The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reducti...The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels.展开更多
Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of const...Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of construction companies running projects in international markets depends on how the risks arise from the host country conditions as well as the project specific risk factors. Successful management of risks requires identification of risks, construction of a risk model which can be used to assess the magnitude of risks, and implementation of response strategies so that an acceptable risk-return balance can be achieved. The project success usually depends on the combination of all risks, response strategies used to mitigate risks, and a company's ability to manage them. There exists a need to develop risk models containing the risks of doing business in international markets and factors that affect manageability of these risks. One of the market's critical challenges is scheduled management and the understanding and application of program management. This paper uses systematic risk identification, classification and analysis, and measurement and response methodologies to help international contractors quantify the risks of project development and accomplishment.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the cont...Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the contractual roles to settle the claims comfortably, this paper devote the research and literate review to find the key problems in contract claim management and give recommendation accordingly. With this focused objective, this paper presents a research analysis based on randomly selected data from international construction organization. The contract claim case studies analyzed by sampling survey scientific research method that follows a research strategy of specific to general. In the beginning, the paper analyzes the elements of contract claim administration,and then provides the general overview of the contract claim. Finally, it numerates the claim causes usage through cases studies under different contract condition of FIDIC. In addition to these discussions, analysis of other secondary data and recommendations forwarded to explain how claims should handle properly. During the thesis research period,there were 14 simple random selected projects have been studied as a case studies. From studied projects,the time extension in average, exceed 117.7% of its original contract completion time and the cost compensation increase 34.8% comparing to its initial contract value. Thus, the main causes of the majority contract claim problem lies on the failure in contract claim management and on unforeseen circumstance like variation, adverse climate, right of way problems, etc. Finally this thesis contributes to the improvement of contract claim management construction industry and open ways for further researches related to claim management.展开更多
The construction industry in the State of Kuwait has recently witnessed a rapid growth as the volume of construction projects increased significantly over the past decade. Because of the progress and growth of the ind...The construction industry in the State of Kuwait has recently witnessed a rapid growth as the volume of construction projects increased significantly over the past decade. Because of the progress and growth of the industry and the size of the projects, the volume of disputes between the parties to the various contracts has increased accordingly. As projects become larger and more complex, their management and control become more difficult, especially in the absence of effective standard systems to for managing project progress and determining the delay, if any. Even the simple issues, as well as the large ones, if neglected and unaddressed in a timely manner, can cause huge problems that concerns to all project parties. Irrespective of addressing and managing construction delays legally, the resulting legal disputes always have other negative effects on the contracting parties. If the parties to the contract have an insight that enables them to forecast and identify the issues that may cause a conflict before it occurs, that eliminates a myriad of problems before they occur, and greatly reduces the chances of further conflict between contracting parties. This paper presents a framework for a novel progress reporting system that can help minimize contract disputes in the state of Kuwait.展开更多
Late payment,and indeed no payment,is a rampant and chronic problem that has plagued the global construction industry for too long.Recent development in blockchain technology,particularly its smart contract,seems to p...Late payment,and indeed no payment,is a rampant and chronic problem that has plagued the global construction industry for too long.Recent development in blockchain technology,particularly its smart contract,seems to provide a new opportunity to improve this old problem.However,this opportunity is largely unexploited.This study aims to develop a blockchain-based smart contract(BBSC)system for smart payment in the construction industry by focusing on the fundamental cycle of payment freezing(sometimes also synonymously called payment guarantees)and disbursement application.Firstly,a BBSC framework,containing three processes of(a)initiation and configuration,(b)payment freezing,and(c)disbursement application,is developed.Next,based on the framework,the system architecture of the BBSC system,containing three layers of(1)Infrastructure as a Service(IaaS),(2)Blockchain as a Service(BaaS),and(3)Software as a Service(SaaS)is proposed and elaborated.Finally,based on the system architecture,a BBSC prototype system is developed using a real-life modular construction project as a case study.It was found that the prototype system can improve the certainty and efficiency of the progress payment,thereby enabling smart payment in construction transactions.Without advocating radical changes(e.g.,the contractual relationships or the intermediate role of banks in modem construction projects),the prototype can be developed into a real-life BBSC system that can work compatibly with current advancements in the field.Future works are recommended to fine-tune the findings and translate and implement them in real-life applications.展开更多
Blockchain,a peer-to-peer,controlled,distributed database structure,has the potential to profoundly affect current business transactions in the construction industry through smart contracts,cryptocurrencies,and reliab...Blockchain,a peer-to-peer,controlled,distributed database structure,has the potential to profoundly affect current business transactions in the construction industry through smart contracts,cryptocurrencies,and reliable asset tracking.The construction industry is often criticized for being slow in embracing emerging technologies and not effectively diffusing them through its supply chains.Often,the extensive fragmentation,traditional procurement structures,destructive competition,lack of collaboration and transparency,low-profit margins,and human resources are shown as the main culprits for this.As blockchain technology makes its presence felt strongly in many other industries like finance and banking,this study investigates the preparation of construction supply chains for blockchain technology through an explorative analysis.Empirical data for the study were collected through semistructured interviews with 17 subject experts.Alongside presenting a strengths,weaknesses,opportunities,and threats analysis(SWOT),the study exhibits the requirements for and steps toward a construction supply structure facilitated by blockchain technology.展开更多
文摘The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels.
文摘Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of construction companies running projects in international markets depends on how the risks arise from the host country conditions as well as the project specific risk factors. Successful management of risks requires identification of risks, construction of a risk model which can be used to assess the magnitude of risks, and implementation of response strategies so that an acceptable risk-return balance can be achieved. The project success usually depends on the combination of all risks, response strategies used to mitigate risks, and a company's ability to manage them. There exists a need to develop risk models containing the risks of doing business in international markets and factors that affect manageability of these risks. One of the market's critical challenges is scheduled management and the understanding and application of program management. This paper uses systematic risk identification, classification and analysis, and measurement and response methodologies to help international contractors quantify the risks of project development and accomplishment.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
文摘Claims in international civil engineering projects sometimes will have impact on implementing the contract successfully. in order to observe and evaluate the contract claim situation and give guideline to all the contractual roles to settle the claims comfortably, this paper devote the research and literate review to find the key problems in contract claim management and give recommendation accordingly. With this focused objective, this paper presents a research analysis based on randomly selected data from international construction organization. The contract claim case studies analyzed by sampling survey scientific research method that follows a research strategy of specific to general. In the beginning, the paper analyzes the elements of contract claim administration,and then provides the general overview of the contract claim. Finally, it numerates the claim causes usage through cases studies under different contract condition of FIDIC. In addition to these discussions, analysis of other secondary data and recommendations forwarded to explain how claims should handle properly. During the thesis research period,there were 14 simple random selected projects have been studied as a case studies. From studied projects,the time extension in average, exceed 117.7% of its original contract completion time and the cost compensation increase 34.8% comparing to its initial contract value. Thus, the main causes of the majority contract claim problem lies on the failure in contract claim management and on unforeseen circumstance like variation, adverse climate, right of way problems, etc. Finally this thesis contributes to the improvement of contract claim management construction industry and open ways for further researches related to claim management.
文摘The construction industry in the State of Kuwait has recently witnessed a rapid growth as the volume of construction projects increased significantly over the past decade. Because of the progress and growth of the industry and the size of the projects, the volume of disputes between the parties to the various contracts has increased accordingly. As projects become larger and more complex, their management and control become more difficult, especially in the absence of effective standard systems to for managing project progress and determining the delay, if any. Even the simple issues, as well as the large ones, if neglected and unaddressed in a timely manner, can cause huge problems that concerns to all project parties. Irrespective of addressing and managing construction delays legally, the resulting legal disputes always have other negative effects on the contracting parties. If the parties to the contract have an insight that enables them to forecast and identify the issues that may cause a conflict before it occurs, that eliminates a myriad of problems before they occur, and greatly reduces the chances of further conflict between contracting parties. This paper presents a framework for a novel progress reporting system that can help minimize contract disputes in the state of Kuwait.
基金This work was financially supported by the Hong Kong Innovation and Technology Commission(ITC)with the Innovation and Technology Fund(ITF)(Grant No.ITP/029/20LP).
文摘Late payment,and indeed no payment,is a rampant and chronic problem that has plagued the global construction industry for too long.Recent development in blockchain technology,particularly its smart contract,seems to provide a new opportunity to improve this old problem.However,this opportunity is largely unexploited.This study aims to develop a blockchain-based smart contract(BBSC)system for smart payment in the construction industry by focusing on the fundamental cycle of payment freezing(sometimes also synonymously called payment guarantees)and disbursement application.Firstly,a BBSC framework,containing three processes of(a)initiation and configuration,(b)payment freezing,and(c)disbursement application,is developed.Next,based on the framework,the system architecture of the BBSC system,containing three layers of(1)Infrastructure as a Service(IaaS),(2)Blockchain as a Service(BaaS),and(3)Software as a Service(SaaS)is proposed and elaborated.Finally,based on the system architecture,a BBSC prototype system is developed using a real-life modular construction project as a case study.It was found that the prototype system can improve the certainty and efficiency of the progress payment,thereby enabling smart payment in construction transactions.Without advocating radical changes(e.g.,the contractual relationships or the intermediate role of banks in modem construction projects),the prototype can be developed into a real-life BBSC system that can work compatibly with current advancements in the field.Future works are recommended to fine-tune the findings and translate and implement them in real-life applications.
基金the research project“Toward blockchain-enabled construction supply chains:Potential,requirements and implementation”flinded by the Centre for Digital Built Britain,under Innovate UK Grant No.90066.
文摘Blockchain,a peer-to-peer,controlled,distributed database structure,has the potential to profoundly affect current business transactions in the construction industry through smart contracts,cryptocurrencies,and reliable asset tracking.The construction industry is often criticized for being slow in embracing emerging technologies and not effectively diffusing them through its supply chains.Often,the extensive fragmentation,traditional procurement structures,destructive competition,lack of collaboration and transparency,low-profit margins,and human resources are shown as the main culprits for this.As blockchain technology makes its presence felt strongly in many other industries like finance and banking,this study investigates the preparation of construction supply chains for blockchain technology through an explorative analysis.Empirical data for the study were collected through semistructured interviews with 17 subject experts.Alongside presenting a strengths,weaknesses,opportunities,and threats analysis(SWOT),the study exhibits the requirements for and steps toward a construction supply structure facilitated by blockchain technology.