With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy ...In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy system,competition among supply chain enterprises has intensified.The traditional procurement management model is no longer able to meet the needs of enterprise development in the current era.As a result,procurement management based on supply chain management has emerged,offering significant improvements in the scientific management of procurement processes.It has become an important means of promoting the long-term development of enterprises.This paper primarily analyzes and studies procurement cost control based on supply chain management,providing insights for reference.展开更多
With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, t...With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, the hotel companies do not pay attention to cost control then it cannot be in the fierce competition in the market to obtain long-term development. This paper will describe the cost control in the hotel financial management, emphasize the importance and function of cost control in hotel management, reveal the existing problems of hotel cost control, and actively explore the strategy of strengthening cost control.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping ...Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
This paper investigates the cost control problem of congestion management model in the real-time power systems. An improved optimal congestion cost model is built by introducing the congestion factor in dealing with t...This paper investigates the cost control problem of congestion management model in the real-time power systems. An improved optimal congestion cost model is built by introducing the congestion factor in dealing with the cases: opening the generator side and load side simultaneously. The problem of real-time congestion management is transformed to a nonlinear programming problem. While the transmission congestion is maximum, the adjustment cost is minimum based on the ant colony algorithm, and the global optimal solu-tion is obtained. Simulation results show that the improved optimal model can obviously reduce the adjust-ment cost and the designed algorithm is safe and easy to implement.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of inf...Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of information technology and advanced healthcare solutions,the emergence of smart hospitals represents a new trend in the medical industry’s evolution.Leveraging modern information technology can enhance the development of hospital IT systems and drive budget management toward greater intelligence.This paper begins by analyzing the influence of smart hospitals on hospital budget control.It then examines the current state of budget management control within smart hospitals.Finally,it proposes several strategies for budget management control in smart hospitals,aiming to provide guidance for relevant stakeholders.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating r...Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating room management was adopted from July 2019 to June 2020,and specialized group management was adopted from July 2020 to June 2021.The surgeon’s satisfaction,surgical nurses’core professional competence,and surgical patients’satisfaction were obtained through surveys and the results were analyzed.Results:Surgeon satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Besides,surgical nurses’core professional competency scores before the implementation of specialized group management were significantly lower than after its implementation(P<0.05).Lastly,surgical patients’satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Conclusion:Specialized group management helps to improve the quality of perioperative care and should be applied in clinical practice.展开更多
Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems a...Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project.展开更多
Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in deve...Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.展开更多
Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization sup...Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization supply center from January 2021 to January 2023.The work situation before January 31,2022,was classified as the control group;a routine quality control management model was implemented,and the work situation after January 31,2022,was classified as the observation group.The quality of medical device management and department satisfaction between the two groups were compared.Results:The timely recovery and supply rate,classification and cleaning pass rate,disinfection pass rate,packaging pass rate,sterilization pass rate,and department satisfaction score in the observation group were all higher than those of the control group(P<0.05).Conclusion:Implementing a refined quality control management model in the sterilization supply center can improve the quality management level of medical devices and department satisfaction and is worthy of promotion.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect ...In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.展开更多
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cos...Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy system,competition among supply chain enterprises has intensified.The traditional procurement management model is no longer able to meet the needs of enterprise development in the current era.As a result,procurement management based on supply chain management has emerged,offering significant improvements in the scientific management of procurement processes.It has become an important means of promoting the long-term development of enterprises.This paper primarily analyzes and studies procurement cost control based on supply chain management,providing insights for reference.
文摘With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, the hotel companies do not pay attention to cost control then it cannot be in the fierce competition in the market to obtain long-term development. This paper will describe the cost control in the hotel financial management, emphasize the importance and function of cost control in hotel management, reveal the existing problems of hotel cost control, and actively explore the strategy of strengthening cost control.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘This paper investigates the cost control problem of congestion management model in the real-time power systems. An improved optimal congestion cost model is built by introducing the congestion factor in dealing with the cases: opening the generator side and load side simultaneously. The problem of real-time congestion management is transformed to a nonlinear programming problem. While the transmission congestion is maximum, the adjustment cost is minimum based on the ant colony algorithm, and the global optimal solu-tion is obtained. Simulation results show that the improved optimal model can obviously reduce the adjust-ment cost and the designed algorithm is safe and easy to implement.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of information technology and advanced healthcare solutions,the emergence of smart hospitals represents a new trend in the medical industry’s evolution.Leveraging modern information technology can enhance the development of hospital IT systems and drive budget management toward greater intelligence.This paper begins by analyzing the influence of smart hospitals on hospital budget control.It then examines the current state of budget management control within smart hospitals.Finally,it proposes several strategies for budget management control in smart hospitals,aiming to provide guidance for relevant stakeholders.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
基金Hebei University Affiliated Hospital Youth Fund Scientific Research Project Project Number:2019Q017。
文摘Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating room management was adopted from July 2019 to June 2020,and specialized group management was adopted from July 2020 to June 2021.The surgeon’s satisfaction,surgical nurses’core professional competence,and surgical patients’satisfaction were obtained through surveys and the results were analyzed.Results:Surgeon satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Besides,surgical nurses’core professional competency scores before the implementation of specialized group management were significantly lower than after its implementation(P<0.05).Lastly,surgical patients’satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Conclusion:Specialized group management helps to improve the quality of perioperative care and should be applied in clinical practice.
文摘Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project.
文摘Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.
文摘Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization supply center from January 2021 to January 2023.The work situation before January 31,2022,was classified as the control group;a routine quality control management model was implemented,and the work situation after January 31,2022,was classified as the observation group.The quality of medical device management and department satisfaction between the two groups were compared.Results:The timely recovery and supply rate,classification and cleaning pass rate,disinfection pass rate,packaging pass rate,sterilization pass rate,and department satisfaction score in the observation group were all higher than those of the control group(P<0.05).Conclusion:Implementing a refined quality control management model in the sterilization supply center can improve the quality management level of medical devices and department satisfaction and is worthy of promotion.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects.
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
基金University-level self-study project:Construction cost control research of finished house based on BIM-5D(Project No.2023xzky06)。
文摘Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.