Spatial diversion and coordination of flood water for an urban flood control project in Suzhou, China
1
作者 Yu Xu You-peng Xu +2 位作者 Qiang Wang Yue-feng Wang Chao Gao 《Water Science and Engineering》 EI CAS CSCD 2024年第2期108-117,共10页
Suzhou City,located in the Yangtze River Delta in China,is prone to flooding due to a complex combination of natural factors,including its monsoon climate,low elevation,and tidally influenced position,as well as inten... Suzhou City,located in the Yangtze River Delta in China,is prone to flooding due to a complex combination of natural factors,including its monsoon climate,low elevation,and tidally influenced position,as well as intensive human activities.The Large Encirclement Flood Control Project(LEFCP)was launched to cope with serious floods in the urban area.This project changed the spatiotemporal pattern of flood processes and caused spatial diversion of floods from the urban area to the outskirts of the city.Therefore,this study developed a distributed flood simulation model in order to understand this transition of flood processes.The results revealed that the LEFCP effectively protected the urban areas from floods,but the present scheduling schemes resulted in the spatial diversion of floods to the outskirts of the city.With rainstorm frequencies of 10.0%to 0.5%,the water level differences between two representative water level stations(Miduqiao(MDQ)and Fengqiao(FQ))located inside and outside the LEFCP area,ranged from 0.75 m to 0.24 m and from 1.80 m to 1.58 m,respectively.In addition,the flood safety margin at MDQ and the duration with the water level exceeding the warning water level at FQ ranged from 0.95 m to 0.43 m and from 4 h to 22 h,respectively.Rational scheduling schemes for the hydraulic facilities of the LEFCP in extreme precipitation cases were developed ac-cording to food simulations under seven scheduling scenarios.This helps to regulate the spatial flood diversion caused by the LEFCP during extreme precipitation. 展开更多
关键词 Urban flooding Urban flood control project Rainstorm fregue ncy Flood simulation model Suzhou City
下载PDF
Hydrological adjustment and flooding control of wetlands in the Liaohe Delta 被引量:3
2
作者 XIAODu-ning WANGXian-li 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2003年第2期146-151,共6页
The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm... The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm, which is 37.5% higher than large water body(E 601∶525.9 mm). The water replacement rate in the reed field can reach 95% only when the rains continuously for 11 days and the precipitation reached 912 mm. For the water balance in the paddy field, the total water requirement ranges between 1920 and 1860 mm, among which, 31% is from precipitation, and the left is provided by reservoirs. The water usage efficiency is 0.35 at present productivity. Based on the landscape characteristics and functionalities on flooding control, 5 functional zones are designed for the Liaohe Delta: key protected area; underground storage area; flooding discharge area; flood diversion area in emergency; and flood control drainage area. 展开更多
关键词 hydrological adjustment flood control water replacement water balance landscape planning
下载PDF
Oil Production Optimization by Means of a Combined“Plugging,Profile Control,and Flooding”Treatment:Analysis of Results Obtained Using Computer Tomography and Nuclear Magnetic Resonance 被引量:1
3
作者 Yanyue Li Changlong Liu +5 位作者 Wenbo Bao Baoqing Xue Peng Lv Nan Wang Hui Li Wenguo Ma 《Fluid Dynamics & Materials Processing》 EI 2022年第3期737-749,共13页
Due to long-term water injection,often oilfields enter the so-called medium and high water cut stage,and it is difficult to achieve good oil recovery and water reduction through standard methods(single profile control... Due to long-term water injection,often oilfields enter the so-called medium and high water cut stage,and it is difficult to achieve good oil recovery and water reduction through standard methods(single profile control and flooding measures).Therefore,in this study,a novel method based on“plugging,profile control,and flooding”being implemented at the same time is proposed.To assess the performances of this approach,physical simulations,computer tomography,and nuclear magnetic resonance are used.The results show that the combination of a gel plugging agent,a polymer microsphere flooding agent,and a high-efficiency oil displacement agent leads to better results in terms of oil recovery with respect to the situation in which these approaches are used separately(the oil recovery is increased by 15.37%).Computer tomography scan results show that with the combined approach,a larger sweep volume and higher oil washing efficiency are obtained.The remaining oil in the cluster form can be recovered in the middle and low permeability layer,increasing the proportion of the columnar and blind end states of the oil.The nuclear magnetic resonance test results show that the combined“plugging,profile control,and flooding”treatment can also be used to control more effectively the dominant channels of the high permeability layer and further expand the recovery degree of the remaining oil in the pores of different sizes in the middle and low permeability layers.However,for the low permeability layer(permeability difference of 20),the benefits in terms of oil recovery are limited. 展开更多
关键词 “Plugging profile control and flooding”measures computed tomography scan nuclear magnetic resonance remaining oil recovery ratio
下载PDF
Exploration of Sponge System Design in Wetland Parks Based on Rainwater and Flood Control: A Case Study of Southern Anhui Province
4
作者 CAO Menghan GE Juan +2 位作者 HU Yueyue ZHANG Yanwen LI Yinan 《Journal of Landscape Research》 2023年第6期59-64,共6页
Based on the background that wetland resources in China are under threat and urgently need to be protected,a series of rainwater and flood problems caused by urban construction is analyzed comprehensively,and the desi... Based on the background that wetland resources in China are under threat and urgently need to be protected,a series of rainwater and flood problems caused by urban construction is analyzed comprehensively,and the design and planning methods of wetland parks in response to rainwater and flood disasters caused by floods and heavy rainfall are explored.Southern Anhui with complex and variable terrain and frequent rainfall and flood disasters is selected as the research area,with Xuanzhou District of Xuancheng City as the main research object.The relationship between municipal drainage of urban park and water conservancy drainage is investigated from different sample selection,design samples,and design flow rates.Based on literature review and model building methods,an urban storm flood model suitable for typical wetland parks in southern Anhui is constructed after processing the survey data using Arc GIS,SWMM(storm water management model).On this basis,a methodology and principles for designing a sponge system of wetland park based on rainwater and flood control are proposed,including technical measures such as rainwater collection,retention,and purification.This paper provides certain research results in design schemes,effect evaluations,ecological and social benefits,and useful suggestions and solutions for urban stormwater management and resilience development. 展开更多
关键词 Wetland park Rainwater and flood control Sponge city Resilient mountain landscape
下载PDF
The Effect of Geologic Structures on the Control of Floods in the Middle Yangtze River Valley
5
作者 Tong Qianming 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2000年第2期344-348,共5页
This paper discusses the role of geologic structures in the occurrence of floods and how to prevent flood in the middle reaches of the Yangtze River, and gives the author's suggestion that the Luoshan Qiakou be ex... This paper discusses the role of geologic structures in the occurrence of floods and how to prevent flood in the middle reaches of the Yangtze River, and gives the author's suggestion that the Luoshan Qiakou be expanded and the land reclaimed from Dongting Lake be returned to the lake in compliance with the law of geology. 展开更多
关键词 the middle Yangtze River valley STRUCTURES FLOOD flood control
下载PDF
FLOOD CONTROL PROGRAMME IN BANGLADESH
6
作者 Wu Bingfang, Xia Fuxiang (National Lab. of Environmental & Resources Information System) (Institute of Geography, Chinese Academy of Sciences) 《遥感信息》 CSCD 1990年第A02期49-50,共2页
Bangladesh locates in lower reach of Ganges-Brahmaputra-Meghma, Bengal delta. Bangladesh is a land of rivers and heavy monsoon rains. Every year during monsoon period (May-September)the country floods of verying magni... Bangladesh locates in lower reach of Ganges-Brahmaputra-Meghma, Bengal delta. Bangladesh is a land of rivers and heavy monsoon rains. Every year during monsoon period (May-September)the country floods of verying magnitude, it causes damages to crops, properties, infrastructures, etc. and ultimately affects the economy development of the country. Banglandesh flood has some features given below: 1. The excessive rainfall over the vast catchment area of the river is the main cause of flood in Bangladesh, but 90% of the flood carried by rivers come from outside the country, i.e. regional countries, India, Nepal, 展开更多
关键词 FLOOD BA GIS FLOOD control PROGRAMME IN BANGLADESH
下载PDF
Improvement Strategies of Flood Control Landscape in Suburban Villages and Towns from the Perspective of Aquaphilia and Livability
7
作者 DING Huangjie YAN Chen +2 位作者 FANG Cheng ZHANG Shijie LV Yuanhao 《Journal of Landscape Research》 2022年第6期40-42,46,共4页
In the context of urban and rural integrated development, many suburban villages and towns are still threatened by both urbanization and natural disasters. In order to explore the improvement strategies of flood contr... In the context of urban and rural integrated development, many suburban villages and towns are still threatened by both urbanization and natural disasters. In order to explore the improvement strategies of flood control landscape integrating water ecology, water safety, water culture and water landscape, the Luozhou Ancient Town by the Wulong River in Fuzhou City was taken as an example, and the concept of pluralistic symbiosis from the perspective of aquaphilia and livability was proposed through field investigation, data monitoring, site analysis and planning, that is, while retaining the positive attributes of “boundary”, its negative limitation of “pluralistic” space is broken, so as to establish a pluralistic and symbiotic environment with aquaphilia and livability. It can not only effectively alleviate the contradictions between urban and rural areas, between water and land, and between old and new cultures, but also activate the vitality of suburban villages and towns, providing a new idea for the improvement of flood control landscape. 展开更多
关键词 LIVABILITY Urban and rural integration Flood control Waterfront landscape
下载PDF
Fang Ziyun, Flood Control Expert
8
《China Today》 1997年第2期26-28,共3页
关键词 Flood control Expert Fang Ziyun
下载PDF
THE WARNING OF THE '98 YANGTZE DELUGE & OUR FLOOD CONTROL STRATEGY
9
作者 Yu Xiaogan, Jiang Jiahu, Dou Hongshen Yang Guishan(Nanjing Institute of Geography & Limnology) 《Bulletin of the Chinese Academy of Sciences》 1999年第1期50-56,共7页
Based on a panoramic analysis of the serious Yangtze deluge in 1998 and its hydrological traits, the authors elucidate the formative factors of the deluge and review existing flood-control policies in retrospect. In a... Based on a panoramic analysis of the serious Yangtze deluge in 1998 and its hydrological traits, the authors elucidate the formative factors of the deluge and review existing flood-control policies in retrospect. In addition, some countermeas-ures are suggested for coping with similar calamities in the near future. 展开更多
关键词 OUR FLOOD control STRATEGY Pro LAKE THE WARNING OF THE YANGTZE DELUGE than
下载PDF
REMOTE-SENSING TECHNOLOGY IN FLOOD CONTROL IN CHINA
10
作者 Wei Chenjie and Wang Shixin(CAS Institute of Remote-Sensing Application) 《Bulletin of the Chinese Academy of Sciences》 1999年第1期62-67,共6页
This article expounds the vital role undertaken by telemetry in monitoring and assessment in flood control in China. By analyzing the data from their surveys, the authors give an all-round exposition of problems in th... This article expounds the vital role undertaken by telemetry in monitoring and assessment in flood control in China. By analyzing the data from their surveys, the authors give an all-round exposition of problems in the country’s drive for disaster reduction and propose countermeasures in the fight against the possible flood problems in the future. 展开更多
关键词 LAKE REMOTE-SENSING TECHNOLOGY IN FLOOD control IN CHINA FLOOD Pro
下载PDF
Controlling Floods to Benefit the People
11
作者 FU XIAOPING 《China Today》 2000年第9期34-34,共1页
关键词 controlling Floods to Benefit the People
下载PDF
Geological suitability of natural sponge body for the construction of sponge city——a case study of Shuanghe Lake district in Zhengzhou airport zone 被引量:1
12
作者 Yong-jun Su Hui Tang +4 位作者 Ai-min Wu Xue-ping Dai Shuang Liu Hong-wei Liu Heng Kuang 《Journal of Groundwater Science and Engineering》 2023年第2期146-157,共12页
Natural and geological environmental conditions have an important impact on the planning and construction of sponge cities.This paper analyzes geological factors that influence the usage of natural sponge bodies,takin... Natural and geological environmental conditions have an important impact on the planning and construction of sponge cities.This paper analyzes geological factors that influence the usage of natural sponge bodies,taking the Shuanghe lake district of Zhengzhou airport zone as an example.An evaluation system with seven factors has been established and the weights of these factors are determined using the analytic hierarchy process(AHP)method.Overlay analysis is then carried out on all factors using GIS to evaluate the geological suitability of the construction of the sponge city.The results show that geologically suitable area for city construction in Shuanghe lake district accounts for 12.3%,relatively suitable area accounts for 76.1%,and relatively unsuitable area accounts for 11.6%.For suitable and relatively suitable areas,we should make full use of the advantages of surface infiltration,vadose zone transportation and aquifer storage to build a sponge city infrastructure with geological engineering as the main component,supplemented by engineering measures such as surface water storage and drainage,and jointly establish a sustainable urban hydrological cycle.For less suitable areas,artificial rain and flood control works,such as roof garden,should be considered.The findings of this paper can serve as an important reference for sponge city planning and construction not only in the research area but also in other regions with similar geological conditions. 展开更多
关键词 Natural sponge bodies Low impact development Rain flood control Hierarchy analysis
下载PDF
Flood risk assessment of check dams in the Wangmaogou watershed on the Loess Plateau of China
13
作者 GAO Ze-chao SHI Peng +4 位作者 LI Zhan-bin LI Peng BAI Lu-lu JIA Yi-li CUI Lin-zhou 《Journal of Mountain Science》 SCIE CSCD 2023年第12期3631-3647,共17页
Check dams have been widely used in China’s Loess Plateau region due to their effectiveness in erosion and flood control.However,the safety and stability of the check dam decrease with the operation process,which inc... Check dams have been widely used in China’s Loess Plateau region due to their effectiveness in erosion and flood control.However,the safety and stability of the check dam decrease with the operation process,which increases the probability of dam failure during flood events and threatens local residents’ life and property.Thus,this study simulated flood process of the check dam failure in the Wangmaogou watershed in Yulin City,Shaanxi Province,China,calculated different types of inundation losses based on the flood inundation area within the watershed,and determined the number of key flood protection check dams by classifying the flood risk levels of the check dams.The results showed that 5 dams in the watershed were subject to overtopping during different rainfall return periods,which was related to their flood discharge capacity.Dam failure flood process showed a rapid growth trend followed by slow decrease,and the time of flood peak advanced with increase in the return period.After harmonization of evaluation scales,the magnitude of flood inundation losses can be ranked as:economic losses(212.409 million yuan) > life losses(10.368 million yuan) > ecological losses(6.433 million yuan).The risk value for both individual dams and the whole dam system decreases as the return period increases.The number of key flood protection check dams in the Wangmaogou watershed was 2,3,3,3,4,and 5 for floods with return periods of 10,20,30,50,100,and 200 years,respectively.The results provided a theoretical basis for the safe operation and risk evaluation of check dams in the Loess Plateau Hills watershed. 展开更多
关键词 Check dam Return period Flood control risk Dam failure Inundation loss
下载PDF
Hydrological response to climate change and human activities:A case study of Taihu Basin,China 被引量:7
14
作者 Juan Wu Zhi-yong Wu +2 位作者 He-juan Lin Hai-ping Ji Min Liu 《Water Science and Engineering》 EI CAS CSCD 2020年第2期83-94,共12页
Climate change and human activities have changed a number of characteristics of river flow in the Taihu Basin.Based on long-term time series of hydrological data from 1986 to 2015,we analyzed variability in precipitat... Climate change and human activities have changed a number of characteristics of river flow in the Taihu Basin.Based on long-term time series of hydrological data from 1986 to 2015,we analyzed variability in precipitation,water stage,water diversion from the Yangtze River,and net inflow into Taihu Lake with the Mann-Kendall test.The non-stationary relationship between precipitation and water stage was first analyzed for the Taihu Basin and the Wuchengxiyu(WCXY)sub-region.The optimized regional and urban regulation schemes were explored to tackle high water stage problems through the hydrodynamic model.The results showed the following:(1)The highest,lowest,and average Taihu Lake water stages of all months had increasing trends.The total net inflow into Taihu Lake from the Huxi(HX)sub-region and the Wangting Sluice increased significantly.(2)The Taihu Lake water stage decreased much more slowly after 2002;it was steadier and higher after 2002.After the construction of Wuxi urban flood control projects,the average water stage of the inner city was 0.16e0.40 m lower than that of suburbs in the flood season,leading to the transfer of flooding in inner cities to suburbs and increasing inflow from HX into Taihu Lake.(3)The regional optimized schemes were more satisfactory in not increasing the inner city flood control burden,thereby decreasing the average water stage by 0.04e0.13 m,and the highest water stage by 0.04e0.09 m for Taihu Lake and the sub-region in the flood season.Future flood control research should set the basin as the basic unit.Decreasing diversion and drainage lines along the Yangtze River can take an active role in flood control. 展开更多
关键词 Hydrological response Climate change Human activities Flood control Mann-Kendall test Taihu Basin
下载PDF
Problems of Shoal Wetland and Riverfront Greening in China and Solutions:A Case Study of Zhejiang Province
15
作者 ZHANG Yunsheng LOU Yihui 《Journal of Landscape Research》 2017年第1期41-43,共3页
Shoal wetland and riverfront greening are important contents of "afforestation for flood control",in addition to increasing shoal wetland biodiversity and waterscapes,they can also restore and improve coasta... Shoal wetland and riverfront greening are important contents of "afforestation for flood control",in addition to increasing shoal wetland biodiversity and waterscapes,they can also restore and improve coastal ecological environment,and broaden the green area on the plain effectively. Through analyzing problems of shoal wetland and riverfront greening in Zhejiang Province,this paper took successful cases for example to propose the ideas for implementing plain greening effectively,such as "afforestation for flood control","landscaping construction is an ecological infrastructure project","plan wetland greening according to actual conditions","promote wetland greening by enhancing the cooperation among relevant departments","adopt multiple measures to enhance riverfront greening". 展开更多
关键词 Plain greening Shoal wetland Riverfront greening Afforestation for flood control COUNTERMEASURE
下载PDF
Characteristics of Rainstorm and Flood Disaster in Shaoyang City and Flood Protection Countermeasures
16
作者 Tang Zuoyang Lv Weiwei +2 位作者 Lv Xiaohua Tang Yaqiong Tan Dequan 《Meteorological and Environmental Research》 CAS 2018年第3期75-78,82,共5页
Based on ground meteorological observation data at 10 representative stations of Shaoyang City during 1951-2017 and rainfall data at over 220 automatic weather stations during 2005-2017,statistical analysis on rainsto... Based on ground meteorological observation data at 10 representative stations of Shaoyang City during 1951-2017 and rainfall data at over 220 automatic weather stations during 2005-2017,statistical analysis on rainstorm and flood disaster in Shaoyang was conducted. Occurrence characteristics and rule of rainstorm and flood disaster were found,and disaster situation was evaluated and analyzed. The results showed that( 1)there was almost local rainstorm and flood in Shaoyang City every year,with strong seasonal characteristic.( 2) The loss caused by rainstorm and flood disaster was the most serious in various meteorological disasters.( 3) Rainstorm and flood disaster generally had the sudden and devastating characteristics. Via the analysis and research on rainstorm and flood disaster,defense measure and countermeasure of rainstorm and flood were proposed,which could provide scientific decision basis for party and government leading flood relief,and had important guidance significance for preventing and mitigating disasters by government agencies. 展开更多
关键词 RAINSTORM Flood disaster Urban flood control Flood control measures and countermeasures
下载PDF
Principles of Landscape Ecology in the Construction of Hydro-ecological Civilized City
17
作者 YANG Kang 《Journal of Landscape Research》 2020年第5期90-93,共4页
Against the backdrop of global urbanization,ecological civilization problems have become increasingly prominent,among which water ecological civilization has been a focus of researches for being closely tied with urba... Against the backdrop of global urbanization,ecological civilization problems have become increasingly prominent,among which water ecological civilization has been a focus of researches for being closely tied with urban life.Under the context of constructing water ecological civilization,this paper from the perspective of landscape ecological planning analyzed the connection of river and lake water systems,construction of fl ood and water diversion project,water pollution control,water ecological conservation and ecological river construction,based on different water ecological construction objectives;explored how to support landscape planning by fully using landscape ecological principles and landscape indexes;fi nally proposed to design more delicate objective-based landscape indexes and the overall landscape index model for water ecological construction. 展开更多
关键词 Water ecological civilization Landscape ecology Urban planning Rainfall flood control POLLUTION Ecological restoration
下载PDF
Prospects for High-quality Development of Water Resources
18
作者 Liusheng PENG 《Meteorological and Environmental Research》 CAS 2021年第6期43-47,52,共6页
The water resources of rivers and reservoirs with a five-meter drop are used to discuss the technical theory and the cost and practical value of equipment cases.The high-quality development technology of water resourc... The water resources of rivers and reservoirs with a five-meter drop are used to discuss the technical theory and the cost and practical value of equipment cases.The high-quality development technology of water resources explored in this paper provides a feasible plan for achieving the goal of innovation to zero. 展开更多
关键词 Flood control Drought resistance Energy storage Low-head high-efficiency power generation High-speed water transfer channel Sewage treatment by vertical pipeline pressurization
下载PDF
Three Gorges Project Withstanding 2010 Peak Floods
19
作者 王儒述 《三峡论坛》 2010年第5期13-18,共6页
The Three Gorges Project(TGP) on the Yangtze River(YR) is the largest hydro-power project in the world;it is now attracting the world wide attention.Possessing comprehensive utilization benefits mainly for flood contr... The Three Gorges Project(TGP) on the Yangtze River(YR) is the largest hydro-power project in the world;it is now attracting the world wide attention.Possessing comprehensive utilization benefits mainly for flood control,power generation and navigation improvement,TGP is a vital and important project in harnessing and developing the YR.The Project primarily aims at flood control whose reservoir has a total storage capacity of 39.3 billion m3,22.15 billion m3 of which can be set for flood control.Construction of the project has greatly improved the flood control capacity in the middle and lower sections of the YR.In 2010 TGP has successfully withstood 3 peak floods,especially the one on July 20 with a frequency of once in 20-year,the largest since the construction of TGP.TGP as an eco-environmental project will be beneficial to ecological and environmental protection and low carbon economy and it will accelerate coordination of the economy,society,resources and environment and sustainable development along the valley,as well as the rapid development of Chinese economy. 展开更多
关键词 TGP peak floods capacity flood control
下载PDF
A new era of flood control strategies from the perspective of managing the 2020 Yangtze River flood 被引量:4
20
作者 Jun XIA Jin CHEN 《Science China Earth Sciences》 SCIE EI CSCD 2021年第1期1-9,共9页
Flood control of the Yangtze River is an important part of China’s national water security.In July 2020,due to continuous heavy rainfall,the water levels along the middle-lower reaches of the Yangtze River and major ... Flood control of the Yangtze River is an important part of China’s national water security.In July 2020,due to continuous heavy rainfall,the water levels along the middle-lower reaches of the Yangtze River and major lakes constantly exceeded the warning levels,in which Taihu Lake exceeded its highest safety water level and some stations of Poyang Lake reached their highest water levels in its history.In August 2020,another huge flood occurred in the Minjiang River and the Jialing River in the upper Yangtze River,and some areas of Chongqing Municipality and other cities along the rivers were inundated,resulting in great pressure on flood control and high disaster losses.The 2020 Yangtze River flood has received extensive media coverage and raised concerns on the roles of the Three Gorges Dam and other large reservoirs in flood control.Here we analyze the changes in the pattern of the Yangtze River flood control by comparing the strategies to tackle the three heavy floods occurring in 1954,1998,and 2020.We propose that the overall strategy of the Yangtze River flood control in the new era should adhere to the principle of"Integration of storage and drainage over the entire Yangtze River Basin,with draining floods downstream as the first priority"by using both engineering and non-engineering measures.On the basis of embankments,the engineering measures should use the Three Gorges Dam and other large reservoirs as the major regulatory means,promote the construction of key flood detention areas,keep the floodways clear,and maintain the ecosystem services of wetlands and shoals.In terms of non-engineering measures,we should strengthen adaptive flood risk management under climate change,standardize the use of lands in flood detention areas,give space to floods,and promote the implementation of flood risk maps and flood insurance policies.The ultimate goal of this new flood control system is to enhance the adaptability to frequent floods and increase the resilience to extreme flood disasters. 展开更多
关键词 The 2020 Yangtze River flood Yangtze River Flood control System Three Gorges Dam Protection of wetlands and shoals Non-engineering measures