In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect ...In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and th...In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cos...Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.展开更多
A time-inconsistent linear-quadratic optimal control problem for stochastic differential equations is studied.We introduce conditions where the control cost weighting matrix is possibly singular.Under such conditions,...A time-inconsistent linear-quadratic optimal control problem for stochastic differential equations is studied.We introduce conditions where the control cost weighting matrix is possibly singular.Under such conditions,we obtain a family of closed-loop equilibrium strategies via multi-person differential games.This result extends Yong’s work(2017) in the case of stochastic differential equations,where a unique closed-loop equilibrium strategy can be derived under standard conditions(namely,the control cost weighting matrix is uniformly positive definite,and the other weighting coefficients are positive semidefinite).展开更多
Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthca...Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
The decentralized robust guaranteed cost control problem is studied for a class of interconnected singular large-scale systems with time-delay and norm-bounded time-invariant parameter uncertainty under a given quadra...The decentralized robust guaranteed cost control problem is studied for a class of interconnected singular large-scale systems with time-delay and norm-bounded time-invariant parameter uncertainty under a given quadratic cost performance function. The problem that is addressed in this study is to design a decentralized robust guaranteed cost state feedback controller such that the closed-loop system is not only regular, impulse-free and stable, but also guarantees an adequate level of performance for all admissible uncertainties. A sufficient condition for the existence of the decentralized robust guaranteed cost state feedback controllers is proposed in terms of a linear matrix inequality (LMI) via LMI approach. When this condition is feasible, the desired state feedback decentralized robust guaranteed cost controller gain matrices can be obtained. Finally, an illustrative example is provided to demonstrate the effectiveness of the proposed approach.展开更多
Based on an equivalent two-dimensional Fornasini-Marchsini model for a batch process in industry, a closed-loop robust iterative learning fault-tolerant guaranteed cost control scheme is proposed for batch processes w...Based on an equivalent two-dimensional Fornasini-Marchsini model for a batch process in industry, a closed-loop robust iterative learning fault-tolerant guaranteed cost control scheme is proposed for batch processes with actuator failures. This paper introduces relevant concepts of the fault-tolerant guaranteed cost control and formulates the robust iterative learning reliable guaranteed cost controller (ILRGCC). A significant advantage is that the proposed ILRGCC design method can be used for on-line optimization against batch-to-batch process uncertainties to realize robust tracking of set-point trajectory in time and batch-to-batch sequences. For the convenience of implementation, only measured output errors of current and previous cycles are used to design a synthetic controller for iterative learning control, consisting of dynamic output feedback plus feed-forward control. The proposed controller can not only guarantee the closed-loop convergency along time and cycle sequences but also satisfy the H∞performance level and a cost function with upper bounds for all admissible uncertainties and any actuator failures. Sufficient conditions for the controller solution are derived in terms of linear matrix inequalities (LMIs), and design procedures, which formulate a convex optimization problem with LMI constraints, are presented. An example of injection molding is given to illustrate the effectiveness and advantages of the ILRGCC design approach.展开更多
This article concerns the delay-independent guaranteed-cost control problem via memoryless state feedback for a class of neutral-type systems with structural uncertainty and a given quadratic cost function. New delay-...This article concerns the delay-independent guaranteed-cost control problem via memoryless state feedback for a class of neutral-type systems with structural uncertainty and a given quadratic cost function. New delay-independent conditions for the existence of the guaranteed-cost controller are presented in the term of LMIs. An algorithm involving optimization is proposed to design a controller achieving an optimal guaranteed-cost, such that, the system can be stabilized for all admissible uncertainties. A numerical example is provided to illustrate the feasibility of the proposed method.展开更多
The robust reliable guaranteed cost control for uncertain singular delay systems with actuator failures and a given quadratic cost function is studied. The system under consideration involves constant time-delay and n...The robust reliable guaranteed cost control for uncertain singular delay systems with actuator failures and a given quadratic cost function is studied. The system under consideration involves constant time-delay and norm-bounded parameter uncertainties. The purpose is to design state feedback controllers which can tolerate actuator failure, such that the closed-loop system is stable, and the specified cost function has an upper bound for all admissible uncertainties. The sufficient conditions for the solvability of this problem are obtained by a linear matrix inequality (LMI) method. Furthermore, a numerical example is given to demonstrate the applicability of the proposed approach.展开更多
This paper focuses on the problem of non-fragile guaranteed cost control for a class of T-S discrete-time fuzzy bilinear systems(DFBS).Based on the parallel distributed compensation(PDC) approach,the sufficient co...This paper focuses on the problem of non-fragile guaranteed cost control for a class of T-S discrete-time fuzzy bilinear systems(DFBS).Based on the parallel distributed compensation(PDC) approach,the sufficient conditions are derived such that the closed-loop system is asymptotically stable and the cost function value is no more than a certain upper bound in the presence of the additive controller gain perturbations.The non-fragile guaranteed cost controller can be obtained by solving a set of bilinear matrix inequalities(BMIs).The Van de Vusse model is utilized to demonstrate the validity and effectiveness of the proposed approach.展开更多
The problem of guaranteed cost active fault-tolerant controller (AFTC) design for networked control systems (NCSs) with both packet dropout and transmission delay is studied in this paper. Considering the packet d...The problem of guaranteed cost active fault-tolerant controller (AFTC) design for networked control systems (NCSs) with both packet dropout and transmission delay is studied in this paper. Considering the packet dropout and transmission delay, a piecewise constant controller is adopted. With a guaranteed cost function, optimal controllers whose number is equal to the number of actuators are designed, and the design process is formulated as a convex optimal problem that can be solved by existing software. The control strategy is proposed as follows: when actuator failures appear, the fault detection and isolation unit sends out the information to the controller choosing strategy, and then the optimal stabilizing controller with the smallest guaranteed cost value is chosen. Two illustrative examples are given to demonstrate the effectiveness of the proposed approach. By comparing with the existing methods, it can be seen that our method has a better performance.展开更多
A guaranteed cost control problem for a class of linear discrete-time switched systems with norm-bounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state fee...A guaranteed cost control problem for a class of linear discrete-time switched systems with norm-bounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state feedback control law, such that, the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound for all admissible uncertainties under the constructed switching rule. A sufficient condition for the existence of guaranteed cost controllers and switching rules is derived based on the Lyapunov theory together with the linear matrix inequality (LMI) approach. Furthermore, a convex optimization problem with LMI constraints is formulated to select the suboptimal guaranteed cost controller. A numerical example demonstrates the validity of the proposed design approach.展开更多
The problem of guaranteed cost control for the networked control systems(NCSs) with time-varying delays, time-varying sampling intervals and signals quantization was investigated, wherein the physical plant was contin...The problem of guaranteed cost control for the networked control systems(NCSs) with time-varying delays, time-varying sampling intervals and signals quantization was investigated, wherein the physical plant was continuous-time one, and the control input was discrete-time one. By using an input delay approach and a sector bound method, the network induced delays, quantization parameter and sampling intervals were presented in one framework in the case of the state and the control input by quantized in a logarithmic form. A novel Lyapunov function with discontinuity, which took full advantages of the NCS characteristic information, was exploited. In addition, it was shown that Lyapunov function decreased at the jump instants. Furthermore, the Leibniz-Newton formula and free-weighting matrix methods were used to obtain the guaranteed cost controller design conditions which were dependent on the NCS characteristic information. A numerical example was used to illustrate the effectiveness of the proposed methods.展开更多
With consideration that the controller parameters may vary from the designed value when the controller is realized, based on Lyapunov stability theory, a design method of nonfragile guaranteed cost control for a class...With consideration that the controller parameters may vary from the designed value when the controller is realized, based on Lyapunov stability theory, a design method of nonfragile guaranteed cost control for a class of Delta operator-formulated uncertain time-delay systems is studied. A sufficient condition for the existence of the nonfragile guaranteed cost controller is given. A numeric example is then given to illustrate the effectiveness and the feasibility of the designed method. The results show that even if the parameters of the designed controller are of variations, the closed-loop system is still asymptotically stable and the super value of the cost function can also be obtained, while the closed-loop system will be unstable if the variations of the controller parameters are not considered when the controller is designed. The nonfragile guaranteed cost controller derived from the traditional shift operator method may cause the closed-loop system to be unstable, while the nonfragile guaranteed cost controller based on Delta operator method can avoid the unstable problem of the closed-loop system.展开更多
This paper considers the guaranteed cost control problem for a class of uncertain linear systems with both state and input delays. By representing the time-delay system in the descriptor system form and using a recent...This paper considers the guaranteed cost control problem for a class of uncertain linear systems with both state and input delays. By representing the time-delay system in the descriptor system form and using a recent result on bounding of cross products of vectors, we obtain new delay-dependent sufficient conditions for the existence of the guaranteed cost controller in terms of linear matrix inequalities. Two examples are presented which show the effectiveness of our approach.展开更多
文摘In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
基金University-level self-study project:Construction cost control research of finished house based on BIM-5D(Project No.2023xzky06)。
文摘Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.
基金supported by National Natural Science Foundation of China (Grant Nos.12025105, 11971334 and 11931011)the Chang Jiang Scholars Program and the Science Development Project of Sichuan University (Grant Nos. 2020SCUNL101 and 2020SCUNL201)。
文摘A time-inconsistent linear-quadratic optimal control problem for stochastic differential equations is studied.We introduce conditions where the control cost weighting matrix is possibly singular.Under such conditions,we obtain a family of closed-loop equilibrium strategies via multi-person differential games.This result extends Yong’s work(2017) in the case of stochastic differential equations,where a unique closed-loop equilibrium strategy can be derived under standard conditions(namely,the control cost weighting matrix is uniformly positive definite,and the other weighting coefficients are positive semidefinite).
文摘Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
基金This project was supported by the National Natural Science Foundation of China (60474078)Science Foundation of High Education of Jiangsu of China (04KJD120016).
文摘The decentralized robust guaranteed cost control problem is studied for a class of interconnected singular large-scale systems with time-delay and norm-bounded time-invariant parameter uncertainty under a given quadratic cost performance function. The problem that is addressed in this study is to design a decentralized robust guaranteed cost state feedback controller such that the closed-loop system is not only regular, impulse-free and stable, but also guarantees an adequate level of performance for all admissible uncertainties. A sufficient condition for the existence of the decentralized robust guaranteed cost state feedback controllers is proposed in terms of a linear matrix inequality (LMI) via LMI approach. When this condition is feasible, the desired state feedback decentralized robust guaranteed cost controller gain matrices can be obtained. Finally, an illustrative example is provided to demonstrate the effectiveness of the proposed approach.
基金Supported in part by NSFC/RGC joint Research Scheme (N-HKUST639/09), the National Natural Science Foundation of China (61104058, 61273101), Guangzhou Scientific and Technological Project (2012J5100032), Nansha district independent innovation project (201103003), China Postdoctoral Science Foundation (2012M511367, 2012M511368), and Doctor Scientific Research Foundation of Liaoning Province (20121046).
文摘Based on an equivalent two-dimensional Fornasini-Marchsini model for a batch process in industry, a closed-loop robust iterative learning fault-tolerant guaranteed cost control scheme is proposed for batch processes with actuator failures. This paper introduces relevant concepts of the fault-tolerant guaranteed cost control and formulates the robust iterative learning reliable guaranteed cost controller (ILRGCC). A significant advantage is that the proposed ILRGCC design method can be used for on-line optimization against batch-to-batch process uncertainties to realize robust tracking of set-point trajectory in time and batch-to-batch sequences. For the convenience of implementation, only measured output errors of current and previous cycles are used to design a synthetic controller for iterative learning control, consisting of dynamic output feedback plus feed-forward control. The proposed controller can not only guarantee the closed-loop convergency along time and cycle sequences but also satisfy the H∞performance level and a cost function with upper bounds for all admissible uncertainties and any actuator failures. Sufficient conditions for the controller solution are derived in terms of linear matrix inequalities (LMIs), and design procedures, which formulate a convex optimization problem with LMI constraints, are presented. An example of injection molding is given to illustrate the effectiveness and advantages of the ILRGCC design approach.
基金This project was supported by the Natural Science Basic Research Plan in Shaanxi Province of China (2006A13)the Foundation of Research Project of Educational Department of Shaanxi Province (06JK149).
文摘This article concerns the delay-independent guaranteed-cost control problem via memoryless state feedback for a class of neutral-type systems with structural uncertainty and a given quadratic cost function. New delay-independent conditions for the existence of the guaranteed-cost controller are presented in the term of LMIs. An algorithm involving optimization is proposed to design a controller achieving an optimal guaranteed-cost, such that, the system can be stabilized for all admissible uncertainties. A numerical example is provided to illustrate the feasibility of the proposed method.
基金supported by the National Natural Science Foundation of China (60564001)the Program for New Century Excellent Talentsin University (NCET-06-0756)
文摘The robust reliable guaranteed cost control for uncertain singular delay systems with actuator failures and a given quadratic cost function is studied. The system under consideration involves constant time-delay and norm-bounded parameter uncertainties. The purpose is to design state feedback controllers which can tolerate actuator failure, such that the closed-loop system is stable, and the specified cost function has an upper bound for all admissible uncertainties. The sufficient conditions for the solvability of this problem are obtained by a linear matrix inequality (LMI) method. Furthermore, a numerical example is given to demonstrate the applicability of the proposed approach.
基金supported by the National Natural Science Foundation of China(60374015)
文摘This paper focuses on the problem of non-fragile guaranteed cost control for a class of T-S discrete-time fuzzy bilinear systems(DFBS).Based on the parallel distributed compensation(PDC) approach,the sufficient conditions are derived such that the closed-loop system is asymptotically stable and the cost function value is no more than a certain upper bound in the presence of the additive controller gain perturbations.The non-fragile guaranteed cost controller can be obtained by solving a set of bilinear matrix inequalities(BMIs).The Van de Vusse model is utilized to demonstrate the validity and effectiveness of the proposed approach.
基金supported by National Outstanding Youth Foundation (No. 60525303)National Natural Science Foundation of China(No. 60704009)+1 种基金Key Project for Natural Science Research of Hebei Education Department (No. ZD200908)the Doctor Fund of YanShan University (No. B203)
文摘The problem of guaranteed cost active fault-tolerant controller (AFTC) design for networked control systems (NCSs) with both packet dropout and transmission delay is studied in this paper. Considering the packet dropout and transmission delay, a piecewise constant controller is adopted. With a guaranteed cost function, optimal controllers whose number is equal to the number of actuators are designed, and the design process is formulated as a convex optimal problem that can be solved by existing software. The control strategy is proposed as follows: when actuator failures appear, the fault detection and isolation unit sends out the information to the controller choosing strategy, and then the optimal stabilizing controller with the smallest guaranteed cost value is chosen. Two illustrative examples are given to demonstrate the effectiveness of the proposed approach. By comparing with the existing methods, it can be seen that our method has a better performance.
基金This project was supported by a Program for Changjiang Scholars and an Innovative Research Team in the University and the National Natural Science Foundation of P. R. China (60474015).
文摘A guaranteed cost control problem for a class of linear discrete-time switched systems with norm-bounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state feedback control law, such that, the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound for all admissible uncertainties under the constructed switching rule. A sufficient condition for the existence of guaranteed cost controllers and switching rules is derived based on the Lyapunov theory together with the linear matrix inequality (LMI) approach. Furthermore, a convex optimization problem with LMI constraints is formulated to select the suboptimal guaranteed cost controller. A numerical example demonstrates the validity of the proposed design approach.
基金Project(61104106) supported by the National Natural Science Foundation of ChinaProject(201202156) supported by the Natural Science Foundation of Liaoning Province,ChinaProject(LJQ2012100) supported by Program for Liaoning Excellent Talents in University(LNET)
文摘The problem of guaranteed cost control for the networked control systems(NCSs) with time-varying delays, time-varying sampling intervals and signals quantization was investigated, wherein the physical plant was continuous-time one, and the control input was discrete-time one. By using an input delay approach and a sector bound method, the network induced delays, quantization parameter and sampling intervals were presented in one framework in the case of the state and the control input by quantized in a logarithmic form. A novel Lyapunov function with discontinuity, which took full advantages of the NCS characteristic information, was exploited. In addition, it was shown that Lyapunov function decreased at the jump instants. Furthermore, the Leibniz-Newton formula and free-weighting matrix methods were used to obtain the guaranteed cost controller design conditions which were dependent on the NCS characteristic information. A numerical example was used to illustrate the effectiveness of the proposed methods.
基金supported by the Natural Science Foundation of Fujian Province (No.2008J04016)
文摘With consideration that the controller parameters may vary from the designed value when the controller is realized, based on Lyapunov stability theory, a design method of nonfragile guaranteed cost control for a class of Delta operator-formulated uncertain time-delay systems is studied. A sufficient condition for the existence of the nonfragile guaranteed cost controller is given. A numeric example is then given to illustrate the effectiveness and the feasibility of the designed method. The results show that even if the parameters of the designed controller are of variations, the closed-loop system is still asymptotically stable and the super value of the cost function can also be obtained, while the closed-loop system will be unstable if the variations of the controller parameters are not considered when the controller is designed. The nonfragile guaranteed cost controller derived from the traditional shift operator method may cause the closed-loop system to be unstable, while the nonfragile guaranteed cost controller based on Delta operator method can avoid the unstable problem of the closed-loop system.
基金This work was supported by the National Natural Science Foundation of China (No. 10461001).
文摘This paper considers the guaranteed cost control problem for a class of uncertain linear systems with both state and input delays. By representing the time-delay system in the descriptor system form and using a recent result on bounding of cross products of vectors, we obtain new delay-dependent sufficient conditions for the existence of the guaranteed cost controller in terms of linear matrix inequalities. Two examples are presented which show the effectiveness of our approach.