Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c...Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cos...Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping ...Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as...To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.展开更多
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems...Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.展开更多
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst...Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.展开更多
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons...That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.展开更多
Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construct...Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.展开更多
in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the ...in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.展开更多
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, ...Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, and quality. The aim of this study is to analyze the affect of the long experience of the construction manager on project success; it aims to identify the capability skills that the construction manager should have to complete the project on time. The fmding of this study is to help in understanding the factors that influence the project success through the long experience of the construction manager.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect ...In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.展开更多
文摘Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
基金University-level self-study project:Construction cost control research of finished house based on BIM-5D(Project No.2023xzky06)。
文摘Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.
文摘Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.
文摘Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.
文摘That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.
文摘Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.
文摘in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, and quality. The aim of this study is to analyze the affect of the long experience of the construction manager on project success; it aims to identify the capability skills that the construction manager should have to complete the project on time. The fmding of this study is to help in understanding the factors that influence the project success through the long experience of the construction manager.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.