In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
Avoiding excessive enrollment of a single cohort in a clinical trial is prudent in order to avoid imbalances and to prevent one cohort from having a disproportionate influence on the results of a trial and perhaps eve...Avoiding excessive enrollment of a single cohort in a clinical trial is prudent in order to avoid imbalances and to prevent one cohort from having a disproportionate influence on the results of a trial and perhaps even negating positive findings of the clinical trial. Numerical criteria are provided here to evaluate the expected influence of a large cohort as a function of both its size and the relative effect of interventions, in comparison to those of other groups. Measures of expected influence are obtained as a function of the parameters of the distribution of statistics measuring influence. Calculated numerical criteria for the binomial, continuous and time-to-event contexts are presented. Details of the application of this method and sensitivity analyses conducted during the planning stages of a multiple myeloma clinical trial are provided. Numerical criteria are derived under asymptotic conditions and thus results hold for large cohorts. The numerical criteria are easy to compute and are useful tools to assess possible detrimental effects of large cohorts during the design of a study or during enrollment prior to any un-blinding. The numerical criteria allow for a-priori sensitivity analyses of the likely influence of large cohorts under varying conditions.展开更多
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
文摘Avoiding excessive enrollment of a single cohort in a clinical trial is prudent in order to avoid imbalances and to prevent one cohort from having a disproportionate influence on the results of a trial and perhaps even negating positive findings of the clinical trial. Numerical criteria are provided here to evaluate the expected influence of a large cohort as a function of both its size and the relative effect of interventions, in comparison to those of other groups. Measures of expected influence are obtained as a function of the parameters of the distribution of statistics measuring influence. Calculated numerical criteria for the binomial, continuous and time-to-event contexts are presented. Details of the application of this method and sensitivity analyses conducted during the planning stages of a multiple myeloma clinical trial are provided. Numerical criteria are derived under asymptotic conditions and thus results hold for large cohorts. The numerical criteria are easy to compute and are useful tools to assess possible detrimental effects of large cohorts during the design of a study or during enrollment prior to any un-blinding. The numerical criteria allow for a-priori sensitivity analyses of the likely influence of large cohorts under varying conditions.