New lumped-mass-stick model based on modal characteristics of structures: development and application to a nuclear containment building 被引量:8
1
作者 Hwasung Roh Huseok Lee Jong Seh Lee 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2013年第2期307-317,共11页
In this study, a new lumped-mass-stick model (LMSM) is developed based on the modal characteristics of a structure such as eigenvalues and eigenvectors. The simplified model, named the "frequency adaptive lumped-ma... In this study, a new lumped-mass-stick model (LMSM) is developed based on the modal characteristics of a structure such as eigenvalues and eigenvectors. The simplified model, named the "frequency adaptive lumped-massstick model," hasonly a small number of stick elements and nodes to provide the same natural frequencies of the structure and is applied to a nuclear containment building. To investigate the numerical performance of the LMSM, a time history analysis is carried out on both the LMSM and the finite element model (FEM) for a nuclear containment building. A comparison of the results shows that the dynamic responses of the LMSM in terms of displacement and acceleration are almost identical to those of the FEM. In addition, the results in terms of floor response spectra at certain elevations are also in good agreement. 展开更多
关键词 new lumped-mass-stick model frequency adaptive nuclear containment buildings seismic response floor response spectrum
下载PDF
Evaluation of protective quality of prestressed concrete containment buildings of nuclear power plants
2
作者 郑砚国 李惠强 《Journal of Central South University》 SCIE EI CAS 2011年第1期238-243,共6页
The permeability and sorptivity properties of the two prestressed concrete containment buildings (PCCBs) of a nuclear power plant in South China, which had been under operation for 5 years, were measured by using th... The permeability and sorptivity properties of the two prestressed concrete containment buildings (PCCBs) of a nuclear power plant in South China, which had been under operation for 5 years, were measured by using the autoclam permeability system. The air permeability, sorptivity and water permeability indexes of No.1 PCCB are smaller than or equal to 0.11 ln(102 Pa)/min, 0.98×10 ^7 m3/minl/2 and 1.93×10 ^7 m3/min1/2, respectively, and the air permeability, sorptivity and water permeability indexes of No.2 PCCB are smaller than or equal to 0.17 In(102 Pa)/min, 1.6×10 ^7 m3/min1/2 and 4.43 ×10 ^7 m3/min1/2, respectively. Based on the criteria for evaluating the protective quality of concrete structures in terms of their permeability and sorptivity properties, proposed by the research organization of the autoclam permeability system, the protective quality of No. 1 PCCB is still in very good grade and that of No.2 PCCB is not in very good grade but in good grade, and the in-service inspection of the protective quality of No.2 PCCB should be strengthened in the future. 展开更多
关键词 nuclear power plant prestressed concrete containment building permeability properties sorptivity properties
下载PDF
Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process 被引量:6
3
作者 Dae-Woong Shin Yoonseok Shin Gwang-Hee Kim 《Journal of Building Construction and Planning Research》 2016年第3期157-171,共15页
Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually sin... Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects. 展开更多
关键词 COMPONENT Analytic Hierarchy Process (AHP) Fuzzy Analytic Hierarchy Process (FAHP) Nuclear Power Plant Reactor containment building (RCB) Risk Assessment