In this paper, by virtue of an inequality and sane analysis techniques, we prove sane convergence theorems cm the iterative process for nonlinear mappings of-pseudo contractive type in named linear spaces, which exten...In this paper, by virtue of an inequality and sane analysis techniques, we prove sane convergence theorems cm the iterative process for nonlinear mappings of-pseudo contractive type in named linear spaces, which extend and improve the corresponding results obtained by others recently.展开更多
The purpose of this paper is to introduce the concept of Φ_pseudo contractive type mapping and to study the convergence problem of Ishikawa and Mann iterative processes with error for this kind of mappings. The resul...The purpose of this paper is to introduce the concept of Φ_pseudo contractive type mapping and to study the convergence problem of Ishikawa and Mann iterative processes with error for this kind of mappings. The results presented in this paper improve and extend many authors'recent results.展开更多
In 2011, Berinde and Borcut [6] introduced the notion of tripled fixed point in partially ordered metric spaces. In our paper, we give some new tripled fixed point theorems by using a generalization of Meir-Keeler con...In 2011, Berinde and Borcut [6] introduced the notion of tripled fixed point in partially ordered metric spaces. In our paper, we give some new tripled fixed point theorems by using a generalization of Meir-Keeler contraction:展开更多
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m...The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.展开更多
文摘In this paper, by virtue of an inequality and sane analysis techniques, we prove sane convergence theorems cm the iterative process for nonlinear mappings of-pseudo contractive type in named linear spaces, which extend and improve the corresponding results obtained by others recently.
文摘The purpose of this paper is to introduce the concept of Φ_pseudo contractive type mapping and to study the convergence problem of Ishikawa and Mann iterative processes with error for this kind of mappings. The results presented in this paper improve and extend many authors'recent results.
基金supported by Università degli Studi di Padermo,Local Project R.S.ex 60\char37
文摘In 2011, Berinde and Borcut [6] introduced the notion of tripled fixed point in partially ordered metric spaces. In our paper, we give some new tripled fixed point theorems by using a generalization of Meir-Keeler contraction:
基金provided through the U.S. Department of the Interior, Bureau of Ocean Energy Management
文摘The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.