teaching system, we need the network-based autonomous teaching...With the improvement of the quality education in our country, the teaching reform of college English teaching has been carried out. In the college English teaching system, we need the network-based autonomous teaching mode, and effective evaluation system of English teaching is also necessary. A complete set of teaching evaluation system can truly reffect the teaching effect, and can promote the optimization of teaching activities as well. Therefore, in order to realize the effectiveness of English teaching and to expand the diversifi ed teaching mode, we need to build a complete set of English language system. Classroom teaching evaluation is one of the effective means to improve the teaching efficiency, which reffects the characteristics of college English courses. After the digitalization of the teaching methods, the network information produced in the teaching and management has obvious characteristics of large data. The optimized evaluation system of college English classroom teaching has realized the diversifi cation of evaluation subjects.展开更多
In this paper, we conduct research on the construction and optimization on environmental protection under the background of species diversity and green ecology. In scope, the environmental policies include pollution c...In this paper, we conduct research on the construction and optimization on environmental protection under the background of species diversity and green ecology. In scope, the environmental policies include pollution control policies, ecological conservation policies and basic international environmental policies which should be considered based on the following aspects. (1) The urban environment issue possibly emerges in the urban inside and outside interactions, thus the government to the ecological environment must pay attention to the sector coordination, and even must global footprint from the national and criterion consideration. (2) Environmental protection is not only adapted to the needs of the environment through the transformation, but stressed that ecological construction, that is, to promote the coordination between mankind and the natural environment. Development and protection are regional which should be global and intertwined.展开更多
Building construction needs have expanded in line with people's demands and the quality of life in today’s society.Therefore,the traditional construction management technology can no longer meet the current manag...Building construction needs have expanded in line with people's demands and the quality of life in today’s society.Therefore,the traditional construction management technology can no longer meet the current management and construction requirements,so it is necessary to further optimize the construction management technology.Therefore,this paper focuses on exploring measures regarding building construction technology optimization.Firstly,the paper briefly expounds its optimization value,then systematically analyzes some problems faced by the current housing construction management,and finally puts forward some targeted management optimization measures for future reference.展开更多
The effectiveness of mobile robot aided for architectural construction depends strongly on its accurate localization ability.Localization of mobile robot is increasingly important for the printing of buildings in the ...The effectiveness of mobile robot aided for architectural construction depends strongly on its accurate localization ability.Localization of mobile robot is increasingly important for the printing of buildings in the construction scene.Although many available studies on the localization have been conducted,only a few studies have addressed the more challenging problem of localization for mobile robot in large-scale ongoing and featureless scenes.To realize the accurate localization of mobile robot in designated stations,we build an artificial landmark map and propose a novel nonlinear optimization algorithm based on graphs to reduce the uncertainty of the whole map.Then,the performances of localization for mobile robot based on the original and optimized map are compared and evaluated.Finally,experimental results show that the average absolute localization errors that adopted the proposed algorithm is reduced by about 21%compared to that of the original map.展开更多
Mutual influence may be driven by different models and operating mechanisms of grounding systems in multi-in-one substations.Even equipment damage and personal injury will occur in the event of a short-circuit or ligh...Mutual influence may be driven by different models and operating mechanisms of grounding systems in multi-in-one substations.Even equipment damage and personal injury will occur in the event of a short-circuit or lightning strike.To meet the construction requirements of different multi-in-one substations,two typical application modes of grounding systems in multi-in-one substations are analyzed in this paper:plane and longitudinal layout schemes.First,the safety index and withstand voltage of secondary equipment in multi-in-one substations are introduced.Second,the plane layout scheme of grounding grids is examined.Based on a 35-kV multi-in-one substations in Shanghai,it was verified that the overall grounding grid needs to be laid to meet the safety of secondary equipment in the station.Finally,considering that it is feasible to rebuild the upper layer of a substation,the longitudinal layout scheme of the grounding grid in multi-in-one substations is also examined.Safety assessment is carried out in terms of aspects such as short-circuits and lightning strikes,and relevant optimization construction methods are analyzed.In this study,a real 35-kV substation in Shanghai was selected as an example.Simulation and field tests based on Current Distribution,Electromagnetic Fields,Grounding and Soil Structure Analysis(CDEGS)software verified that the proposed construction scheme can achieve safe operation of multi-in-one substations.This construction idea can also serve as a reference for the future construction of multi-in-one substations.展开更多
Relying on the talent cultivation program of Chongqing Institute of Engineering,this paper combines the characteristics of the Engineering Costing Software Application course with its current status quo,analyzes the e...Relying on the talent cultivation program of Chongqing Institute of Engineering,this paper combines the characteristics of the Engineering Costing Software Application course with its current status quo,analyzes the existing problems and teaching pain points,and introduces knowledge mapping.The course construction is carried out in terms of the combing of knowledge points,the optimization of the course structure,the innovation of the teaching method,and the evaluation and feedback of the teaching in order to improve the systematicity and structural nature of the teaching content,enhance students’learning experience,and enhance their learning effect.It is conducive to the formation of students’knowledge systems and provides a basis for discussion and reference for improving the quality of teaching and cultivating application-oriented talents who meet the market demand.展开更多
This paper examines the application of polyurethane curing technology in the construction of railway track beds,with a specific focus on its implementation in China’s rapidly developing railway infrastructure.The stu...This paper examines the application of polyurethane curing technology in the construction of railway track beds,with a specific focus on its implementation in China’s rapidly developing railway infrastructure.The study begins by identifying the limitations of traditional ballasted track beds,especially under the demands of high-speed and heavyload railways.It then methodically analyzes the advantages of polyurethane-cured track beds,highlighting their improved mechanical properties,including enhanced stability and durability.The paper further explores the benefits of transitioning to prefabricated polyurethane track beds,emphasizing significant cost reductions,better construction quality,and enhanced maintainability.Through a detailed review of experimental data and practical applications,the paper demonstrates the efficacy of polyurethane track beds in various railway settings.A critical part of the research involves optimizing the structural parameters of polyurethane track beds to achieve the best balance of mechanical and damping properties.The conclusion of the paper underscores the potential of polyurethane curing technology as a transformative approach to railway track bed construction,offering a solution to the challenges posed by traditional methods and aligning with the evolving needs of modern railways.展开更多
According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimize...According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects.展开更多
Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UG...Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UGS)is proposed.This paper systemically describes the technical connotation,site selection principle and optimization process of operation parameters of the gas storage,and advantages of this technology.By making full use of the gravity displacement,miscibility,viscosity reduction,and imbibition features of natural gas flooding,the natural gas can be injected into oil reservoir to enhance oil recovery and build strategic gas storage at the same time,realizing the win-win situation of oil production and natural gas peak shaving.Compared with the gas reservoir storage,the integrated construction technology of gas storage has two profit models:increasing crude oil production and gas storage transfer fee,so it has better economic benefit.At the same time,in this kind of gas storage,gas is injected at high pressure in the initial stage of its construction,gas is injected and produced in small volume in the initial operation stage,and then in large volume in the middle and late operation stage.In this way,the gas storage wouldn’t have drastic changes in stress periodically,overcoming the shortcomings of large stress variations of gas reservoir storage during injection-production cycle due to large gas injection and production volume.The keys of this technology are site selection and evaluation of oil reservoir,and optimization of gravity displacement,displacement pressure,and gas storage operation parameters,etc.The pilot test shows that the technology has achieved initial success,which is a new idea for the rapid development of UGS construction in China.展开更多
With the rapid development in the service,medical,logistics and other industries,and the increasing demand for unmanned mobile devices,mobile robots with the ability of independent mapping,localization and navigation ...With the rapid development in the service,medical,logistics and other industries,and the increasing demand for unmanned mobile devices,mobile robots with the ability of independent mapping,localization and navigation capabilities have become one of the research hotspots.An accurate map construction is a prerequisite for a mobile robot to achieve autonomous localization and navigation.However,the problems of blurring and missing the borders of obstacles and map boundaries are often faced in the Gmapping algorithm when constructing maps in complex indoor environments.In this pursuit,the present work proposes the development of an improved Gmapping algorithm based on the sparse pose adjustment(SPA)optimizations.The improved Gmapping algorithm is then applied to construct the map of a mobile robot based on single-line Lidar.Experiments show that the improved algorithm could build a more accurate and complete map,reduce the number of particles required for Gmapping,and lower the hardware requirements of the platform,thereby saving and minimizing the computing resources.展开更多
Logistics is supposed to be the important source of profits for the enterprises besides reducing material consumption and improving labor productivity. Transportation costs, distribution center construction costs, ord...Logistics is supposed to be the important source of profits for the enterprises besides reducing material consumption and improving labor productivity. Transportation costs, distribution center construction costs, ordering costs, safe inventory costs and inventory holding costs are the important parts of the total logistics costs. In this paper, based on the research results of LMRP( location model of risk pooling) location with fixed construction cost, the LMRPVCC ( location model of risk pooling based on variable construction cost) will be introduced. Applying particle swarm optimization to several computational instances, the authors find the suboptimum solution of the model.展开更多
文摘There are many processes involved in construction, it is necessary to optimize the path planning of construction robots. Most researches focused more on optimization algorithms, but less on comparative analysis based on the advantages and shortcomings of these algorithms. Therefore, the innovation of this paper is to analyze three advanced optimization algorithms (genetic algorithm, hybrid particle swarm algorithm and ant colony algorithm) and discuss how these algorithms can improve the optimization performance by adjusting parameters. Finally, the three algorithms are compared and analyzed to find an optimization algorithm that is suitable for path planning optimization of construction robots. The purpose of the optimization is to obtain the maximum benefit with the least cost and complete project in an efficient and economical way.
文摘Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appropriate settings of the algorithm’s parameters is considered to be a nontrivial task and is usually set manually to values that are known to give reasonable performance. In this paper, Ant Colony Optimization with Parametric Analysis (ACO-PA) is developed to overcome this drawback. The main feature of the ACO-PA is the ability of deciding the appropriate parameter values within the predefined parameter variations. Besides, a new approach which enables the pheromone information value to be proportional to the heuristic information value is introduced. The effectiveness of the proposed algorithm is investigated through the application of the algorithm to the construction site layout problems taken from the state-of-art. Results show that the ACO-PA can reduce transportation cost up to 16.8% compared to the site layouts generated by Genetic Algorithms and basic ACO. Moreover, the effects of parameter settings on the generated solutions are investigated.
基金Supported by National Natural Science Foundation of China (No.50709024)Program for New Century Excellent Talents in University (No. NCET-08-0391)
文摘Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.
文摘For the optimization of pipelines, most researchers are mainly concerned with designing the most reasonable section to meet the requirements of strength and stiffness, and at the same time reduce the cost as much as possible. It is undeniable that they do achieve this goal by using the lowest cost in design phase to achieve maximum benefits. However, for pipelines, the cost and incomes of operation management are far greater than those in design phase. Therefore, the novelty of this paper is to propose an optimization model that considers the costs and incomes of the construction and operation phases, and combines them into one model. By comparing three optimization algorithms (genetic algorithm, quantum genetic algorithm and simulated annealing algorithm), the same optimization problem is solved. Then the most suitable algorithm is selected and the optimal solution is obtained, which provides reference for construction and operation management during the whole life cycle of pipelines.
基金funded by Nature Science Foundation of China(51878556)the Key Scientific Research Projects of Shaanxi Provincial Department of Education(20JY049)+1 种基金Key Research and Development Program of Shaanxi Province(2019TD-014)State Key Laboratory of Rail Transit Engineering Informatization(FSDI)(SKLKZ21-03).
文摘To meet the requirements of specifications,intelligent optimization of steel bar blanking can improve resource utilization and promote the intelligent development of sustainable construction.As one of the most important building materials in construction engineering,reinforcing bars(rebar)account for more than 30%of the cost in civil engineering.A significant amount of cutting waste is generated during the construction phase.Excessive cutting waste increases construction costs and generates a considerable amount of CO_(2)emission.This study aimed to develop an optimization algorithm for steel bar blanking that can be used in the intelligent optimization of steel bar engineering to realize sustainable construction.In the proposed algorithm,the integer linear programming algorithm was applied to solve the problem.It was combined with the statistical method,a greedy strategy was introduced,and a method for determining the dynamic critical threshold was developed to ensure the accuracy of large-scale data calculation.The proposed algorithm was verified through a case study;the results confirmed that the rebar loss rate of the proposed method was reduced by 9.124%compared with that of traditional distributed processing of steel bars,reducing CO_(2)emissions and saving construction costs.As the scale of a project increases,the calculation quality of the optimization algorithmfor steel bar blanking proposed also increases,while maintaining high calculation efficiency.When the results of this study are applied in practice,they can be used as a sustainable foundation for building informatization and intelligent development.
基金National Natural Science Foundation of China ( No. 10902078 and No. 51079115)
文摘There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control.
文摘Time and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. We show a model of linear entire mixed programming to solve the considered problem. The aim is to minimize the project total time, by means of the assignment of equipments of work to the different production lines of the activities to realizing. The fundamental beginning is to support the same production (rate of production in meters/day of the activity in view of the equipment of work) for tbe different equipments to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. However, this paper also presents the bibliographical study on methodologies of the optimization of construction processes in response to the two objectives: time and cost. This will consider the use of recta-heuristic techniques, such as population based algorithms.
基金Supported by National Natural Science Foundation of China(41771565).
文摘[Objectives]To explore the evolution of the legal system of farmland protection and explore the rules and characteristics of policy development based on the theory and logic of institutional change since China's reform and opening up,reveal the problems and deep-seated reasons of its legislation,clarify the direction of farmland protection in the new period,and solve the"non-agricultural""non-grain"and ecological problems of farmland.[Methods]Literature analysis and inductive deduction methods were used.[Results]The evolution of the farmland protection legal system has gone through the process of"national consciousness-policy guidelines-institutional system",the change from"single subject to multiple subjects";change from the use of"one-way administrative means to coordinated use of administrative,economic and technical means".The practical problems of the farmland protection legal system are mainly due to the insufficient systematization of the farmland protection legal system itself,the generalization of quantity protection,the transformation of quality protection,and the absence of ecological protection.[Conclusions]It is recommended to improve the existing farmland protection legal system from the establishment of the Farmland Protection Law,the improvement of the farmland protection public participation mechanism and supervision mechanism,the establishment of the farmland quality construction and improvement system,the differentiated farmland occupation and supplementation balance system,and the ecological restoration system.
文摘During the construction process of the construction project,the construction technology management work can improve the overall quality of the project construction.In the context of increasingly fierce competition in the construction market,construction enterprises should strengthen the management of construction technology,enhance their technical level and market competitiveness,and promote the development of the construction market[1].The paper mainly analyzes the optimization methods of build-Keywords:ing construction technology management.
文摘With the improvement of the quality education in our country, the teaching reform of college English teaching has been carried out. In the college English teaching system, we need the network-based autonomous teaching mode, and effective evaluation system of English teaching is also necessary. A complete set of teaching evaluation system can truly reffect the teaching effect, and can promote the optimization of teaching activities as well. Therefore, in order to realize the effectiveness of English teaching and to expand the diversifi ed teaching mode, we need to build a complete set of English language system. Classroom teaching evaluation is one of the effective means to improve the teaching efficiency, which reffects the characteristics of college English courses. After the digitalization of the teaching methods, the network information produced in the teaching and management has obvious characteristics of large data. The optimized evaluation system of college English classroom teaching has realized the diversifi cation of evaluation subjects.
文摘In this paper, we conduct research on the construction and optimization on environmental protection under the background of species diversity and green ecology. In scope, the environmental policies include pollution control policies, ecological conservation policies and basic international environmental policies which should be considered based on the following aspects. (1) The urban environment issue possibly emerges in the urban inside and outside interactions, thus the government to the ecological environment must pay attention to the sector coordination, and even must global footprint from the national and criterion consideration. (2) Environmental protection is not only adapted to the needs of the environment through the transformation, but stressed that ecological construction, that is, to promote the coordination between mankind and the natural environment. Development and protection are regional which should be global and intertwined.
文摘Building construction needs have expanded in line with people's demands and the quality of life in today’s society.Therefore,the traditional construction management technology can no longer meet the current management and construction requirements,so it is necessary to further optimize the construction management technology.Therefore,this paper focuses on exploring measures regarding building construction technology optimization.Firstly,the paper briefly expounds its optimization value,then systematically analyzes some problems faced by the current housing construction management,and finally puts forward some targeted management optimization measures for future reference.
基金This research was supported by National Natural Science Foundation of China(Nos.U1913603,61803251,51775322)National Key Research and Development Program of China(No.2019YFB1310003).
文摘The effectiveness of mobile robot aided for architectural construction depends strongly on its accurate localization ability.Localization of mobile robot is increasingly important for the printing of buildings in the construction scene.Although many available studies on the localization have been conducted,only a few studies have addressed the more challenging problem of localization for mobile robot in large-scale ongoing and featureless scenes.To realize the accurate localization of mobile robot in designated stations,we build an artificial landmark map and propose a novel nonlinear optimization algorithm based on graphs to reduce the uncertainty of the whole map.Then,the performances of localization for mobile robot based on the original and optimized map are compared and evaluated.Finally,experimental results show that the average absolute localization errors that adopted the proposed algorithm is reduced by about 21%compared to that of the original map.
基金supported by National Natural Science Foundation of China(No.92067105)the science and technology project of State Grid Shanghai Municipal Electric Power Company(No.5209211900VD).
文摘Mutual influence may be driven by different models and operating mechanisms of grounding systems in multi-in-one substations.Even equipment damage and personal injury will occur in the event of a short-circuit or lightning strike.To meet the construction requirements of different multi-in-one substations,two typical application modes of grounding systems in multi-in-one substations are analyzed in this paper:plane and longitudinal layout schemes.First,the safety index and withstand voltage of secondary equipment in multi-in-one substations are introduced.Second,the plane layout scheme of grounding grids is examined.Based on a 35-kV multi-in-one substations in Shanghai,it was verified that the overall grounding grid needs to be laid to meet the safety of secondary equipment in the station.Finally,considering that it is feasible to rebuild the upper layer of a substation,the longitudinal layout scheme of the grounding grid in multi-in-one substations is also examined.Safety assessment is carried out in terms of aspects such as short-circuits and lightning strikes,and relevant optimization construction methods are analyzed.In this study,a real 35-kV substation in Shanghai was selected as an example.Simulation and field tests based on Current Distribution,Electromagnetic Fields,Grounding and Soil Structure Analysis(CDEGS)software verified that the proposed construction scheme can achieve safe operation of multi-in-one substations.This construction idea can also serve as a reference for the future construction of multi-in-one substations.
基金Chongqing Engineering Institute 2023 First-Class Course Construction Project“Online and Offline Hybrid Course:Engineering Costing Software Application”(KC20230116)。
文摘Relying on the talent cultivation program of Chongqing Institute of Engineering,this paper combines the characteristics of the Engineering Costing Software Application course with its current status quo,analyzes the existing problems and teaching pain points,and introduces knowledge mapping.The course construction is carried out in terms of the combing of knowledge points,the optimization of the course structure,the innovation of the teaching method,and the evaluation and feedback of the teaching in order to improve the systematicity and structural nature of the teaching content,enhance students’learning experience,and enhance their learning effect.It is conducive to the formation of students’knowledge systems and provides a basis for discussion and reference for improving the quality of teaching and cultivating application-oriented talents who meet the market demand.
文摘This paper examines the application of polyurethane curing technology in the construction of railway track beds,with a specific focus on its implementation in China’s rapidly developing railway infrastructure.The study begins by identifying the limitations of traditional ballasted track beds,especially under the demands of high-speed and heavyload railways.It then methodically analyzes the advantages of polyurethane-cured track beds,highlighting their improved mechanical properties,including enhanced stability and durability.The paper further explores the benefits of transitioning to prefabricated polyurethane track beds,emphasizing significant cost reductions,better construction quality,and enhanced maintainability.Through a detailed review of experimental data and practical applications,the paper demonstrates the efficacy of polyurethane track beds in various railway settings.A critical part of the research involves optimizing the structural parameters of polyurethane track beds to achieve the best balance of mechanical and damping properties.The conclusion of the paper underscores the potential of polyurethane curing technology as a transformative approach to railway track bed construction,offering a solution to the challenges posed by traditional methods and aligning with the evolving needs of modern railways.
文摘According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects.
基金Supported by the Petro China Preliminary Research Project(2021-40217-000041)Changqing Oilfield Technology Development Project(RIPED-JS-50016)。
文摘Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UGS)is proposed.This paper systemically describes the technical connotation,site selection principle and optimization process of operation parameters of the gas storage,and advantages of this technology.By making full use of the gravity displacement,miscibility,viscosity reduction,and imbibition features of natural gas flooding,the natural gas can be injected into oil reservoir to enhance oil recovery and build strategic gas storage at the same time,realizing the win-win situation of oil production and natural gas peak shaving.Compared with the gas reservoir storage,the integrated construction technology of gas storage has two profit models:increasing crude oil production and gas storage transfer fee,so it has better economic benefit.At the same time,in this kind of gas storage,gas is injected at high pressure in the initial stage of its construction,gas is injected and produced in small volume in the initial operation stage,and then in large volume in the middle and late operation stage.In this way,the gas storage wouldn’t have drastic changes in stress periodically,overcoming the shortcomings of large stress variations of gas reservoir storage during injection-production cycle due to large gas injection and production volume.The keys of this technology are site selection and evaluation of oil reservoir,and optimization of gravity displacement,displacement pressure,and gas storage operation parameters,etc.The pilot test shows that the technology has achieved initial success,which is a new idea for the rapid development of UGS construction in China.
基金National Key Research and Development of China(No.2019YFB1600700)Sichuan Science and Technology Planning Project(No.2021YFSY0003)。
文摘With the rapid development in the service,medical,logistics and other industries,and the increasing demand for unmanned mobile devices,mobile robots with the ability of independent mapping,localization and navigation capabilities have become one of the research hotspots.An accurate map construction is a prerequisite for a mobile robot to achieve autonomous localization and navigation.However,the problems of blurring and missing the borders of obstacles and map boundaries are often faced in the Gmapping algorithm when constructing maps in complex indoor environments.In this pursuit,the present work proposes the development of an improved Gmapping algorithm based on the sparse pose adjustment(SPA)optimizations.The improved Gmapping algorithm is then applied to construct the map of a mobile robot based on single-line Lidar.Experiments show that the improved algorithm could build a more accurate and complete map,reduce the number of particles required for Gmapping,and lower the hardware requirements of the platform,thereby saving and minimizing the computing resources.
基金supported by the National Planning Office of Philos-ophy and Social Sciences under Grant No. 07XJY015Shaanxi Provincial Department of Education under Grant No.06JK056
文摘Logistics is supposed to be the important source of profits for the enterprises besides reducing material consumption and improving labor productivity. Transportation costs, distribution center construction costs, ordering costs, safe inventory costs and inventory holding costs are the important parts of the total logistics costs. In this paper, based on the research results of LMRP( location model of risk pooling) location with fixed construction cost, the LMRPVCC ( location model of risk pooling based on variable construction cost) will be introduced. Applying particle swarm optimization to several computational instances, the authors find the suboptimum solution of the model.