From the perspective of a community energy operator,a two-stage optimal scheduling model of a community integrated energy system is proposed by integrating information on controllable loads.The day-ahead scheduling an...From the perspective of a community energy operator,a two-stage optimal scheduling model of a community integrated energy system is proposed by integrating information on controllable loads.The day-ahead scheduling analyzes whether various controllable loads participate in the optimization and investigates the impact of their responses on the operating economy of the community integrated energy system(IES)before and after;the intra-day scheduling proposes a two-stage rolling optimization model based on the day-ahead scheduling scheme,taking into account the fluctuation of wind turbine output and load within a short period of time and according to the different response rates of heat and cooling power,and solves the adjusted output of each controllable device.The simulation results show that the optimal scheduling of controllable loads effectively reduces the comprehensive operating costs of community IES;the two-stage optimal scheduling model can meet the energy demand of customers while effectively and timely suppressing the random fluctuations on both sides of the source and load during the intra-day stage,realizing the economic and smooth operation of IES.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
Abstract Most papers in scheduling research have treated individual job processing times as fixed parameters. However, in many practical situations, a manager may control processing time by reallocating resources. In ...Abstract Most papers in scheduling research have treated individual job processing times as fixed parameters. However, in many practical situations, a manager may control processing time by reallocating resources. In this paper, authors consider a machine scheduling problem with controllable processing times. In the first part of this paper, a special case where the processing times and compression costs are uniform among jobs is discussed. Theoretical results are derived that aid in developing an O(n 2) algorithm to slove the problem optimally. In the second part of this paper, authors generalize the discussion to general case. An effective heuristic to the general problem will be presented.展开更多
Information technologies play an important role in many business areas. One of these areas is hotel information system. Many operations, such as check-in, check-out, and food and beverage, are performed owing to infor...Information technologies play an important role in many business areas. One of these areas is hotel information system. Many operations, such as check-in, check-out, and food and beverage, are performed owing to information technologies. Package programs are used for managing hotel operations. Software provides reporting, filtering, remote accessing, and cost control services which are important key parameters of decision-making processes of hotel managers. Cost control is one of the most important operations in hotel management. Cost control service of package programs assists managers in monitoring overall cost and computing each department's partial cost and serves information to the different departments of hotels using information technologies. Cost control is important in the departments which are profitable in a hotel. Food and beverage is one of these profitable departments, which is the second profitable department in hotels. It makes profit between mostly 20% and 40%. This research aims to understand effects of information technologies during decision-making processes. The sample of study is food and beverage managers in five-star hotels in Istanbul. Questionnaire was applied to 45 participants.展开更多
This work studies the problem of control design for linear systems with input saturation.It is well known that integral quadratic constraints(IQC) can be used to describe input saturation and that the use of IQC in an...This work studies the problem of control design for linear systems with input saturation.It is well known that integral quadratic constraints(IQC) can be used to describe input saturation and that the use of IQC in analysis can lead to less conservative performance bound and larger domain of attraction.In this work,it is shown that a class of commonly used IQCs may not help in control synthesis.That is,the use of these IQCs does not enlarge the guaranteed domain of performance for synthesis.展开更多
基金supported in part by the National Natural Science Foundation of China(51977127)Shanghai Municipal Science and Technology Commission(19020500800)“Shuguang Program”(20SG52)Shanghai Education Development Foundation and Shanghai Municipal Education Commission.
文摘From the perspective of a community energy operator,a two-stage optimal scheduling model of a community integrated energy system is proposed by integrating information on controllable loads.The day-ahead scheduling analyzes whether various controllable loads participate in the optimization and investigates the impact of their responses on the operating economy of the community integrated energy system(IES)before and after;the intra-day scheduling proposes a two-stage rolling optimization model based on the day-ahead scheduling scheme,taking into account the fluctuation of wind turbine output and load within a short period of time and according to the different response rates of heat and cooling power,and solves the adjusted output of each controllable device.The simulation results show that the optimal scheduling of controllable loads effectively reduces the comprehensive operating costs of community IES;the two-stage optimal scheduling model can meet the energy demand of customers while effectively and timely suppressing the random fluctuations on both sides of the source and load during the intra-day stage,realizing the economic and smooth operation of IES.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘Abstract Most papers in scheduling research have treated individual job processing times as fixed parameters. However, in many practical situations, a manager may control processing time by reallocating resources. In this paper, authors consider a machine scheduling problem with controllable processing times. In the first part of this paper, a special case where the processing times and compression costs are uniform among jobs is discussed. Theoretical results are derived that aid in developing an O(n 2) algorithm to slove the problem optimally. In the second part of this paper, authors generalize the discussion to general case. An effective heuristic to the general problem will be presented.
文摘Information technologies play an important role in many business areas. One of these areas is hotel information system. Many operations, such as check-in, check-out, and food and beverage, are performed owing to information technologies. Package programs are used for managing hotel operations. Software provides reporting, filtering, remote accessing, and cost control services which are important key parameters of decision-making processes of hotel managers. Cost control is one of the most important operations in hotel management. Cost control service of package programs assists managers in monitoring overall cost and computing each department's partial cost and serves information to the different departments of hotels using information technologies. Cost control is important in the departments which are profitable in a hotel. Food and beverage is one of these profitable departments, which is the second profitable department in hotels. It makes profit between mostly 20% and 40%. This research aims to understand effects of information technologies during decision-making processes. The sample of study is food and beverage managers in five-star hotels in Istanbul. Questionnaire was applied to 45 participants.
文摘This work studies the problem of control design for linear systems with input saturation.It is well known that integral quadratic constraints(IQC) can be used to describe input saturation and that the use of IQC in analysis can lead to less conservative performance bound and larger domain of attraction.In this work,it is shown that a class of commonly used IQCs may not help in control synthesis.That is,the use of these IQCs does not enlarge the guaranteed domain of performance for synthesis.