Application of Value Engineering in Construction Projects
1
作者 Senay Atabay and Niyazi Galipogullari 《Journal of Traffic and Transportation Engineering》 2013年第1期39-48,共10页
The current economic conditions have entailed the use of rational method and techniques and research and application of new techniques by utilizing advancements in technology in the field of production as well as in e... The current economic conditions have entailed the use of rational method and techniques and research and application of new techniques by utilizing advancements in technology in the field of production as well as in every field. Excess cost control requires to be maintained throughout the project life of building beginning from the initial stages of design. Scrutinizing the project well and considering all possible alternatives particularly in design stage are important for achieving optimum cost. In this study, how the principles of VE (value engineering) are applied in construction projects is explained, and by covering Bregana-Zagreb-Dubrovnik Motorway construction in Croatia by BECHTEL -ENKA joint venture as the sample project, practices of VE in this project are described. The satisfactory results of time and cost saving are achieved by applying value engineering principles through the VE team during the project preparation phase and project revision phase. Approximately 43,000,0005 and 12 months of time were saved in total thanks to all these VE works. This saving provided builder company with 6% financial saving and 17% work time reduction. 展开更多
关键词 value engineering value management motorway construction.
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
2
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
3
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 construction safety Mechanical and electrical installation Installation engineering engineering projects Safety management
下载PDF
Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
4
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 THREE-DIMENSIONAL VISUALIZATION VIRTUAL REALITY engineering construction project Management
下载PDF
Analysis of Construction Duration and Cost for Public Sector Civil Engineering Projects in Libya
5
作者 Tgarid Ali Xiaohui Zhong Utpal Dutta 《Journal of Civil Engineering and Architecture》 2018年第12期838-847,共10页
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst... Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice. 展开更多
关键词 PUBLIC projectS CIVIL engineering projectS actual construction DURATION actual construction COST
下载PDF
Research on Delay Risks of EPC Hydropower Construction Projects in Vietnam 被引量:1
6
作者 Mai Sy Hung Jianqiong Wang 《Journal of Power and Energy Engineering》 2016年第4期9-16,共8页
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy... In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors. 展开更多
关键词 engineering Procurement and construction (EPC) Risk Research EPC Hydropower project construction projects
下载PDF
Construction Project Forecasting "Practical Use of EV Metrics"
7
作者 Reda Abbas Sabry 《Management Studies》 2014年第3期168-178,共11页
During this professional research--Construction Project Forecasting (Practical Use of EV Metrics), which criticize earned value management as a most distinguished methodology for forecasting the project expected end... During this professional research--Construction Project Forecasting (Practical Use of EV Metrics), which criticize earned value management as a most distinguished methodology for forecasting the project expected end dates and expecting budget at completion, the field for the research is construction field and specially the projects which content different phases without repetitive tasks. Forecasting for construction project is a complicated process need more than applying one equation only. As assuming that, project performance during finishing stage will be similar to project performance during concrete stage is totally wrong. The case study techniques have been used to prove an important idea and also to implement a suggested protocol which actually implemented and tested and it should be considered as a research finding. The project used in this case study is "Hurgadah Intemational Airport--New Terminal Building", while executing this complex construction projects with different stages the forecasting for the project end date and final end budget were completely not realistic. The above leads to questioning the next: "Is it true that using the earned value indexes for forecasting construction projects end date and final budget is the right way? And if not, what is the right process that should be used in order to reach acceptable forecasting method?" We implement the EV measurements by the normal technique and also implement in the same month the suggested protocol for forecasting, comparing the results proof the effectiveness of the suggested protocol. The findings prove that, the construction projects need special treatment when use the EVM for forecasting. The earned value indexes created to serve the projects which have repeated tasks or can say which got one stage only, like information technology (IT) projects as those projects depending on manpower productivity and also based on few different qualifications. On such type of projects the earned value forecasting calculation is perfectly used. 展开更多
关键词 Keywords: Earned value (EV) construction projects progress forecasting variance analysis EXPECTED FINISH date budget at COMPILATION
下载PDF
Thinking substation construction project management methods
8
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
Current Situation and Prevention of Soil Erosion from Construction of West-East Natural Gas Transmission (Ningxia-Shaanxi Section) 被引量:1
9
作者 李永红 高照良 周茂玲 《Agricultural Science & Technology》 CAS 2012年第6期1320-1327,共8页
In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore prin... In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures. 展开更多
关键词 West-East Natural Gas Transmission Pipeline project engineering construction Impact on environment Soil erosion
下载PDF
Achievements of Capital Construction of Onshore Petroleum Industry
10
作者 Jia Jinhui (Director,Capital Construction Bureau,CNPC) 《China Oil & Gas》 CAS 1994年第4期9-11,共3页
For meeting the development of petroleum in-dustry,the petroleum capital construction battalion is being introducing and developing domestic and foreign advanced technologies,and speeds up to re-construct and form a c... For meeting the development of petroleum in-dustry,the petroleum capital construction battalion is being introducing and developing domestic and foreign advanced technologies,and speeds up to re-construct and form a complete set of surface project for high water content stage oilfield and to tackle technical problems of surface process and equipment for polymer-injecting tertiary recovery,surface pro-ject construction for special type oil and gas reser-voirs,oil and gas-field project construction in spe-cial areas of desert and shallow sea,and design and construction of extra-long-distance large-bore oil and gas conveying pipeline.We firmly believe that the petroleum capital construction battalion will stride a new step and attain greater achievement in surface project construction of domestic and over-seas oil and gas-fields. 展开更多
关键词 LAND Oil industry construction engineering project World wide MARKETING
下载PDF
Complete fuzzy scheduling and fuzzy earned value management in construction projects 被引量:9
11
作者 José Luís PONZ-TIENDA Eugenio PELLICER Víctor YEPES 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第1期56-68,共13页
This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we... This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project. 展开更多
关键词 construction Earned value method(EVM) Fuzzy logic Fuzzy set project management SCHEDULING
原文传递
Construction engineering management culture shift: Is the lowest tender offer dead? 被引量:2
12
作者 Eric SCHEEPBOUWER Douglas D.GRANSBERG Carla Lopez del PUERTO 《Frontiers of Engineering Management》 2017年第1期49-57,共9页
The procurement of public construction projects must walk a fine line between the corruption of state officials and collusion of contractors. The method of awarding projects to the lowest responsible tenderer was orig... The procurement of public construction projects must walk a fine line between the corruption of state officials and collusion of contractors. The method of awarding projects to the lowest responsible tenderer was originally implemented to guard against corruption of state officials. However, an investigation of the construction industry in the Canadian province of Quebec showed that lowest-tender-offer procurement gave rise to collusion of companies tendering for the contracts. Alternatively, bestvalue procurement has been used for decades, but here problems arise owing to the necessity of subjective judging of measures other than price to compare bids, giving rise to time-and money-consuming protests. The paper proposes a compelling argument that the construction engineering management(CEM) culture should refocus its efforts on enhancing project cost certainty rather than merely searching for means to design a project in a manner that produces the lowest initial cost, and awards the construction to the lowest tender offer that focuses on cost savings during the project development and delivery process. The difference in the two approaches is subtle but extremely important. To make the transition, the engineering management tools must be advanced to the next level.This means that all project control tools for managing cost,schedule, and technical scope must be transformed from working in the deterministic mode to the stochastic mode,thus making the probability of completing the projectwithin or below its official budget the primary decision criterion. To do so, CEMs must accept that there is a benefit in paying more for an alternative that increases cost certainty for the entire project. The authors of this paper hope that it will provide the grist for a more general dialog across all industry sectors where engineering management is practiced. 展开更多
关键词 cost certainty lowest responsible bid best value public procurement construction engineering management culture
原文传递
Modeling the effect of a freeway road construction project on link-level travel times 被引量:1
13
作者 Venu Madhav Kukkapalli Srinivas S.Pulugurtha 《Journal of Traffic and Transportation Engineering(English Edition)》 CSCD 2021年第2期267-281,共15页
Drivers experience variations in travel time due to congestion and delays associated with road construction projects on existing transportation facilities. The effect on the travel time of a link decreases as its dist... Drivers experience variations in travel time due to congestion and delays associated with road construction projects on existing transportation facilities. The effect on the travel time of a link decreases as its distance from the road construction project increases. In addition, the effect could extend to the connecting arterial street links within the vicinity of the road construction project. Therefore, the focus of this research is to model the effect of a road construction project on the freeway and connecting arterial street link-level travel times. Data pertaining to a resurfacing construction project, which lasted for six months,was gathered from the traffic incident management systems(TIMS). The travel time data was collected and processed, for each selected freeway and connecting arterial street link,for six months before the start of the resurfacing construction project and six months during the construction of the resurfacing project. Generalized linear models(GLM) were developed and validated for before and during the construction project periods with the average travel time on a link as the dependent variable. Data such as time-of-the-day, dayof-the-week, the distance of a link from the work zone, subject link characteristics, and upstream and downstream link characteristics were collected and used as the predictor variables. The results indicate that the subject link, upstream link and downstream link characteristics have a significant effect on the freeway and connecting arterial street linklevel travel times due to the resurfacing construction project. 展开更多
关键词 Traffic engineering Travel time Road construction project FREEWAY Generalized linear model
原文传递
基于ESG理念的重大工程弃渣造地项目选址价值评价
14
作者 李玉龙 韩岩坤 苏涵 《工程管理学报》 2024年第1期106-111,共6页
为了强化弃渣造地项目选址的可持续性,本文引入了ESG理念作为决策依据,构建了集成ESG理念的重大工程弃渣造地项目选址价值工程框架,并提出了适用于评价西部复杂艰险地区重大工程弃渣选址造地的ESG功能评价指标体系。在此基础上,结合AHP... 为了强化弃渣造地项目选址的可持续性,本文引入了ESG理念作为决策依据,构建了集成ESG理念的重大工程弃渣造地项目选址价值工程框架,并提出了适用于评价西部复杂艰险地区重大工程弃渣选址造地的ESG功能评价指标体系。在此基础上,结合AHP方法给出了确定ESG项下各分量指标的权重及价值工程实施的具体操作步骤,并通过一个具体案例进行操作说明。ESG理念的引入及所构建的功能评价指标体系和弃渣选址造地的价值工程分析方法,有助于提升我国重大工程弃渣处置的可持续能力,助推重大工程弃渣选址造地的科学化和重大工程ESG理念的实现。 展开更多
关键词 重大工程 弃渣 造地选址 ESG评价 价值工程
下载PDF
大型工程项目品质工程建设场景中的微创新研究
15
作者 喻登科 吴文君 +1 位作者 费伦林 徐笑笑 《科技进步与对策》 北大核心 2024年第6期21-29,共9页
品质工程建设是工程经济高质量发展的重要内容。作为品质工程建设的抓手,微创新在大型工程项目建设场景中受到越来越多的关注。大广高速南康至龙南段扩容工程采用微创新在品质工程建设方面取得显著成效,以其为案例,通过访谈与调研获得... 品质工程建设是工程经济高质量发展的重要内容。作为品质工程建设的抓手,微创新在大型工程项目建设场景中受到越来越多的关注。大广高速南康至龙南段扩容工程采用微创新在品质工程建设方面取得显著成效,以其为案例,通过访谈与调研获得一手数据,在场景驱动创新理论视角下探索大型工程项目品质工程建设场景中的微创新要素、内容和策略。结果发现:①大型工程项目品质工程建设场景要素包括战略、需求愿景、参与主体、市场、技术、资源和环境;②在场景驱动下,围绕品质目标的微创新活动内容包括设计理念微创新、工程技术、方法与信息化微创新以及管理制度微创新;③促进微创新的关键策略为沿着微创新活动作好顶层设计、班组管理与工程品质考核验收。研究结论有助于丰富大型工程项目品质工程建设场景驱动微创新理论研究,并为我国大型工程项目品质提升提供参考借鉴。 展开更多
关键词 大型工程项目 品质工程建设 微创新 案例研究 场景驱动创新
下载PDF
智能建管平台下工程总承包项目信息共享激励研究
16
作者 丁继勇 孙梦 《科技管理研究》 2024年第6期166-176,共11页
信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进... 信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进行有效的数字化管控的智能建管平台的应用可以有效改善EPC项目中信息不对称现象。但是工程实践中存在总承包商信息共享积极性不高的问题。针对这一问题,以业主方主导构建的智能建管平台为特定情境,运用演化博弈理论构建业主方和总承包商之间的博弈模型,分析双方在信息共享激励过程中的策略选择并进行仿真研究,以探讨不同参数对总承包商信息共享行为的影响,以及影响双方策略选择的关键因素。结果发现:业主方的额外收益越大、激励成本越低,其更倾向于采取激励策略;总承包商积极信息共享的潜在收益越大、消极信息共享的机会收益越小,其更倾向于采取积极信息共享策略;总承包商的智能建管平台应用成熟度和对总承包商的补贴对双方的策略都有显著影响。基于此,提出业主方应从物质激励和声誉激励相结合、基于智能建管平台应用的不同时期及时调整激励策略和辅以适当惩罚机制3个维度来制定激励策略,以促进总承包商积极共享信息。 展开更多
关键词 智能建管平台 工程总承包项目 信息共享 演化博弈 工程项目管理
下载PDF
聚丙烯纤维再生混凝土在建筑工程中的应用
17
作者 梁婷 《塑料助剂》 CAS 2024年第2期32-34,38,共4页
通过添加聚丙烯纤维可以改善再生混凝土的力学性能及耐久性,使得再生混凝土的经济效益、便捷性等优势在建筑工程中广泛应用。对于解决建筑垃圾、优化环境具有重要价值,成为高性价比的建筑材料。
关键词 聚丙烯 再生混凝土 建筑工程
下载PDF
海洋石油工程项目建设成本管理思路
18
作者 单晓亮 《化工管理》 2024年第16期12-14,共3页
海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建... 海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建设风险。文章结合海洋石油工程项目管理中加强成本管理的价值意义分析出发,对当前成本管理工作开展中的现状及实施路径进行了综合探究,着重从成本管理构架、成本预算管理、成本控制要点、成本核算分析、成本考核等方面阐述,以期提升中国海上工程项目建设国际市场竞争力。 展开更多
关键词 海洋石油 工程项目 施工成本 成本控制 预算管理
下载PDF
基于数字孪生的建设工程项目管理数字化 被引量:1
19
作者 宫志群 王永志 廖少明 《土木工程学报》 EI CSCD 北大核心 2024年第7期106-128,共23页
我国大型建设项目具有规模大、工序复杂交叉、信息碎片化、劳动力短缺等问题,对传统项目管理方式形成了挑战,项目管理数字化需求十分迫切,其中数字孪生是当前实现项目管理数字化的重要手段。通过研究数字孪生的内涵、孪生映射以及数字... 我国大型建设项目具有规模大、工序复杂交叉、信息碎片化、劳动力短缺等问题,对传统项目管理方式形成了挑战,项目管理数字化需求十分迫切,其中数字孪生是当前实现项目管理数字化的重要手段。通过研究数字孪生的内涵、孪生映射以及数字孪生成熟度评价,并结合南通绕城高速公路项目的应用实践,总结并提出基于数字孪生的建设项目管理数字化转型的实现路径、技术手段及建议。主要结论如下:(1)基于数字孪生内涵,构建了建设项目管理的数字孪生模型及考虑生命周期、模型映射、功能和数据完备性的四维度数字孪生成熟度评价模型。(2)采用BIM、GIS、UAV和IoT技术集成,在BIM“一模到底”理念下构建以BIM为数据载体的高速公路项目的数字孪生模型,实现孪生体虚实精准映射。(3)基于数字孪生的工程项目管理数字化具有提升组织管理能力、管理效益提升、提升工程质量、项目数字资产价值再生等意义。(4)为切实推动建设项目管理数字化,需根据项目特点,着力解决项目结合、理念转变、组织保障和技术支撑等问题。 展开更多
关键词 建设项目管理 数字孪生 数字化 建筑信息模型
下载PDF
地方高校化工专业绿色工程课程建设研究
20
作者 肖慧芳 彭雪莹 +5 位作者 张田田 李梅生 马奎蓉 贾明民 毛恒洋 周守勇 《云南化工》 CAS 2024年第3期183-186,共4页
在“双碳”目标下,绿色工程的实践与发展持续推进,而各大高校是推动绿色工程建设的“主力军”。调查了国内86所高校化工专业绿色工程课程设置现状,发现大部分高校的绿色化学的设置率仅有16.3%。提出了开展任务驱动教学、明确培养目标,... 在“双碳”目标下,绿色工程的实践与发展持续推进,而各大高校是推动绿色工程建设的“主力军”。调查了国内86所高校化工专业绿色工程课程设置现状,发现大部分高校的绿色化学的设置率仅有16.3%。提出了开展任务驱动教学、明确培养目标,有针对性地开设绿色理念课程,并根据区域特色和产业需求,构建符合特色绿色工程课程体系的方法。政府、地方高校、企业等多方参与推进绿色工程课程建设。政府提供法律保障和政策支持。企业响应国家政策,协同高校制定课程改革方案,培养绿色工程人才。 展开更多
关键词 课程建设 绿色工程 化工专业 地方高校
下载PDF