期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
HYBRID CONTROL APPROACH FOR CONTAINER CRANES 被引量:4
1
作者 Wang Xiaojun Shao Huihe 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2005年第3期351-355,共5页
A hybrid control approach is proposed to achieve the desired performance. Firstly a robust input shaper is designed to reduce the transient vibration and residual vibration of the container efficiently. Then a simple ... A hybrid control approach is proposed to achieve the desired performance. Firstly a robust input shaper is designed to reduce the transient vibration and residual vibration of the container efficiently. Then a simple fuzzy logic controller is designed to eliminate the residual vibration completely in order to guarantee the positioning precision. Such a hybrid approach is simple in structure and readily realizable. Simulation results verify the fine performance of this hybrid control approach. It can achieve perfect elimination of residual vibration and concise positioning of the container load, and it is robust to parameter variations (mainly for cable length) and external disturbances. 展开更多
关键词 Input shaping Fuzzy logic control container crane Vibration
下载PDF
Seismic elastic-plastic time history analysis and reliability study of quayside container crane 被引量:1
2
作者 Yulong Jin Zengguang Li 《Earthquake Science》 CSCD 2010年第3期265-274,共10页
Quayside container crane is a kind of huge dimension steel structure,which is the major equipment used for handling container at modern ports.With the aim to validate the safety and reliability of the crane under seis... Quayside container crane is a kind of huge dimension steel structure,which is the major equipment used for handling container at modern ports.With the aim to validate the safety and reliability of the crane under seismic loads,besides conventional analysis,elastic-plastic time history analysis under rare seismic intensity is carried out.An ideal finite element(FEM) elastic-plastic mechanical model of the quayside container crane is presented by using ANSYS codes.Furthermore,according to elastic-plastic time history analysis theory,deformation,stress and damage pattern of the structure under rare seismic intensity are investigated.Based on the above analysis,the established reliability model according to the reliability theory,together with seismic reliability analysis based on Monte-Carlo simulation is applied to practical analysis.The results show that the overall structure of the quayside container crane is generally unstable under rare seismic intensity,and the structure needs to be reinforced. 展开更多
关键词 quayside container crane elastic-plastic time history analysis seismic reliability elastic-plastic beam element earthquake action
下载PDF
AN ANT COLONY ALGORITHM FOR YARD TRUCK SCHEDULING AND YARD LOCATION ASSIGNMENT PROBLEMS WITH PRECEDENCE CONSTRAINTS 被引量:8
3
作者 Zhaojie XUE Canrong ZHANG +1 位作者 Lixin MIAO Wei-Hua LIN 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2013年第1期21-37,共17页
This paper examines the yard truck scheduling,the yard location assignment for discharging containers,and the quay crane scheduling in container terminals.Taking into account the practical situation,we paid special at... This paper examines the yard truck scheduling,the yard location assignment for discharging containers,and the quay crane scheduling in container terminals.Taking into account the practical situation,we paid special attention to the loading and discharging precedence relationships between containers in the quay crane operations.A Mixed Integer Program(MIP) model is constructed,and a two-stage heuristic algorithm is proposed.In the first stage an Ant Colony Optimization(ACO) algorithm is employed to generate the yard location assignment for discharging containers.In the second stage,the integration of the yard truck scheduling and the quay crane scheduling is a flexible job shop problem,and an efficient greedy algorithm and a local search algorithm are proposed. Extensive numerical experiments are conducted to test the performance of the proposed algorithms. 展开更多
关键词 container terminal yard truck scheduling yard location assignment quay crane scheduling precedence constraints ant colony optimization
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部