Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
The enormity of the problem of construction accidents and hazards in the Ghanaian construction industry (GCI) calls for the need to engage in relevant research to equip stakeholders with the required knowledge to impr...The enormity of the problem of construction accidents and hazards in the Ghanaian construction industry (GCI) calls for the need to engage in relevant research to equip stakeholders with the required knowledge to improve construction health and safety (CHS) and reduce site accidents and hazards. The complexity of the problem of accident causation explains a large number of conceptual models developed to aid the understanding of the dynamics involved in CHS. This paper involved a qualitative study to identify causes of accidents and hazards in the GCI and underlying issues requiring remedying and also a desk study to review Health and Safety related theories and concepts from extant literature to explain and contribute to the improvement of CHS. The paper contributes to the use of theories to advance studies on improving health and safety at construction sites, especially in developing countries like Ghana, where such studies have so far attracted little attention. The framework may enable construction stakeholders to easily identify problem areas on site and apply required improvement measures to create a healthier and safer construction site. The findings may provide useful knowledge to improve CHS and reduce site accidents and hazards, and also provide a multi-theory approach for understanding the dynamics of the complexity of the problems involved in CHS.展开更多
With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.Howeve...With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.However,in the construction process of low-gas tunnels,it will also cause a certain degree of adverse impact on the construction quality and safety due to the lack of technical experience and management experience to a certain extent.Based on this,this paper takes the actual tunnel project of a coal mine as an example to analyze the main construction technology and safety management measures of low-gas tunnels,so as to provide guarantee for the quality and safety of such tunnel construction.展开更多
As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with l...As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with low profitability,low overall scientific and technological level,insufficient innovation ability and weak application and protection of intellectual property rights.Based on the current situation of construction enterprises,combined with the author's enterprise,this paper considers the problems existing in the intellectual property management of construction enterprises,and puts forward some countermeasures for the intellectual property management.展开更多
This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies va...This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies various factors that cause construction enterprise risks from multiple angles,and uses scientific and effective methods to identify and evaluate risks,as well as determine the risk level.Through the overall risk management response strategies and empirical research of construction enterprises,this paper analyzes the general theory and main avoidance strategies of risk response of construction enterprises,and lays the foundation for follow-up risk management response in the form of cases through the implementation of technical route and innovation points.展开更多
Building construction site plays an important role in the economic aspect of a region. So any disruption due to hazard event like earthquake can cause several direct and indirect damages. Direct damages can lead to th...Building construction site plays an important role in the economic aspect of a region. So any disruption due to hazard event like earthquake can cause several direct and indirect damages. Direct damages can lead to the loss of equipments and qualified persons. Indirect damages can lead to inflation and loss of purchasing power. To deal with that situation, parameters that govern the vulnerability of building construction site have been identified. Using a MCDM (multiple criteria decision making) method, the priority order of these parameters has been set. Then a PVI (partial vulnerability index) and a GVI (global vulnerability index) are proposed. These indexes allow the classification of building construction sites according to their intrinsic vulnerability and seismic vulnerability respectively that is through the use of a given classification. Several Algerian building construction sites belonging to different seismic zones were considered in order to show the applicability of the method.展开更多
In this paper, the status quo of safety production on construction sites and the hazardous and harmful factors in the construction process were analyzed, and corresponding suggestions were proposed to make up for the ...In this paper, the status quo of safety production on construction sites and the hazardous and harmful factors in the construction process were analyzed, and corresponding suggestions were proposed to make up for the shortcomings of the safety production assurance system standards on construction sites.展开更多
Background: The Occupational Safety and Health Council(OSHC) is committed to improve the safety performance of the high risk construction industry.In the past three years,about 40% of the fatal accidents in the constr...Background: The Occupational Safety and Health Council(OSHC) is committed to improve the safety performance of the high risk construction industry.In the past three years,about 40% of the fatal accidents in the construction industry were related to Renovation,Maintenance,Alteration and Addition(RMAA).Due to the poor safety record,some of the RMAA contractors have difficulty in obtaining the Employees' Compensation Insurance(ECI) cover in the market,or if they could obtain the ECI,the premium rate would be exceedingly high.In view of this,the OSHC,the Labour Department jointly launched"OSH Star Enterprise-Pilot Scheme on Safety Accreditation for the RMAA Industry",which prompts the industry to take practicable safety measures to improve the safety of working environment and reduce occupational injuries.The program also helps the stakeholders and insurers to identify safety-conscious contractors and thereby provide them with a favourable premium rate under the Employees' Compensation Insurance Residual Scheme(ECIRS).Objectives: The OSHC launches the Pilot Scheme to improve the safety performance of the RMAA industry through providing safety training,subsidizing enterprise to purchase safety equipment and providing safety audit.We also use financial incentive to encourage RMAA enterprises to join the Pilot Scheme-for those who are accredited as "OSH Star Enterprise"could receive a premium discount from the ERIRS when obtaining the ECI.The scheme also differentiates those safety-conscious and law-abiding enterprises from the poor performers,which helps the industry and public identifying the RMAA contractors who pay attention to work safety.Methods: The Pilot Scheme targets RMAA enterprises that employ less than 50 employees in Hong Kong.A three-pronged approach is used to improve the safety performance of the RMAA industry: the Pilot Scheme provides(1) financial support for the RMAA contractors to buy a transportable temporary anchor device and full body safety harness and its anchor system;(2) safety training on RMAA work safety and safety & health supervisor course;and(3) safety audit.Results: Enterprises that successfully pass the safety audit and satisfied the Scheme requirements will be accredited as"OSH Star Enterprise",which will be valid for two years.These enterprises can also be upgraded to"OSH Gold Star Enterprise"based on their continuous improvement in safety performance.OSHC will set up a register of OSH-accredited enterprises in RMAA works for reference of the public to facilitate their choosing of accredited contractors.The Employees' Compensation Insurance Residual Scheme Bureau will provide privileged premium rate for enterprises with OSH accreditation."OSH Star Enterprise"could enjoy 40% discounts when joining their insurance scheme.For example,a skilled worker's annual premium can be reduced by about HK $ 36,000.While,the "OSH Gold Star Enterprise"could enjoy 50% discounts when joining their insurance scheme,which means a skilled worker's annual premium can be reduced up to HK $ 45,000.Achievements: This Pilot Scheme offers practical assistance as well as attractive financial incentives for the RMAA industry to improve their safety performance.The Employees'Compensation Insurance Residual Scheme provides premium discounts for enterprises that have a good safety record.It provides incentive for RMAA contractors to actively participate in the Pilot Scheme.The Scheme demonstrates that by providing a safe working environment and appropriate personal protective equipment to workers,the enterprise not only helps to reduce the accident rate of the industry but also receive an economic return.The Pilot Scheme bridges stakeholders of RMAA industry,the government and the insurance industry creating an "all-win"situation.This partnership approach to prevent injuries and accidents in the construction industry could be an effective model for other industries.展开更多
Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of enginee...Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of engineering structure becomes more complex,large-scale and high-level projects with deep foundation have appeared in engineering construction.For construction engineering,one of its technologies includes solving the difficulties in construction.It is required to deal with the safety risk of construction in time to guarantee safety construction,timely solve the management difficulties and contradictory problems of the project and ensure both the safety of engineering construction and the rationalization of the institution setting of the safety supervision on the project.展开更多
Construction industry is a generally risky business; it remains one of the most dirty, difficult and dangerous with poor working conditions. Despite recent efforts to improve site safety, it still accounts for a dispr...Construction industry is a generally risky business; it remains one of the most dirty, difficult and dangerous with poor working conditions. Despite recent efforts to improve site safety, it still accounts for a disproportionate number of occupational-related fatalities what is supported by statistics. According to the International Labour Organization, it accounts for 30-40% of the world's fatal injuries. In The European Union around thirteen employees out of every one hundred thousands are killed each year. Hence, construction site safety is a matter of global concern. However it is not easy to describe and define how to deport safely at some actual site because the workers are exposed to many safety risks varying in con^nection with conditions of the construction realization and with technologies using. The paper provides a brief knowledge from the study comparing the construction safety in Europe and North America referencing to presented statistics. There are also analyzed, described and systemized the principal groups of construction safety risks; described the interdependencies among safety risks, affecting by spatial, technological and time parameters of the building process, as well as by the site conditions.展开更多
The construction sites of mega construction projects(MCP) often have numerous participants with interfacing work within a highly complex system. It is critical how to realize collaborative work and information sharing...The construction sites of mega construction projects(MCP) often have numerous participants with interfacing work within a highly complex system. It is critical how to realize collaborative work and information sharing among such participants. The information and communication technologies(ICTs) provides a technical guarantee for solving this problem. Existing research has been achieved the partial processes digitization of construction site, but certain problems still exist: 1)information perception of the construction site is passive.2) common collaboration and coordination problems in the construction industry have not been addressed. The emerging trends of ICTs have resulted in the integration of various computer technologies such as CPS, BIM, big data, and cloud computing into construction process,which would changes behavioral and management mode of construction sites. These new ICTs have been applied successfully in MCP, in particular, Hong Kong-ZhuhaiMacao Bridge project. A new management mode of construction sites is inspired by these case. In this paper, a new management mode of construction site for MCP has been proposed, namely, smart construction site. The ultimate goal of smart construction site is to accomplish safe, efficient and high-quality construction. This study put forward the conceptual framework for smart construction site, and have identified three key elements of smart construction site, including information support platform,collaboration work, and intelligent construction management. A case study on Hong Kong-Zhuhai-Macao Bridge project work as an evidence to support the practicability of the proposed mode. Significant contributions of this study is to propose a new management mode for MCP in construction industry, which would enrich the body of knowledge or the construction management community.Future research should be dedicated to further explore the potential of smart construction site in MCP management.展开更多
China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and t...China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and to expedite the coordinated development of the Beijing-Tianjin-Hebei region.From 2017 to 2021,the China Geological Survey(CGS)took the lead in multi-factor urban geological surveys involving space,resources,environments,and disasters according to the general requirements of“global vision,international standards,distinctive Chinese features,and future-oriented goals”in Xiong’an New Area,identifying the engineering geologic conditions and geologic environmental challenges of this area.The achievements also include a 3D engineering geological structure model for the whole area,along with“one city proper and five clusters”,insights into the ecology and the background endowment of natural resources like land,geothermal resources,groundwater,and wetland of the area before engineering construction,a comprehensive monitoring network of resources and environments in the area,and the“Transparent Xiong’an”geological information platform that is open,shared,dynamically updated,and three-dimensionally visualized.China’s geologists and urban geology have played a significant role in the urban planning and construction of Xiong’an New Area,providing whole-process geological solutions for urban planning,construction,operation and management.The future urban construction of Xiong’an New Area will necessitate the theoretical and technical support of earth system science(ESS)from various aspects,and the purpose is to enhance the resilience of the new type of city and to provide support for the green,low-carbon,and sustainable development of this area.展开更多
The buildings construction safety problems contain various safety-hidden dangers that caused by the human unsafe behaviors, the substance unsafe conditions, operation environment unsafe factors and management defects....The buildings construction safety problems contain various safety-hidden dangers that caused by the human unsafe behaviors, the substance unsafe conditions, operation environment unsafe factors and management defects. The authors summarize comprehensively the problems of buildings construetion safety in China at present based on grasping the whole safety status of buildings construction, and the synthetic countermeasures including the systems about laws, management, technology and education civilization for buildings construction safety management are brought up based on the viewpoint of safety system theory. Then it is thought that huilding scientific management mechanisms and popularizing effective management methods and measures are the fundamental ways for improving further the level of safety management for buildings construction in China at present.展开更多
Despite the increasing dissemination of the Building Information Modeling(BIM)approach,many firms are still far from BIM and are only starting to adopt information technologies.We conducted an ethnographic action rese...Despite the increasing dissemination of the Building Information Modeling(BIM)approach,many firms are still far from BIM and are only starting to adopt information technologies.We conducted an ethnographic action research with an industrial partner that implements information technologies on its construction sites,with a strong preference for home-made applications.Results show that the development of such applications faces difficulties and that multiple iterations and versions are necessary before achieving the expected goals because the required competencies are lacking among internal development teams.Moreover,initial needs evolve considerably throughout the application’s development and evaluation process.However,notwithstanding the difficulties encountered during the different application development phases,the industrial partner believes the decision to be worthwhile because of the desire to have internal control over the project data and the need to consider certain specificities related to business processes.展开更多
The research focused on the analysis of construction and demolition debris in a sample Brazilian city with the objective to propose a management scheme tailored to private initiative intervention. The debris was found...The research focused on the analysis of construction and demolition debris in a sample Brazilian city with the objective to propose a management scheme tailored to private initiative intervention. The debris was found to be produced at a rate of 1.55 kg per person per day for a total of 5177 tons per month. The composition report showed 75% material reusable for construction purposes, 15% material recyclable through reverse logistics and 10% refuse to be disposed of at landfills. The study developed legal and managerial instruments that stimulate private operators to achieve landfill diversions in the order of 90% of this waste. The arguments were supported by a flow diagram that indicates the correct destination of all waste items and an economic balance of private waste movement. Proactive legal scriptures were sketched out that can assist the local administration in setting the timeframe for reaching the diversion target.展开更多
With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as pr...With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.展开更多
Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘The enormity of the problem of construction accidents and hazards in the Ghanaian construction industry (GCI) calls for the need to engage in relevant research to equip stakeholders with the required knowledge to improve construction health and safety (CHS) and reduce site accidents and hazards. The complexity of the problem of accident causation explains a large number of conceptual models developed to aid the understanding of the dynamics involved in CHS. This paper involved a qualitative study to identify causes of accidents and hazards in the GCI and underlying issues requiring remedying and also a desk study to review Health and Safety related theories and concepts from extant literature to explain and contribute to the improvement of CHS. The paper contributes to the use of theories to advance studies on improving health and safety at construction sites, especially in developing countries like Ghana, where such studies have so far attracted little attention. The framework may enable construction stakeholders to easily identify problem areas on site and apply required improvement measures to create a healthier and safer construction site. The findings may provide useful knowledge to improve CHS and reduce site accidents and hazards, and also provide a multi-theory approach for understanding the dynamics of the complexity of the problems involved in CHS.
文摘With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.However,in the construction process of low-gas tunnels,it will also cause a certain degree of adverse impact on the construction quality and safety due to the lack of technical experience and management experience to a certain extent.Based on this,this paper takes the actual tunnel project of a coal mine as an example to analyze the main construction technology and safety management measures of low-gas tunnels,so as to provide guarantee for the quality and safety of such tunnel construction.
文摘As the main force of construction enterprises,construction enterprises shoulder the important task of national pillar industries.However,at present,construction enterprises are still labor-intensive enterprises,with low profitability,low overall scientific and technological level,insufficient innovation ability and weak application and protection of intellectual property rights.Based on the current situation of construction enterprises,combined with the author's enterprise,this paper considers the problems existing in the intellectual property management of construction enterprises,and puts forward some countermeasures for the intellectual property management.
文摘This paper mainly starts from the perspectives of management and economics,combined with the characteristics of the construction industry,conducts qualitative and quantitative analysis of the risks involved,studies various factors that cause construction enterprise risks from multiple angles,and uses scientific and effective methods to identify and evaluate risks,as well as determine the risk level.Through the overall risk management response strategies and empirical research of construction enterprises,this paper analyzes the general theory and main avoidance strategies of risk response of construction enterprises,and lays the foundation for follow-up risk management response in the form of cases through the implementation of technical route and innovation points.
文摘Building construction site plays an important role in the economic aspect of a region. So any disruption due to hazard event like earthquake can cause several direct and indirect damages. Direct damages can lead to the loss of equipments and qualified persons. Indirect damages can lead to inflation and loss of purchasing power. To deal with that situation, parameters that govern the vulnerability of building construction site have been identified. Using a MCDM (multiple criteria decision making) method, the priority order of these parameters has been set. Then a PVI (partial vulnerability index) and a GVI (global vulnerability index) are proposed. These indexes allow the classification of building construction sites according to their intrinsic vulnerability and seismic vulnerability respectively that is through the use of a given classification. Several Algerian building construction sites belonging to different seismic zones were considered in order to show the applicability of the method.
基金Sponsored by Research Fund of Binzhou College(BZXYG1817)Ph.D. Startup Funding Project of Binzhou College(2016Y33)Experimental Technology Funding Project of Binzhou College(BZXYSYXM201816)
文摘In this paper, the status quo of safety production on construction sites and the hazardous and harmful factors in the construction process were analyzed, and corresponding suggestions were proposed to make up for the shortcomings of the safety production assurance system standards on construction sites.
文摘Background: The Occupational Safety and Health Council(OSHC) is committed to improve the safety performance of the high risk construction industry.In the past three years,about 40% of the fatal accidents in the construction industry were related to Renovation,Maintenance,Alteration and Addition(RMAA).Due to the poor safety record,some of the RMAA contractors have difficulty in obtaining the Employees' Compensation Insurance(ECI) cover in the market,or if they could obtain the ECI,the premium rate would be exceedingly high.In view of this,the OSHC,the Labour Department jointly launched"OSH Star Enterprise-Pilot Scheme on Safety Accreditation for the RMAA Industry",which prompts the industry to take practicable safety measures to improve the safety of working environment and reduce occupational injuries.The program also helps the stakeholders and insurers to identify safety-conscious contractors and thereby provide them with a favourable premium rate under the Employees' Compensation Insurance Residual Scheme(ECIRS).Objectives: The OSHC launches the Pilot Scheme to improve the safety performance of the RMAA industry through providing safety training,subsidizing enterprise to purchase safety equipment and providing safety audit.We also use financial incentive to encourage RMAA enterprises to join the Pilot Scheme-for those who are accredited as "OSH Star Enterprise"could receive a premium discount from the ERIRS when obtaining the ECI.The scheme also differentiates those safety-conscious and law-abiding enterprises from the poor performers,which helps the industry and public identifying the RMAA contractors who pay attention to work safety.Methods: The Pilot Scheme targets RMAA enterprises that employ less than 50 employees in Hong Kong.A three-pronged approach is used to improve the safety performance of the RMAA industry: the Pilot Scheme provides(1) financial support for the RMAA contractors to buy a transportable temporary anchor device and full body safety harness and its anchor system;(2) safety training on RMAA work safety and safety & health supervisor course;and(3) safety audit.Results: Enterprises that successfully pass the safety audit and satisfied the Scheme requirements will be accredited as"OSH Star Enterprise",which will be valid for two years.These enterprises can also be upgraded to"OSH Gold Star Enterprise"based on their continuous improvement in safety performance.OSHC will set up a register of OSH-accredited enterprises in RMAA works for reference of the public to facilitate their choosing of accredited contractors.The Employees' Compensation Insurance Residual Scheme Bureau will provide privileged premium rate for enterprises with OSH accreditation."OSH Star Enterprise"could enjoy 40% discounts when joining their insurance scheme.For example,a skilled worker's annual premium can be reduced by about HK $ 36,000.While,the "OSH Gold Star Enterprise"could enjoy 50% discounts when joining their insurance scheme,which means a skilled worker's annual premium can be reduced up to HK $ 45,000.Achievements: This Pilot Scheme offers practical assistance as well as attractive financial incentives for the RMAA industry to improve their safety performance.The Employees'Compensation Insurance Residual Scheme provides premium discounts for enterprises that have a good safety record.It provides incentive for RMAA contractors to actively participate in the Pilot Scheme.The Scheme demonstrates that by providing a safe working environment and appropriate personal protective equipment to workers,the enterprise not only helps to reduce the accident rate of the industry but also receive an economic return.The Pilot Scheme bridges stakeholders of RMAA industry,the government and the insurance industry creating an "all-win"situation.This partnership approach to prevent injuries and accidents in the construction industry could be an effective model for other industries.
文摘Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of engineering structure becomes more complex,large-scale and high-level projects with deep foundation have appeared in engineering construction.For construction engineering,one of its technologies includes solving the difficulties in construction.It is required to deal with the safety risk of construction in time to guarantee safety construction,timely solve the management difficulties and contradictory problems of the project and ensure both the safety of engineering construction and the rationalization of the institution setting of the safety supervision on the project.
文摘Construction industry is a generally risky business; it remains one of the most dirty, difficult and dangerous with poor working conditions. Despite recent efforts to improve site safety, it still accounts for a disproportionate number of occupational-related fatalities what is supported by statistics. According to the International Labour Organization, it accounts for 30-40% of the world's fatal injuries. In The European Union around thirteen employees out of every one hundred thousands are killed each year. Hence, construction site safety is a matter of global concern. However it is not easy to describe and define how to deport safely at some actual site because the workers are exposed to many safety risks varying in con^nection with conditions of the construction realization and with technologies using. The paper provides a brief knowledge from the study comparing the construction safety in Europe and North America referencing to presented statistics. There are also analyzed, described and systemized the principal groups of construction safety risks; described the interdependencies among safety risks, affecting by spatial, technological and time parameters of the building process, as well as by the site conditions.
基金funded by the National Natural Science Foundation of China(Grant No:71390524)
文摘The construction sites of mega construction projects(MCP) often have numerous participants with interfacing work within a highly complex system. It is critical how to realize collaborative work and information sharing among such participants. The information and communication technologies(ICTs) provides a technical guarantee for solving this problem. Existing research has been achieved the partial processes digitization of construction site, but certain problems still exist: 1)information perception of the construction site is passive.2) common collaboration and coordination problems in the construction industry have not been addressed. The emerging trends of ICTs have resulted in the integration of various computer technologies such as CPS, BIM, big data, and cloud computing into construction process,which would changes behavioral and management mode of construction sites. These new ICTs have been applied successfully in MCP, in particular, Hong Kong-ZhuhaiMacao Bridge project. A new management mode of construction sites is inspired by these case. In this paper, a new management mode of construction site for MCP has been proposed, namely, smart construction site. The ultimate goal of smart construction site is to accomplish safe, efficient and high-quality construction. This study put forward the conceptual framework for smart construction site, and have identified three key elements of smart construction site, including information support platform,collaboration work, and intelligent construction management. A case study on Hong Kong-Zhuhai-Macao Bridge project work as an evidence to support the practicability of the proposed mode. Significant contributions of this study is to propose a new management mode for MCP in construction industry, which would enrich the body of knowledge or the construction management community.Future research should be dedicated to further explore the potential of smart construction site in MCP management.
基金supported by two projects initialed China Geological Survey: “Evaluation on Soil and Water Quality and Geological Survey in Xiong’an New Area (DD20189122)” and “Monitoring and Evaluation on Carrying Capacity of Resource and Environment in BeijingTianjin-Hebei Coordinated Development Zone and Xiong’an New Area (DD20221727)”
文摘China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and to expedite the coordinated development of the Beijing-Tianjin-Hebei region.From 2017 to 2021,the China Geological Survey(CGS)took the lead in multi-factor urban geological surveys involving space,resources,environments,and disasters according to the general requirements of“global vision,international standards,distinctive Chinese features,and future-oriented goals”in Xiong’an New Area,identifying the engineering geologic conditions and geologic environmental challenges of this area.The achievements also include a 3D engineering geological structure model for the whole area,along with“one city proper and five clusters”,insights into the ecology and the background endowment of natural resources like land,geothermal resources,groundwater,and wetland of the area before engineering construction,a comprehensive monitoring network of resources and environments in the area,and the“Transparent Xiong’an”geological information platform that is open,shared,dynamically updated,and three-dimensionally visualized.China’s geologists and urban geology have played a significant role in the urban planning and construction of Xiong’an New Area,providing whole-process geological solutions for urban planning,construction,operation and management.The future urban construction of Xiong’an New Area will necessitate the theoretical and technical support of earth system science(ESS)from various aspects,and the purpose is to enhance the resilience of the new type of city and to provide support for the green,low-carbon,and sustainable development of this area.
基金A Project Supported by Scientific Research Fund of Hunan Provincial Education Department(06C309)
文摘The buildings construction safety problems contain various safety-hidden dangers that caused by the human unsafe behaviors, the substance unsafe conditions, operation environment unsafe factors and management defects. The authors summarize comprehensively the problems of buildings construetion safety in China at present based on grasping the whole safety status of buildings construction, and the synthetic countermeasures including the systems about laws, management, technology and education civilization for buildings construction safety management are brought up based on the viewpoint of safety system theory. Then it is thought that huilding scientific management mechanisms and popularizing effective management methods and measures are the fundamental ways for improving further the level of safety management for buildings construction in China at present.
文摘Despite the increasing dissemination of the Building Information Modeling(BIM)approach,many firms are still far from BIM and are only starting to adopt information technologies.We conducted an ethnographic action research with an industrial partner that implements information technologies on its construction sites,with a strong preference for home-made applications.Results show that the development of such applications faces difficulties and that multiple iterations and versions are necessary before achieving the expected goals because the required competencies are lacking among internal development teams.Moreover,initial needs evolve considerably throughout the application’s development and evaluation process.However,notwithstanding the difficulties encountered during the different application development phases,the industrial partner believes the decision to be worthwhile because of the desire to have internal control over the project data and the need to consider certain specificities related to business processes.
文摘The research focused on the analysis of construction and demolition debris in a sample Brazilian city with the objective to propose a management scheme tailored to private initiative intervention. The debris was found to be produced at a rate of 1.55 kg per person per day for a total of 5177 tons per month. The composition report showed 75% material reusable for construction purposes, 15% material recyclable through reverse logistics and 10% refuse to be disposed of at landfills. The study developed legal and managerial instruments that stimulate private operators to achieve landfill diversions in the order of 90% of this waste. The arguments were supported by a flow diagram that indicates the correct destination of all waste items and an economic balance of private waste movement. Proactive legal scriptures were sketched out that can assist the local administration in setting the timeframe for reaching the diversion target.
文摘With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.