期刊文献+
共找到3,248篇文章
< 1 2 163 >
每页显示 20 50 100
Hybrid Continuous-Time MILP Model for Crude Oil Scheduling under the Influence of High Tides
1
作者 Zhou Zhiju Zhou Xiang Zhou Han 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2021年第3期76-89,共14页
Vessels,especially very large or ultra large crude carriers(VLCCs or ULCCs),often can only dock and leave the berth during high tide periods to prevent being stranded.Unfortunately,the current crude scheduling models ... Vessels,especially very large or ultra large crude carriers(VLCCs or ULCCs),often can only dock and leave the berth during high tide periods to prevent being stranded.Unfortunately,the current crude scheduling models do not take into account tidal conditions,which will seriously affect the feasibility of crude schedule.So we first focus on the docking and leaving operations under the tidal actions,and establish a new hybrid continuous-time mixed integer linear programming(MILP)model which incorporates global event based formulation and unit-specific event based formulation.Upon considering that the multiple blending of crude oil can easily cause the production fluctuating,there are some reasonable assumptions that storage tanks can only store pure crude,and charging tanks just can be refilled after being emptied,which helps us obtain a simple MILP model without composition discrepancy caused by crude blending.Two cases are used to demonstrate the efficacy of proposed scheduling model.The results show that the optimization schedule can minimize the demurrage of the vessels and the number of feeding changeovers of crude oil distillation units(CDUs). 展开更多
关键词 crude scheduling TIDE continuous-time representation mixed integer linear programming
下载PDF
A Novel Predictive Model for Edge Computing Resource Scheduling Based on Deep Neural Network
2
作者 Ming Gao Weiwei Cai +3 位作者 Yizhang Jiang Wenjun Hu Jian Yao Pengjiang Qian 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第4期259-277,共19页
Currently,applications accessing remote computing resources through cloud data centers is the main mode of operation,but this mode of operation greatly increases communication latency and reduces overall quality of se... Currently,applications accessing remote computing resources through cloud data centers is the main mode of operation,but this mode of operation greatly increases communication latency and reduces overall quality of service(QoS)and quality of experience(QoE).Edge computing technology extends cloud service functionality to the edge of the mobile network,closer to the task execution end,and can effectivelymitigate the communication latency problem.However,the massive and heterogeneous nature of servers in edge computing systems brings new challenges to task scheduling and resource management,and the booming development of artificial neural networks provides us withmore powerfulmethods to alleviate this limitation.Therefore,in this paper,we proposed a time series forecasting model incorporating Conv1D,LSTM and GRU for edge computing device resource scheduling,trained and tested the forecasting model using a small self-built dataset,and achieved competitive experimental results. 展开更多
关键词 Edge computing resource scheduling predictive models
下载PDF
Multi-Time Scale Optimal Scheduling of a Photovoltaic Energy Storage Building System Based on Model Predictive Control
3
作者 Ximin Cao Xinglong Chen +2 位作者 He Huang Yanchi Zhang Qifan Huang 《Energy Engineering》 EI 2024年第4期1067-1089,共23页
Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a ... Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance. 展开更多
关键词 Load optimization model predictive control multi-time scale optimal scheduling photovoltaic consumption photovoltaic energy storage building
下载PDF
A continuous-time formulation for refinery production scheduling problems involving operational transitions in mode switching
4
作者 Lei Shi Yongheng Jiang +1 位作者 Ling Wang Dexian Huang 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2016年第8期1020-1031,共12页
In the refinery scheduling, operational transitions in mode switching are of great significance to formulate dynamic nature of production and obtain efficient schedules. The discrete-time formulation meets two main ch... In the refinery scheduling, operational transitions in mode switching are of great significance to formulate dynamic nature of production and obtain efficient schedules. The discrete-time formulation meets two main challenges in modeling: discrete approximation of time and large size of mixed-integer linear problem(MILP).In this article, a continuous-time refinery scheduling model, which involves transitions of mode switching, is presented due to these challenges. To reduce the difficulty in solving large scale MILPs resulting from the sequencing constraints, the global event-based formulation is chosen. Both transition constraints and production transitions are introduced and the numbers of key variables and constraints in both of the discrete-time and continuous-time formulations are analyzed and compared. Three cases with different lengths of time horizons and different numbers of orders are studied to show the efficiency of the proposed model. 展开更多
关键词 REFINERY scheduling OPERATIONAL TRANSITIONS continuous-time REPRESENTATION
下载PDF
Modeling and performance evaluation of QoS-aware job scheduling of computational grids
5
作者 单志广 林闯 《Journal of Southeast University(English Edition)》 EI CAS 2007年第3期425-430,共6页
To achieve high quality of service (QoS) on computational grids, the QoS-aware job scheduling is investigated for a hierarchical decentralized grid architecture that consists of multilevel schedulers. An integrated ... To achieve high quality of service (QoS) on computational grids, the QoS-aware job scheduling is investigated for a hierarchical decentralized grid architecture that consists of multilevel schedulers. An integrated QoS-aware job dispatching policy is proposed, which correlates priorities of incoming jobs used for job selecting at the local scheduler of the grid node with the job dispatching policies at the global scheduler for computational grids. The stochastic high-level Petri net (SHLPN) model of a two-level hierarchy computational grid architecture is presented, and a model refinement is made to reduce the complexity of the model solution. A performance analysis technique based on the SHLPN is proposed to investigate the QoS-aware job scheduling policy. Numerical results show that the QoS-aware job dispatching policy outperforms the QoS-unaware job dispatching policy in balancing the high-priority jobs, and thus enables priority-based QoS. 展开更多
关键词 computational grids job scheduling quality of service (QoS) performance evaluation modelING stochastic high-level Petri net (SHLPN)
下载PDF
Saline Water Irrigation Scheduling Through a Crop-Water-Salinity Production Function and a Soil-Water-Salinity Dynamic Model 被引量:16
6
作者 WANG Yang-Ren KANG Shao-Zhong +2 位作者 LI Fu-Sheng ZHANG Lu ZHANG Jian-Hua 《Pedosphere》 SCIE CAS CSCD 2007年第3期303-317,共15页
Using a crop-water-salinity production function and a soil-water-salinity dynamic model, optimal irrigation scheduling was developed to maximize net return per irrigated area. Plot and field experiments were used to o... Using a crop-water-salinity production function and a soil-water-salinity dynamic model, optimal irrigation scheduling was developed to maximize net return per irrigated area. Plot and field experiments were used to obtain the crop water sensitivity index, the salinity sensitivity index, and other parameters. Using data collected during 35 years to calculate the 10-day mean precipitation and evaporation, the variation in soil salinity concentrations and in the yields of winter wheat and cotton were simulated for 49 irrigation scheduling that were combined from 7 irrigation schemes over 3 irrigation dates and 7 salinity concentrations of saline irrigation water (fresh water and 6 levels of saline water). Comparison of predicted results with irrigation data obtained from a large area of the field showed that the model was valid and reliable. Based on the analysis of the investment cost of the irrigation that employed deep tube wells or shallow tube wells, a saline water irrigation schedule and a corresponding strategy for groundwater development and utilization were proposed. For wheat or cotton, if the salinity concentration was higher than 7.0 g L-1 in groundwater, irrigation was needed with only fresh water; if about 5.0 g L-1, irrigation was required twice with fresh water and once with saline water; and if not higher than 3.0 g L-1, irrigation could be solely with saline water. 展开更多
关键词 crop-water-salinity production function irrigation scheduling saline water irrigation water-salinity dy- namic model
下载PDF
Modeling and Analysis of Scheduling for Distributed Real-time Embedded Systems 被引量:2
7
作者 Hai-Tao Zhang Gui-Fang Wu 《International Journal of Automation and computing》 EI 2010年第4期525-530,共6页
Aimed at the deficiencies of resources based time Petri nets (RBTPN) in doing scheduling analysis for distributed real-time embedded systems, the assemblage condition of complex scheduling sequences is presented to ... Aimed at the deficiencies of resources based time Petri nets (RBTPN) in doing scheduling analysis for distributed real-time embedded systems, the assemblage condition of complex scheduling sequences is presented to easily compute scheduling length and simplify scheduling analysis. Based on this, a new hierarchical RBTPN model is proposed. The model introduces the definition of transition border set, and represents it as an abstract transition. The abstract transition possesses all resources of the set, and has the highest priority of each resource; the cxecution time of abstract transition is the longest time of all possible scheduling sequences. According to the characteristics and assemblage condition of RBTPN, the refinement conditions of transition border set are given, and the conditions ensure the correction of scheduling analysis. As a result, it is easy for us to understand the scheduling model and perform scheduling analysis. 展开更多
关键词 Embedded systems modelING time Petri nets scheduling analysis
下载PDF
RUIN PROBABILITY IN THE CONTINUOUS-TIME COMPOUND BINOMIAL MODEL WITH INVESTMENT 被引量:3
8
作者 张帅琪 刘国欣 孙梅慈 《Acta Mathematica Scientia》 SCIE CSCD 2015年第2期313-325,共13页
This article deals with the problem of minimizing ruin probability under optimal control for the continuous-time compound binomial model with investment. The jump mechanism in our article is different from that of Liu... This article deals with the problem of minimizing ruin probability under optimal control for the continuous-time compound binomial model with investment. The jump mechanism in our article is different from that of Liu et al [4]. Comparing with [4], the introduction of the investment, and hence, the additional Brownian motion term, makes the problem technically challenging. To overcome this technical difficulty, the theory of change of measure is used and an exponential martingale is obtained by virtue of the extended generator. The ruin probability is minimized through maximizing adjustment coefficient in the sense of Lundberg bounds. At the same time, the optimal investment strategy is obtained. 展开更多
关键词 The continuous-time compound binomial model INVESTMENT ruin probability Lundberg bounds
下载PDF
The Multi-Agent Modeling and Calculated Analysis of Shop Logistics Scheduling in the Manufacturing Enterprises 被引量:1
9
作者 CHEN Yong,LIN Feilong,WANG Xiao,TANG Kefeng (College of Mechanical & Electrical Engineering,Zhejiang University of Technology,Hangzhou 310032,China) 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S1期376-380,共5页
In this paper,the multi-agent model about shop logistics is set up. This model has 8 agents: raw materials stock agent,process agent,testing agent,transition agent,production information agent,scheduling agent,process... In this paper,the multi-agent model about shop logistics is set up. This model has 8 agents: raw materials stock agent,process agent,testing agent,transition agent,production information agent,scheduling agent,process agent and stock agent. The scheduling agent has three subagents: manager agent (MA),resource agent (RA) and part agent (PA). MA,PA and RA are communicating equally that guarantees agility of the whole MAS system. The part tasks pass between MA,RA and PA as an integer,which can guarantee the consistency of the data. We use a detailed example about shop logistics scheduling in a semiconductor company to explain the principle. In this example,we use two scheduling strategies: FCFS and SPT. The result data indicates that the average flow time and lingering ratio are changed using different strategy. It is proves that the multi-agent scheduling is useful. 展开更多
关键词 modelING MULTI-AGENT scheduling SHOP LOGISTICS
下载PDF
Data-driven Wasserstein distributionally robust chance-constrained optimization for crude oil scheduling under uncertainty
10
作者 Xin Dai Liang Zhao +4 位作者 Renchu He Wenli Du Weimin Zhong Zhi Li Feng Qian 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2024年第5期152-166,共15页
Crude oil scheduling optimization is an effective method to enhance the economic benefits of oil refining.But uncertainties,including uncertain demands of crude distillation units(CDUs),might make the production plans... Crude oil scheduling optimization is an effective method to enhance the economic benefits of oil refining.But uncertainties,including uncertain demands of crude distillation units(CDUs),might make the production plans made by the traditional deterministic optimization models infeasible.A data-driven Wasserstein distributionally robust chance-constrained(WDRCC)optimization approach is proposed in this paper to deal with demand uncertainty in crude oil scheduling.First,a new deterministic crude oil scheduling optimization model is developed as the basis of this approach.The Wasserstein distance is then used to build ambiguity sets from historical data to describe the possible realizations of probability distributions of uncertain demands.A cross-validation method is advanced to choose suitable radii for these ambiguity sets.The deterministic model is reformulated as a WDRCC optimization model for crude oil scheduling to guarantee the demand constraints hold with a desired high probability even in the worst situation in ambiguity sets.The proposed WDRCC model is transferred into an equivalent conditional value-at-risk representation and further derived as a mixed-integer nonlinear programming counterpart.Industrial case studies from a real-world refinery are conducted to show the effectiveness of the proposed method.Out-of-sample tests demonstrate that the solution of the WDRCC model is more robust than those of the deterministic model and the chance-constrained model. 展开更多
关键词 DISTRIBUTIONS model OPTIMIZATION Crude oil scheduling Wasserstein distance Distributionally robust chance constraints
下载PDF
RECONFIGURABLE PRODUCTION LINE MODELING AND SCHEDULING USING PETRI NETS AND GENETIC ALGORITHM 被引量:8
11
作者 XIE Nan LI Aiping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第3期362-367,共6页
In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its s... In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its scheduling problem. The basic DTPN modules are presented to model the corresponding variable structures in RPL, and then the scheduling model of the whole RPL is constructed. And in the scheduling algorithm, firing sequences of the Petri nets model are used as chromosomes, thus the selection, crossover, and mutation operator do not deal with the elements in the problem space, but the elements of Petri nets model. Accordingly, all the algorithms for GA operations embedded with Petri nets model are proposed. Moreover, the new weighted single-objective optimization based on reconfiguration cost and E/T is used. The results of a DC motor RPL scheduling suggest that the presented DTPN-GA scheduling algorithm has a significant impact on RPL scheduling, and provide obvious improvements over the conventional scheduling method in practice that meets duedate, minimizes reconfiguration cost, and enhances cost effectivity. 展开更多
关键词 Reconfigurable production line Deterministic timed Petri nets (DTPN) modeling scheduling Genetic algorithm(GA)
下载PDF
A Quadratic Programming Model for Blast Scheduling 被引量:1
12
作者 Chunyan Meng Samuel Frimpong Mingjian Zuo(Ph. D. Student (correspondent). 606-Chemical-Mineral Building. Dept of Civil and Environmental Engineering. University of Alberta. T6G 2G6.Edmonton, AB. Canada)(Associate protessor, School of Mining and Petrole 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 1999年第3期165-167,共3页
A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' pa... A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' parameters are available from the geological database of the mine. The objective is to minimize the deviation of the average ore grade of blasted blocks from the standard ore grade required by the mill. Transportation ability constraint. production quantity demand constraint. minimum safety bench constraint. block size constraint and block, bench precedence constraints are considered in forming the programming model. This model has more practical objective function and reasonable constraints compared with the existing model for this kind of problems. 展开更多
关键词 quadratic programming open pit mining blast scheduling mine production scheduling mathematical programming model
下载PDF
Unmanned Aerial Vehicle Inspection Routing and Scheduling for Engineering Management
13
作者 Lu Zhen Zhiyuan Yang +2 位作者 Gilbert Laporte Wen Yi Tianyi Fan 《Engineering》 SCIE EI CAS CSCD 2024年第5期223-239,共17页
Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as ... Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as a highly efficient method for identifying hidden risks in high-risk construction environments,surpassing traditional inspection techniques.Building on this foundation,this paper delves into the optimization of UAV inspection routing and scheduling,addressing the complexity introduced by factors such as no-fly zones,monitoring-interval time windows,and multiple monitoring rounds.To tackle this challenging problem,we propose a mixed-integer linear programming(MILP)model that optimizes inspection task assignments,monitoring sequence schedules,and charging decisions.The comprehensive consideration of these factors differentiates our problem from conventional vehicle routing problem(VRP),leading to a mathematically intractable model for commercial solvers in the case of large-scale instances.To overcome this limitation,we design a tailored variable neighborhood search(VNS)metaheuristic,customizing the algorithm to efficiently solve our model.Extensive numerical experiments are conducted to validate the efficacy of our proposed algorithm,demonstrating its scalability for both large-scale and real-scale instances.Sensitivity experiments and a case study based on an actual engineering project are also conducted,providing valuable insights for engineering managers to enhance inspection work efficiency. 展开更多
关键词 Engineering management Unmanned aerial vehicle Inspection routing and scheduling OPTIMIZATION Mixed-integer linear programming model Variable neighborhood search metaheuristic
下载PDF
The Information Modeling and Intelligent Optimization Method for Logistics Vehicle Routing and Scheduling with Multi-objective and Multi-constraint 被引量:2
14
作者 李蓓智 周亚勤 +1 位作者 兰世海 杨建国 《Journal of Donghua University(English Edition)》 EI CAS 2007年第4期455-459,466,共6页
The vehicle routing and scheduling (VRS) problem with multi-objective and multi-constraint is analyzed, considering the complexity of the modern logistics in city economy and daily life based on the system engineering... The vehicle routing and scheduling (VRS) problem with multi-objective and multi-constraint is analyzed, considering the complexity of the modern logistics in city economy and daily life based on the system engineering. The objective and constraint includes loading, the dispatch and arrival time, transportation conditions,total cost,etc. An information model and a mathematical model are built,and a method based on knowledge and biologic immunity is put forward for optimizing and evaluating the programs dimensions in vehicle routing and scheduling with multi-objective and multi-constraints. The proposed model and method are illustrated in a case study concerning a transport network, and the result shows that more optimization solutions can be easily obtained and the method is efficient and feasible. Comparing with the standard GA and the standard GA without time constraint,the computational time of the algorithm is less in this paper. And the probability of gaining optimal solution is bigger and the result is better under the condition of multi-constraint. 展开更多
关键词 modern logistics vehicle scheduling routing optimization MULTI-OBJECTIVE multi-constraint biologic immunity information modeling
下载PDF
Uncertain optimal model and solving method to platform scheduling problem in battlefield 被引量:2
15
作者 Yu Sun Peiyang Yao +1 位作者 Dongdong Shui Jieyong Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第1期157-165,共9页
The platform scheduling problem in battlefield is one of the important problems in military operational research.It needs to minimize mission completing time and meanwhile maximize the mission completing accuracy with... The platform scheduling problem in battlefield is one of the important problems in military operational research.It needs to minimize mission completing time and meanwhile maximize the mission completing accuracy with a limited number of platforms.Though the traditional certain models obtain some good results,uncertain model is still needed to be introduced since the battlefield environment is complex and unstable.An uncertain model is prposed for the platform scheduling problem.Related parameters in this model are set to be fuzzy or stochastic.Due to the inherent disadvantage of the solving methods for traditional models,a new method is proposed to solve the uncertain model.Finally,the practicability and availability of the proposed method are demonstrated with a case of joint campaign. 展开更多
关键词 operational research platform scheduling uncertain model solving method.
下载PDF
IaaS Public Cloud Computing Platform Scheduling Model and Optimization Analysis 被引量:1
16
作者 Aobing Sun Tongkai Ji +1 位作者 Qiang Yue Feiya Xiong 《International Journal of Communications, Network and System Sciences》 2011年第12期803-811,共9页
IaaS (Infrastructure as a Platform) public cloud is one mainstream service mode for public cloud computing. The design aim of one IaaS public cloud is to enlarge the hardware-usage of whole platform, optimize the virt... IaaS (Infrastructure as a Platform) public cloud is one mainstream service mode for public cloud computing. The design aim of one IaaS public cloud is to enlarge the hardware-usage of whole platform, optimize the virtual machine deployment and enhance the accept rate of service demand. In this paper we create one service model for IaaS public cloud, and based on the waiting-line theory to optimize the service model, the queue length and the configuration of scheduling server. And create one demand-vector based scheduling model, to filter the available host machine according to the match of demand and metadata of available resource. The scheduling model can be bonded with the virtual machine motion to reallocate the resources to guarantee the available rate of the whole platform. The feasibility of the algorithm is verified on our own IaaS public cloud computing platform. 展开更多
关键词 CLOUD COMPUTING IAAS scheduling model OPTIMIZATION ANALYSIS
下载PDF
Hybrid scheduling model and analysis of performance for switched industrial Ethernet 被引量:1
17
作者 胡春华 吴敏 +1 位作者 刘国平 王四春 《Journal of Central South University of Technology》 EI 2007年第2期271-277,共7页
The fact that outburst traffic in industrial Ethemet was focused on that would bring self-similar phenomenon leading to the delay increase of the cyclical data, and a hybrid priority queue schedule model was proposed ... The fact that outburst traffic in industrial Ethemet was focused on that would bring self-similar phenomenon leading to the delay increase of the cyclical data, and a hybrid priority queue schedule model was proposed in which the outburst data was given the highest priority. Some properties of the self-similar outburst data were proved by network calculus, and its service curve scheduled by the switch was gained. And then the performance of the scheduling algorithm was obtained. The simulation results are close to those calculated by using network calculus model. Some results are of actual significance to the construction of switched industrial Ethernet. 展开更多
关键词 switched industrial Ethemet scheduling model SELF-SIMILAR network calculus
下载PDF
A Heuristics-Based Cost Model for Scientic Workow Scheduling in Clou 被引量:1
18
作者 Ehab Nabiel Al-Khanak Sai Peck Lee +4 位作者 Saif Ur Rehman Khan Navid Behboodian Osamah Ibrahim Khalaf Alexander Verbraeck Hans van Lint 《Computers, Materials & Continua》 SCIE EI 2021年第6期3265-3282,共18页
Scientic Workow Applications(SWFAs)can deliver collaborative tools useful to researchers in executing large and complex scientic processes.Particularly,Scientic Workow Scheduling(SWFS)accelerates the computational pro... Scientic Workow Applications(SWFAs)can deliver collaborative tools useful to researchers in executing large and complex scientic processes.Particularly,Scientic Workow Scheduling(SWFS)accelerates the computational procedures between the available computational resources and the dependent workow jobs based on the researchers’requirements.However,cost optimization is one of the SWFS challenges in handling massive and complicated tasks and requires determining an approximate(near-optimal)solution within polynomial computational time.Motivated by this,current work proposes a novel SWFS cost optimization model effective in solving this challenge.The proposed model contains three main stages:(i)scientic workow application,(ii)targeted computational environment,and(iii)cost optimization criteria.The model has been used to optimize completion time(makespan)and overall computational cost of SWFS in cloud computing for all considered scenarios in this research context.This will ultimately reduce the cost for service consumers.At the same time,reducing the cost has a positive impact on the protability of service providers towards utilizing all computational resources to achieve a competitive advantage over other cloud service providers.To evaluate the effectiveness of this proposed model,an empirical comparison was conducted by employing three core types of heuristic approaches,including Single-based(i.e.,Genetic Algorithm(GA),Particle Swarm Optimization(PSO),and Invasive Weed Optimization(IWO)),Hybrid-based(i.e.,Hybrid-based Heuristics Algorithms(HIWO)),and Hyper-based(i.e.,Dynamic Hyper-Heuristic Algorithm(DHHA)).Additionally,a simulation-based implementation was used for SIPHT SWFA by considering three different sizes of datasets.The proposed model provides an efcient platform to optimally schedule workow tasks by handing data-intensiveness and computational-intensiveness of SWFAs.The results reveal that the proposed cost optimization model attained an optimal Job completion time(makespan)and total computational cost for small and large sizes of the considered dataset.In contrast,hybrid and hyper-based approaches consistently achieved better results for the medium-sized dataset. 展开更多
关键词 Scientic workow scheduling empirical comparison cost optimization model heuristic approach cloud computing
下载PDF
Feedback Scheduling of Model-based Networked Control Systems with Flexible Workload 被引量:4
19
作者 Xian-Ming Tang Jin-Shou Yu 《International Journal of Automation and computing》 EI 2008年第4期389-394,共6页
In this paper,a novel control structure called feedback scheduling of model-based networked control systems is proposed to cope with a flexible network load and resource constraints.The state update time is adjusted a... In this paper,a novel control structure called feedback scheduling of model-based networked control systems is proposed to cope with a flexible network load and resource constraints.The state update time is adjusted according to the real-time network congestion situation.State observer is used under the situation where the state of the controlled plant could not be acquired.The stability criterion of the proposed structure is proved with time-varying state update time.On the basis of the stability of the novel system structure,the compromise between the control performance and the network utilization is realized by using feedback scheduler. Examples are provided to show the advantage of the proposed control structure. 展开更多
关键词 model-based networked control system state update time stability criterion feedback scheduling.
下载PDF
Balancing timber production and habitat conservation of Okinawa Rails(Gallirallus okinawae): Application of a harvest scheduling optimization model in subtropical forest in Okinawa, Japan
20
作者 KONOSHIMA Masashi YOSHIMOTO Atsushi 《Journal of Mountain Science》 SCIE CSCD 2019年第12期2770-2782,共13页
Finding the right balance between timber production and the management of forest-dependent wildlife species,present a difficult challenge for forest resource managers and policy makers in Okinawa,Japan.A possible expl... Finding the right balance between timber production and the management of forest-dependent wildlife species,present a difficult challenge for forest resource managers and policy makers in Okinawa,Japan.A possible explanation of this can be found in the unique nature of the forest management area which is populated with various kinds of rare and endangered species.This issue has been brought to light as a result of the nomination of northern Okinawa Island in 2018 as a candidate for World Natural Heritage site.The nomination has raised public awareness to the possibility of conflicting management objectives between timber extraction and the conservation of habitat for forest-dependent wildlife species.Managing exclusively for one objective over the other may fail to meet the demand for both forest products and wildlife habitat,ultimately jeopardizing the stability of human and wildlife communities.It is therefore important to achieve a better balance between the objective of timber production and conservation of wildlife habitat.Despite the significance of this subject area,current ongoing discussions on how to effectively manage for forest resources,often lack scientific basis to make sound judgement or evaluate tradeoffs between conflicting objectives.Quantifying the effect of these forest management activities on wildlife habitat provides useful and important information needed to make forest management and policy decisions.In this study we develop a spatial timber harvest scheduling model that incorporates habitat suitability index(HSI)models for the Okinawa Rail(Gallirallus okinawae),an endangered avian species found on Okinawa,Japan.To illustrate how the proposed coupling model assembles spatial information,which ultimately aids the study of forest management effects on wildlife habitat,we apply these models to a forest area in Okinawa and conduct a simple simulation analysis. 展开更多
关键词 Harvest scheduling Habitat suitability index model Optimization model Timber production Wildlife habitat
下载PDF
上一页 1 2 163 下一页 到第
使用帮助 返回顶部