The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circu...The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circuit of soft switching arc welding inverter power source. However, when the duty ratio of leading leg was reduced to zero, the output power stayed the constant value instead of becoming zero. The working status and waveforms of some major parameters were studied in this paper while the duty ratio of leading leg was zero. It was concluded that the minimum output power of soft switching inverter was related to the charging voltage of paraUel capacitors, and the output power also could be reduced by reducing the duty ratio of lagging leg. A novel two-stage continuous PWM control method that could switch working-mode between full bridge and half bridge was put forward in this paper. This kind of control method could further reduce the output power of soft switching inverter in order to meet the requirement of low heat input of sheet metal welding.展开更多
The 2D digital simplified flow valve is composed of a pilot-operated valvedesigned with both rotary and linear motions of a single spool, and a stepper motor under continualcontrol. How the structural parameters affec...The 2D digital simplified flow valve is composed of a pilot-operated valvedesigned with both rotary and linear motions of a single spool, and a stepper motor under continualcontrol. How the structural parameters affect the static and dynamic characteristics of the valve isfirst clarified and a criterion for stability is presented. Experiments are designed to test theperformance of the valve. It is necessary to establish a balance between the static and dynamiccharacteristics in deciding the structural parameters. Nevertheless, it is possible to maintain thedynamic response at a fairly high level, while keeping the leakage of the pilot stage at anacceptable level. One of the features of the digital valve is stage control. In stage control thenonlinearities, such as electromagnetic saturation and hysteresis, are greatly reduced. To a largeextent the dynamic response of the valve is decided by the executing cycle of the control algorithm.展开更多
Based on in-mine instrumentation and theoretical analysis of the unsymmetrical large-deformation that occurred in the roadway after excavation,Differential Floor Heave(DFH)was found to be the main reason for roadway f...Based on in-mine instrumentation and theoretical analysis of the unsymmetrical large-deformation that occurred in the roadway after excavation,Differential Floor Heave(DFH)was found to be the main reason for roadway failure.It needs to be pointed out that the specific roadway was driven in inclined rock strata.In addition,the factors that contribute to the occurrence of DFH are discussed in detail.It is believed that DFH is triggered by the unsymmetrical stress distribution in the floor and the different rock types encountered near the two floor corners.Hence,DFH control should be focused on the left floor corner where shearing failure occurs initially and the left floor surface where tensile failure is more severe.The proposed DFH control strategies include unsymmetrical grouting for the whole roadway,re-design of the roof and ribs support,reinforcement of the weak zones,and release of the concentrated stress in the earlier stage.Meanwhile,it is recommended that in the later stage,both bolts and cable bolts with higher strength and the backfilling technique using the coal measure rocks and concrete should be employed in the reversed-arch floor.The field instrumentation results,after using the proposed control strategies,indicate that large deformation in a DFH roadway has been successfully controlled.展开更多
As the excavation of roadway, new fractures will be formed and the pre-existing fractures extend with the redistribution of stress in surrounding rocks. Eventually, fracture zone and bed separation are formed in rocks...As the excavation of roadway, new fractures will be formed and the pre-existing fractures extend with the redistribution of stress in surrounding rocks. Eventually, fracture zone and bed separation are formed in rocks because of the developed fractures. Therefore, mastering the fracture evolution of surrounding rocks is very important to maintain the stability of roadway. The surrounding rocks of main haulage road- way in a certain coal mine is so broken and loose that the supporting is very difficult. Based on compre- hensive anal[ysis of the engineering geological conditions, a sight instrument was used to observe the fractures of internal surrounding rocks, Four indices, i.e., the width of fracture zone W, the number of fractures n, the width of fractures d and rock fracture designation RFD, are put forward to evaluate the fracture dewelopment. According to the evolution rules of the soft rock roadway from this paper, control principles by stages and by regions are presented through the research. At the same time, the best time of grouting reinforcement is determined on the basis of fracture saturation. Field practice shows that the roadway can satisfy normal production during service periods by suitable first support and grouting reinforcement.展开更多
Excavation-and-support induced disturbances are likely to make water-enriched roofs to become weathered and fractured.The development and connection of cracks provide new water channels which may result in water loss,...Excavation-and-support induced disturbances are likely to make water-enriched roofs to become weathered and fractured.The development and connection of cracks provide new water channels which may result in water loss,seriously affecting the in-tegrity and stability of roofs,leading to incidents of roof fall.Control of water-enriched rocks surrounding coal drifts is quite diffi-cult in China.Based on the practical situation of a water-enriched roof of a coal drift in working face 112201 of the Meihuajing coal mine,we studied the deformation features of surrounding rocks and the development of fractured areas and analyzed the major reasons for the decrease in load-carrying capacity,indicating that the key to maintain roof stability of this kind of coal drift is water retention.In addition,we proposed a staged control technology consisting of:1) surface grouting;2) cable anchor strengthening and 3) roof grouting,which has proven to be successful in this practical application.Our study indicates that,after the problem of water loss from the water-enriched roof had been effectively solved,a combined support system with high performance bolts can maintain the stability of the bearing structure,resulting in the control of roof stability in this kind of coal drift.展开更多
To enhance the system damping,a permanent magnet set which served as an eddy current damper was added to the magnetic levitation positioning stage which consists of a moving table,four Halbach permanent magnetic array...To enhance the system damping,a permanent magnet set which served as an eddy current damper was added to the magnetic levitation positioning stage which consists of a moving table,four Halbach permanent magnetic arrays,four stators and displacement sensors.The dynamics model of this stage was a complex nonlinear,strong coupling system which made the control strategy to be a focus research.The nonlinear controller of the system was proposed based on the theory of differential geometry.Both simulation and experimental results show that either the decoupling control of the movement can be realized in horizontal and vertical directions,and the control performance was improved by the damper,verifying the validity and efficiency of this method.展开更多
文摘The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circuit of soft switching arc welding inverter power source. However, when the duty ratio of leading leg was reduced to zero, the output power stayed the constant value instead of becoming zero. The working status and waveforms of some major parameters were studied in this paper while the duty ratio of leading leg was zero. It was concluded that the minimum output power of soft switching inverter was related to the charging voltage of paraUel capacitors, and the output power also could be reduced by reducing the duty ratio of lagging leg. A novel two-stage continuous PWM control method that could switch working-mode between full bridge and half bridge was put forward in this paper. This kind of control method could further reduce the output power of soft switching inverter in order to meet the requirement of low heat input of sheet metal welding.
基金This project is supported by National Natural Science Foundation of China (No.50075082).
文摘The 2D digital simplified flow valve is composed of a pilot-operated valvedesigned with both rotary and linear motions of a single spool, and a stepper motor under continualcontrol. How the structural parameters affect the static and dynamic characteristics of the valve isfirst clarified and a criterion for stability is presented. Experiments are designed to test theperformance of the valve. It is necessary to establish a balance between the static and dynamiccharacteristics in deciding the structural parameters. Nevertheless, it is possible to maintain thedynamic response at a fairly high level, while keeping the leakage of the pilot stage at anacceptable level. One of the features of the digital valve is stage control. In stage control thenonlinearities, such as electromagnetic saturation and hysteresis, are greatly reduced. To a largeextent the dynamic response of the valve is decided by the executing cycle of the control algorithm.
基金financially supported by the National Natural Science Foundation of China (Nos.51204166 and 51174195)the Graduate Student Research Innovation Project of Ordinary University in Jiangsu Province (2013) (No.CXLX13_952)
文摘Based on in-mine instrumentation and theoretical analysis of the unsymmetrical large-deformation that occurred in the roadway after excavation,Differential Floor Heave(DFH)was found to be the main reason for roadway failure.It needs to be pointed out that the specific roadway was driven in inclined rock strata.In addition,the factors that contribute to the occurrence of DFH are discussed in detail.It is believed that DFH is triggered by the unsymmetrical stress distribution in the floor and the different rock types encountered near the two floor corners.Hence,DFH control should be focused on the left floor corner where shearing failure occurs initially and the left floor surface where tensile failure is more severe.The proposed DFH control strategies include unsymmetrical grouting for the whole roadway,re-design of the roof and ribs support,reinforcement of the weak zones,and release of the concentrated stress in the earlier stage.Meanwhile,it is recommended that in the later stage,both bolts and cable bolts with higher strength and the backfilling technique using the coal measure rocks and concrete should be employed in the reversed-arch floor.The field instrumentation results,after using the proposed control strategies,indicate that large deformation in a DFH roadway has been successfully controlled.
基金provided by the National Natural Science Foundation of China (No. 50974118)the Program for New Century Excellent Talents in University (No. NCET-09-0727)+1 种基金the Program for Post graduates Research Innovation in Universities of Jiangsu Province (No. CX10B_149Z)the Priority Academic Program Development of Jiangsu Higher Education Institutions and the State Key Laboratory of Coal Resources and Mine Safety (No.SKLCRSM08X04)
文摘As the excavation of roadway, new fractures will be formed and the pre-existing fractures extend with the redistribution of stress in surrounding rocks. Eventually, fracture zone and bed separation are formed in rocks because of the developed fractures. Therefore, mastering the fracture evolution of surrounding rocks is very important to maintain the stability of roadway. The surrounding rocks of main haulage road- way in a certain coal mine is so broken and loose that the supporting is very difficult. Based on compre- hensive anal[ysis of the engineering geological conditions, a sight instrument was used to observe the fractures of internal surrounding rocks, Four indices, i.e., the width of fracture zone W, the number of fractures n, the width of fractures d and rock fracture designation RFD, are put forward to evaluate the fracture dewelopment. According to the evolution rules of the soft rock roadway from this paper, control principles by stages and by regions are presented through the research. At the same time, the best time of grouting reinforcement is determined on the basis of fracture saturation. Field practice shows that the roadway can satisfy normal production during service periods by suitable first support and grouting reinforcement.
基金Projects 50674085 supported by the Qing Lan Project of Jiangsu Provicne50774077 by the National Natural Science Foundation of China
文摘Excavation-and-support induced disturbances are likely to make water-enriched roofs to become weathered and fractured.The development and connection of cracks provide new water channels which may result in water loss,seriously affecting the in-tegrity and stability of roofs,leading to incidents of roof fall.Control of water-enriched rocks surrounding coal drifts is quite diffi-cult in China.Based on the practical situation of a water-enriched roof of a coal drift in working face 112201 of the Meihuajing coal mine,we studied the deformation features of surrounding rocks and the development of fractured areas and analyzed the major reasons for the decrease in load-carrying capacity,indicating that the key to maintain roof stability of this kind of coal drift is water retention.In addition,we proposed a staged control technology consisting of:1) surface grouting;2) cable anchor strengthening and 3) roof grouting,which has proven to be successful in this practical application.Our study indicates that,after the problem of water loss from the water-enriched roof had been effectively solved,a combined support system with high performance bolts can maintain the stability of the bearing structure,resulting in the control of roof stability in this kind of coal drift.
基金Supported by the National Natural Science Foundation of China (60674052)
文摘To enhance the system damping,a permanent magnet set which served as an eddy current damper was added to the magnetic levitation positioning stage which consists of a moving table,four Halbach permanent magnetic arrays,four stators and displacement sensors.The dynamics model of this stage was a complex nonlinear,strong coupling system which made the control strategy to be a focus research.The nonlinear controller of the system was proposed based on the theory of differential geometry.Both simulation and experimental results show that either the decoupling control of the movement can be realized in horizontal and vertical directions,and the control performance was improved by the damper,verifying the validity and efficiency of this method.