期刊文献+
共找到29篇文章
< 1 2 >
每页显示 20 50 100
Review of Power Supply and Distribution Construction Technology for Highway Electromechanical Engineering
1
作者 Li Liu 《Journal of Electronic Research and Application》 2024年第2期27-32,共6页
In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan... In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology. 展开更多
关键词 HIGHWAY Mechanical and electrical engineering power supply and distribution construction technology Construction process
下载PDF
Multi-Criteria Decision-Making for Power Grid Construction Project Investment Ranking Based on the Prospect Theory Improved by Rewarding Good and Punishing Bad Linear Transformation
2
作者 Shun Ma Na Yu +3 位作者 Xiuna Wang Shiyan Mei Mingrui Zhao Xiaoyu Han 《Energy Engineering》 EI 2023年第10期2369-2392,共24页
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint... Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided. 展开更多
关键词 power grid construction project investment ranking RGPBIT operator MCDM optimal weight
下载PDF
Constructing Large Capacity Power Plant on Collapsible Loess Stratum with Huge Thickness
3
作者 Huang Tianshi, Liu Houjian Northwest Electric Power Design Institute (NWEPDI) 《Electricity》 1996年第4期39-41,共3页
1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to severa... 1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to several hundred meters along the river’s terraces to those geomorphologic plateaus. In geology, "China Loess" has become a geologic term, because the loess in China has evolved with the widest distribution and greatest thickness in the world, and is also a typical and significant deposit in Quaternary Period. 展开更多
关键词 THAN MORE In TEST Constructing Large Capacity power Plant on Collapsible Loess Stratum with Huge Thickness
下载PDF
Power Construction Enterprises in Northwest China
4
《Electricity》 1997年第1期14-19,共6页
关键词 MVA power Construction Enterprises in Northwest China
下载PDF
Target for Power Construction in 9th Five-year Plan Period Set-up
5
《Electricity》 1996年第4期19-19,共1页
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
关键词 In Target for power Construction in 9th Five-year Plan Period Set-up
下载PDF
Hainan Changjiang nuclear power project construction started
6
作者 Liu Chunsheng 《Electricity》 2010年第2期7-,共1页
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
关键词 Hainan Changjiang nuclear power project construction started WILL
下载PDF
Equipment delivery and quality problems affectingcompletion of 1997 Power Construction Plan
7
《Electricity》 1998年第2期43-44,共2页
关键词 Equipment delivery and quality problems affecting completion of 1997 power Construction Plan
下载PDF
The Application of Principle of Automatic Control in the site Management of Electric Power Construction Enterprise
8
作者 Bowen Wang 《Journal of Electronic Research and Application》 2020年第3期20-23,共4页
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime... It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction. 展开更多
关键词 Principle of automatic control Electric power construction CONSTRUCTION Site management
下载PDF
Experience of Supervision over Fossil-fired Power Plant Construction Project
9
《Electricity》 1999年第1期49-52,共4页
关键词 Experience of Supervision over Fossil-fired power Plant Construction Project OVER
下载PDF
Some Technical Proposals on Rural Power Grid Construction and Retrofit
10
作者 Dong Zhenya Liu Fuyi(Beijing Power Supply Bureau) 《Electricity》 1999年第3期32-35,共4页
In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on ... In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward. 展开更多
关键词 GRID Some Technical Proposals on Rural power Grid Construction and Retrofit
下载PDF
The construction of Zhangzhou Houshi Power Plant ofFujian Province is in full swing
11
《Electricity》 1998年第2期48-48,共1页
关键词 The construction of Zhangzhou Houshi power Plant of Fujian Province is in full swing
下载PDF
Hanfeng Coal-fired Power Project start to construct
12
《Electricity》 1997年第1期49-49,共1页
关键词 PROJECT Hanfeng Coal-fired power Project start to construct
下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
13
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of power Plant
下载PDF
CONSTRUCTION OF GUIZHOU PANXINA THERMAL POWER PLANT PHASE Ⅱ SPEED UP TO PROMOTE THE COURSE "SENDING POWER FROM WEST TO EAST
14
《Electricity》 2000年第3期49-49,共1页
关键词 SENDING power FROM WEST TO EAST CONSTRUCTION OF GUIZHOU PANXINA THERMAL power PLANT PHASE SPEED UP TO PROMOTE THE COURSE
下载PDF
State Key Power Construction Projects in 1999 Issued from the State Development Planning Commission
15
《Electricity》 1999年第3期35-35,共1页
关键词 State Key power Construction Projects in 1999 Issued from the State Development Planning Commission
下载PDF
Construction of Houshi Power Plant (6×600 MW)
16
《Electricity》 1999年第4期7-13,共7页
关键词 Construction of Houshi power Plant
下载PDF
Geotechnical Engineering Plays an Important Role in Power Plant Construction
17
《Electricity》 1999年第1期36-38,共3页
关键词 Geotechnical Engineering Plays an Important Role in power Plant Construction In
下载PDF
Renewable energy power generation projects started construction in Tibet
18
作者 Liu Chunsheng 《Electricity》 2010年第2期6-,共1页
On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.
关键词 Renewable energy power generation projects started construction in Tibet
下载PDF
Interconnection Project of Fujian Power Grid With East China Power Network Formally Started to Construct
19
《Electricity》 2000年第2期55-55,共1页
关键词 Project Interconnection Project of Fujian power Grid With East China power Network Formally Started to Construct
下载PDF
Construction of Ling'ao Nuclear Power Plant proceeds as scheduled
20
《Electricity》 1997年第2期22-22,共1页
关键词 Construction of Ling’ao Nuclear power Plant proceeds as scheduled
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部