In the continuous development of the modern highway and bridge engineering industry,the reasonable selection of mega highway bridges and their design is crucial.Based on this,this paper takes the actual bridge project...In the continuous development of the modern highway and bridge engineering industry,the reasonable selection of mega highway bridges and their design is crucial.Based on this,this paper takes the actual bridge project as an example,and analyses the overall selection design of such highway bridges,including the basic overview of the project,the basic selection principle of mega highway bridge project structure and its design strategy,etc.,to provide scientific reference for its selection design.展开更多
In order to describe an investigation of the flow around high-speed train on a bridge under cross winds using detached-eddy simulation(DES), a 1/8th scale model of a three-car high-speed train and a typical bridge mod...In order to describe an investigation of the flow around high-speed train on a bridge under cross winds using detached-eddy simulation(DES), a 1/8th scale model of a three-car high-speed train and a typical bridge model are employed, Numerical wind tunnel technology based on computational fluid dynamics(CFD) is used, and the CFD models are set as stationary models. The Reynolds number of the flow, based on the inflow velocity and the height of the vehicle, is 1.9×10~6. The computations are conducted under three cases, train on the windward track on the bridge(WWC), train on the leeward track on the bridge(LWC) and train on the flat ground(FGC). Commercial software FLUENT is used and the mesh sensitivity research is carried out by three different grids: coarse, medium and fine. Results show that compared with FGC case, the side force coefficients of the head cars for the WWC and LWC cases increases by 14% and 29%, respectively; the coefficients of middle cars for the WWC and LWC increase by 32% and 10%, respectively; and that of the tail car increases by 45% for the WWC whereas decreases by 2% for the LWC case. The most notable thing is that the side force and the rolling moment of the head car are greater for the LWC, while the side force and the rolling moment of the middle car and the tail car are greater for the WWC. Comparing the velocity profiles at different locations, the flow is significantly influenced by the bridge-train system when the air is close to it. For the three cases(WWC, LWC and FGC), the pressure on the windward side of train is mostly positive while that of the leeward side is negative. The discrepancy of train's aerodynamic force is due to the different surface area of positive pressure and negative pressure zone. Many vortices are born on the leeward edge of the roofs. Theses vortices develop downstream, detach and dissipate into the wake region. The eddies develop irregularly, leading to a noticeably turbulent flow at leeward side of train.展开更多
To determine the optimal length of the cross-bay bridge at the Tieshan Port and the impact of the bridge on the hydrological environment, a 2-D numerical model is adopted to calculate the variation of tidal level, tid...To determine the optimal length of the cross-bay bridge at the Tieshan Port and the impact of the bridge on the hydrological environment, a 2-D numerical model is adopted to calculate the variation of tidal level, tidal current field and tidal discharge caused by different lengths of the bridge.展开更多
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern...The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.展开更多
American poet, Walt Whitman and Harold Hart Crane both write poems about the place connecting Brooklyn and Manhattan, in Crossing Brooklyn Ferry and To Brooklyn Bridge respectively. By comparing the similarities of th...American poet, Walt Whitman and Harold Hart Crane both write poems about the place connecting Brooklyn and Manhattan, in Crossing Brooklyn Ferry and To Brooklyn Bridge respectively. By comparing the similarities of these two poems, this paper analyses the two poets’ attitudes towards the development of modern society, finding that both poets not only show admiration for modern society but also doubt about the fast development. It aims to reveal the influence of fast development of modern society on people’s mentality.展开更多
The non-stationary buffeting response of long span suspension bridge in time domain under strong wind loading is computed. Modeling method for generating non-stationary fluctuating winds with probabilistic model for n...The non-stationary buffeting response of long span suspension bridge in time domain under strong wind loading is computed. Modeling method for generating non-stationary fluctuating winds with probabilistic model for non-stationary strong wind fields is first presented. Non-stationary wind forces induced by strong winds on bridge deck and tower are then given a brief introduction. Finally,Non-stationary buffeting response of Pulite Bridge in China,a long span suspension bridge,is computed by using ANSYS software under four working conditions with different combination of time-varying mean wind and time-varying variance. The case study further confirms that it is necessity of considering non-stationary buffeting response for long span suspension bridge under strong wind loading,rather than only stationary buffeting response.展开更多
This paper summarizes the superiority of lead-rubber beating (LRB) continuous girder bridges. The research method for isolation performance is discussed when pile-soil interaction is considered. By the finite elemen...This paper summarizes the superiority of lead-rubber beating (LRB) continuous girder bridges. The research method for isolation performance is discussed when pile-soil interaction is considered. By the finite element method and self-compiling program, a systematic study of the reliability of LRB continuous girder bridges is given by the use of different indicators, including the riding comfort of the LRB system, the pounding and dynamic stability when the LRB system is subjected to seismic excitations, and the reliability of the LRB system when subjected to other common horizontal loads. The results show that the LRB system has obvious advantages over the traditional continuous girder structure. The LRB isolation effect remains good even when pile-soil interaction is considered; the vertical rigidity of the LRB guarantees desirable riding comfort. The LRB demonstrates good reliability when subjected to the effects of braking, wind loads and temperature. However, it is also pointed out that the pounding of the LRB system subjected to earthquakes must be avoided, and the dynamic stability may be reduced when the LRB system has higher piers and generates a larger displacement in a strong earthquake. Useful advice and guidance are proposed for engineering application.展开更多
In order to study the effect of temperature difference load (TDL) along the vertical direction of a simply supported beam bridge section on the vertical irregularity, a rail-bridge-piers calculation model was establ...In order to study the effect of temperature difference load (TDL) along the vertical direction of a simply supported beam bridge section on the vertical irregularity, a rail-bridge-piers calculation model was established. Taking 32 m simply supported box beam bridge which is widely used in the construction of pas- senger dedicated line in China as an example, influences of the temperature variation between the bottom and top of the bridge, temperature curve index, type of temperature gradient, and beam height on track vertical irregularity were analyzed with the model. The results show that TDL has more effects on long wave track irregularity than on short one, and the wavelength mainly affected is approxi- mately equal to the beam span. The amplitude of irregu- larity caused by TDL is largely affected by the temperature variation, temperature curve index, and type of temperature gradient, so it is necessary to monitor the temperaturedistribution of bridges in different regions to provide accurate calculation parameters. In order to avoid the irregularity exceeding the limit values, the height of 32, 48, and 64 m simply supported box beam bridges must not be less than 2.15, 3.2, and 4.05 m, respectively.展开更多
To probe the contributions of polar cortical cytoskeleton and the surface tension of daughter cells to intercellular bridge thinning dynamics during cytokinesis,we applied cytochalasin D(CD) or colchicine(COLC) in...To probe the contributions of polar cortical cytoskeleton and the surface tension of daughter cells to intercellular bridge thinning dynamics during cytokinesis,we applied cytochalasin D(CD) or colchicine(COLC) in a highly localized manner to polar regions of dividing normal rat kidney(NRK) cells.We observed cellular morphological changes and analyzed the intercellular bridge thinning trajectories of dividing cells with different polar cortical characteristics.Global blebbistatin(BS) application was used to obtain cells losing active contractile force groups.Our results show that locally released CD or colchicine at the polar region caused inhibition of cytokinesis before ingression.Similar treatment at phases after ingression allowed completion of cytokinesis but dramatically influenced the trajectories of intercellular bridge thinning.Disturbing single polar cortical actin induced transformation of the intercellular bridge thinning process,and polar cortical tension controlled deformation time of intercellular bridges.Our study provides a feasible framework to induce and analyze the effects of local changes in mechanical properties of cellular components on single cellular cytokinesis.展开更多
The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has...The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022.展开更多
文摘In the continuous development of the modern highway and bridge engineering industry,the reasonable selection of mega highway bridges and their design is crucial.Based on this,this paper takes the actual bridge project as an example,and analyses the overall selection design of such highway bridges,including the basic overview of the project,the basic selection principle of mega highway bridge project structure and its design strategy,etc.,to provide scientific reference for its selection design.
基金Project(U1534210)supported by the National Natural Science Foundation of ChinaProject(14JJ1003)supported by the Natural Science Foundation of Hunan Province,China+2 种基金Project(2015CX003)supported by the Project of Innovation-driven Plan in Central South University,ChinaProject(14JC1003)supported by the Natural Science Foundation of Hunan Province,ChinaProject(2015T002-A)supported by the Technological Research and Development program of China Railways Cooperation
文摘In order to describe an investigation of the flow around high-speed train on a bridge under cross winds using detached-eddy simulation(DES), a 1/8th scale model of a three-car high-speed train and a typical bridge model are employed, Numerical wind tunnel technology based on computational fluid dynamics(CFD) is used, and the CFD models are set as stationary models. The Reynolds number of the flow, based on the inflow velocity and the height of the vehicle, is 1.9×10~6. The computations are conducted under three cases, train on the windward track on the bridge(WWC), train on the leeward track on the bridge(LWC) and train on the flat ground(FGC). Commercial software FLUENT is used and the mesh sensitivity research is carried out by three different grids: coarse, medium and fine. Results show that compared with FGC case, the side force coefficients of the head cars for the WWC and LWC cases increases by 14% and 29%, respectively; the coefficients of middle cars for the WWC and LWC increase by 32% and 10%, respectively; and that of the tail car increases by 45% for the WWC whereas decreases by 2% for the LWC case. The most notable thing is that the side force and the rolling moment of the head car are greater for the LWC, while the side force and the rolling moment of the middle car and the tail car are greater for the WWC. Comparing the velocity profiles at different locations, the flow is significantly influenced by the bridge-train system when the air is close to it. For the three cases(WWC, LWC and FGC), the pressure on the windward side of train is mostly positive while that of the leeward side is negative. The discrepancy of train's aerodynamic force is due to the different surface area of positive pressure and negative pressure zone. Many vortices are born on the leeward edge of the roofs. Theses vortices develop downstream, detach and dissipate into the wake region. The eddies develop irregularly, leading to a noticeably turbulent flow at leeward side of train.
文摘To determine the optimal length of the cross-bay bridge at the Tieshan Port and the impact of the bridge on the hydrological environment, a 2-D numerical model is adopted to calculate the variation of tidal level, tidal current field and tidal discharge caused by different lengths of the bridge.
基金herein for allowing the use of various data from the LBJ Project in the development of this paper
文摘The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.
文摘American poet, Walt Whitman and Harold Hart Crane both write poems about the place connecting Brooklyn and Manhattan, in Crossing Brooklyn Ferry and To Brooklyn Bridge respectively. By comparing the similarities of these two poems, this paper analyses the two poets’ attitudes towards the development of modern society, finding that both poets not only show admiration for modern society but also doubt about the fast development. It aims to reveal the influence of fast development of modern society on people’s mentality.
基金Sponsored by the National Natural Science Foundation of China(Grant No.51408174)Anhui Provincial Natural Science Foundation(Grant No.1408085QE95)+1 种基金China Postdoctoral Science Foundation(Grant No.2013M540511 and 2015T80652)Key University Science Research Project of Anhui Province(Grant No.KJ2016A294)
文摘The non-stationary buffeting response of long span suspension bridge in time domain under strong wind loading is computed. Modeling method for generating non-stationary fluctuating winds with probabilistic model for non-stationary strong wind fields is first presented. Non-stationary wind forces induced by strong winds on bridge deck and tower are then given a brief introduction. Finally,Non-stationary buffeting response of Pulite Bridge in China,a long span suspension bridge,is computed by using ANSYS software under four working conditions with different combination of time-varying mean wind and time-varying variance. The case study further confirms that it is necessity of considering non-stationary buffeting response for long span suspension bridge under strong wind loading,rather than only stationary buffeting response.
基金The National Natural Science Foundation of China(No.51008134)
文摘This paper summarizes the superiority of lead-rubber beating (LRB) continuous girder bridges. The research method for isolation performance is discussed when pile-soil interaction is considered. By the finite element method and self-compiling program, a systematic study of the reliability of LRB continuous girder bridges is given by the use of different indicators, including the riding comfort of the LRB system, the pounding and dynamic stability when the LRB system is subjected to seismic excitations, and the reliability of the LRB system when subjected to other common horizontal loads. The results show that the LRB system has obvious advantages over the traditional continuous girder structure. The LRB isolation effect remains good even when pile-soil interaction is considered; the vertical rigidity of the LRB guarantees desirable riding comfort. The LRB demonstrates good reliability when subjected to the effects of braking, wind loads and temperature. However, it is also pointed out that the pounding of the LRB system subjected to earthquakes must be avoided, and the dynamic stability may be reduced when the LRB system has higher piers and generates a larger displacement in a strong earthquake. Useful advice and guidance are proposed for engineering application.
基金supported by the National Science Foundation (U1234201)the Doctorial Innovation Fund of Southwest Jiaotong University
文摘In order to study the effect of temperature difference load (TDL) along the vertical direction of a simply supported beam bridge section on the vertical irregularity, a rail-bridge-piers calculation model was established. Taking 32 m simply supported box beam bridge which is widely used in the construction of pas- senger dedicated line in China as an example, influences of the temperature variation between the bottom and top of the bridge, temperature curve index, type of temperature gradient, and beam height on track vertical irregularity were analyzed with the model. The results show that TDL has more effects on long wave track irregularity than on short one, and the wavelength mainly affected is approxi- mately equal to the beam span. The amplitude of irregu- larity caused by TDL is largely affected by the temperature variation, temperature curve index, and type of temperature gradient, so it is necessary to monitor the temperaturedistribution of bridges in different regions to provide accurate calculation parameters. In order to avoid the irregularity exceeding the limit values, the height of 32, 48, and 64 m simply supported box beam bridges must not be less than 2.15, 3.2, and 4.05 m, respectively.
基金supported by the National Natural Science Foundation of China (10672114)the Natural Science Foundation of Shanxi Province (2007011011)
文摘To probe the contributions of polar cortical cytoskeleton and the surface tension of daughter cells to intercellular bridge thinning dynamics during cytokinesis,we applied cytochalasin D(CD) or colchicine(COLC) in a highly localized manner to polar regions of dividing normal rat kidney(NRK) cells.We observed cellular morphological changes and analyzed the intercellular bridge thinning trajectories of dividing cells with different polar cortical characteristics.Global blebbistatin(BS) application was used to obtain cells losing active contractile force groups.Our results show that locally released CD or colchicine at the polar region caused inhibition of cytokinesis before ingression.Similar treatment at phases after ingression allowed completion of cytokinesis but dramatically influenced the trajectories of intercellular bridge thinning.Disturbing single polar cortical actin induced transformation of the intercellular bridge thinning process,and polar cortical tension controlled deformation time of intercellular bridges.Our study provides a feasible framework to induce and analyze the effects of local changes in mechanical properties of cellular components on single cellular cytokinesis.
文摘The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022.