期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996) 被引量:2
1
《Electricity》 1996年第4期53-53,共1页
关键词 as of Aug construction Schedule of Generating Units Actually Realized in 1996
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
2
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 construction Schedule of Generating Units to be Commissioned in 1998
下载PDF
Lower Project Cost,Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
3
《Electricity》 1999年第3期23-27,共5页
关键词 PROJECT Lower Project Cost Shorten construction Schedule and Promote Market Competition of Fossil Power Plants
下载PDF
Construction of Ling'ao Nuclear Power Plant proceeds as scheduled
4
《Electricity》 1997年第2期22-22,共1页
关键词 construction of Ling’ao Nuclear Power Plant proceeds as scheduled
下载PDF
Comparative analysis of cast-in-place post-tensioned and steel-concrete composite bridge bent caps 被引量:1
5
作者 Nur Yazdani Francisco D.B.Ruiz 《Journal of Modern Transportation》 2017年第3期194-204,共11页
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern... The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings. 展开更多
关键词 Bridge pier cap Bridge bent - Post-tensionedstructure Steel-concrete cap Cost estimation construction schedule Traffic closing cost
下载PDF
Integration of Radio-Frequency Identification and 4D CAD in Construction Management 被引量:1
6
作者 胡文发 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期151-157,共7页
In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated mo... In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated model of radio-frequency identification (RFID) and four-dimensional Computer-Aided Design (4D CAD) in construction management. RFID involves the use of tags that collect data and transmit data. RFID can collect data by radio waves instead of light waves. RFID technology is surpassing barcode technology where light waves are easily blocked and barcode labels are easy to fall off or become unreadable due to dust, dirt, or other contaminants. 4D CAD which involves 3D construction models and construction schedules presents visualized construction process. Integration of RFID and 4D CAD in this paper built a dynamic construction management and control system which would reduce the time of capturing data on site and control quality of construction materials efficiently. Pilot test result shows that a construction manager can easily understand how and what a complicated construction project will be accomplished. Although further analysis is necessary, RFID and 4D CAD show promises of being a beneficial technology in construction management. 展开更多
关键词 radio frequency identification (RFID) four-dimensional computer-aided design (4D CAD) construction management construction visualization construction schedule
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部