Although the Cramer-Rao Bound(CRB) can be used as the benchmark of estimation algorithm performance,it's too complicated for joint training sequence(TS) design for multiple input multiple output(MIMO) orthogonal f...Although the Cramer-Rao Bound(CRB) can be used as the benchmark of estimation algorithm performance,it's too complicated for joint training sequence(TS) design for multiple input multiple output(MIMO) orthogonal frequency division multiplexing(OFDM) coordination on multiple point(CoMP) systems.So a minimum mean square error(MSE) based sub-optimal sequence design criterion was proposed,including ideal sequence correlation property and sequence length constraint.The simulation results verify the theory analysis.展开更多
Deployment of buoy systems is one of the most important procedures for the operation of buoy system. In the present study, a single-point mooring buoy system which contains surface buoy, cable segments with components...Deployment of buoy systems is one of the most important procedures for the operation of buoy system. In the present study, a single-point mooring buoy system which contains surface buoy, cable segments with components, anchor and so on is modeled by applying multi-body dynamics method. The motion equations are developed in discrete node description and fully Cartesian coordinates. Then numerical method is used to solve the ordinary differential equations and dynamics simulations are achieved while anchor is casting from board. The trajectories and velocities of different nodes without current and with current in buoy system are obtained. The transient tension force of each part of the cable is analyzed in the process of deployment. Numerical results indicate that the transient payload increases to a peak value when the anchor is touching the seabed and the maximum tension force will vary with different floating configuration. This work is helpful for design and deployment planning of buoy system.展开更多
为提高LTE-Advanced系统小区边缘用户的吞吐量和用户体验,在现有协作多点传输(Coordinated Multi-Point,CoMP)方案基础上提出了两种CoMP系统的单频网(Sin-gle Frequency Network,SFN)预编码改进算法,以改善传统SFN预编码中信道合并的不...为提高LTE-Advanced系统小区边缘用户的吞吐量和用户体验,在现有协作多点传输(Coordinated Multi-Point,CoMP)方案基础上提出了两种CoMP系统的单频网(Sin-gle Frequency Network,SFN)预编码改进算法,以改善传统SFN预编码中信道合并的不确定性问题.第一种改进算法在发射端的部分传输节点处引入一个便于信道合并的相位参数,并按照合并后信道增益最大的准则确定相位参数的取值;第二种改进算法令部分传输节点的发射数据映射到天线时进行交换操作,同样按照信道增益最大准则确定交换方式.仿真结果表明,两种改进算法能有效提高小区边缘用户的谱效率,且能适用于相干/非相干信道及低/高秩信道的情况.展开更多
基金International Science&Technology Cooperation Projects of Qinghai,China(Nos.2013-H-811,2014-HZ-821)Chunhui Plan Projects,China(Nos.Z2014013,Z2014014)
文摘Although the Cramer-Rao Bound(CRB) can be used as the benchmark of estimation algorithm performance,it's too complicated for joint training sequence(TS) design for multiple input multiple output(MIMO) orthogonal frequency division multiplexing(OFDM) coordination on multiple point(CoMP) systems.So a minimum mean square error(MSE) based sub-optimal sequence design criterion was proposed,including ideal sequence correlation property and sequence length constraint.The simulation results verify the theory analysis.
基金supported by the National Natural Science Foundation of China (Grant No. 51175484)the Science Foundation of Shandong Province (Grant No. ZR2010EM052)
文摘Deployment of buoy systems is one of the most important procedures for the operation of buoy system. In the present study, a single-point mooring buoy system which contains surface buoy, cable segments with components, anchor and so on is modeled by applying multi-body dynamics method. The motion equations are developed in discrete node description and fully Cartesian coordinates. Then numerical method is used to solve the ordinary differential equations and dynamics simulations are achieved while anchor is casting from board. The trajectories and velocities of different nodes without current and with current in buoy system are obtained. The transient tension force of each part of the cable is analyzed in the process of deployment. Numerical results indicate that the transient payload increases to a peak value when the anchor is touching the seabed and the maximum tension force will vary with different floating configuration. This work is helpful for design and deployment planning of buoy system.
文摘为提高LTE-Advanced系统小区边缘用户的吞吐量和用户体验,在现有协作多点传输(Coordinated Multi-Point,CoMP)方案基础上提出了两种CoMP系统的单频网(Sin-gle Frequency Network,SFN)预编码改进算法,以改善传统SFN预编码中信道合并的不确定性问题.第一种改进算法在发射端的部分传输节点处引入一个便于信道合并的相位参数,并按照合并后信道增益最大的准则确定相位参数的取值;第二种改进算法令部分传输节点的发射数据映射到天线时进行交换操作,同样按照信道增益最大准则确定交换方式.仿真结果表明,两种改进算法能有效提高小区边缘用户的谱效率,且能适用于相干/非相干信道及低/高秩信道的情况.