As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con...As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.展开更多
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe...Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.展开更多
In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine und...In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine under attitude deflection, the jacking forces, the grouting pressure and the soil pressure. The analyses focused on the rebar stress in two statuses: (1) normal construction status without shield machine squeezing; (2) squeezing action induced by shield machine under attitude deflection. The analyses indicated that the rebar stress was evidently affected by the construction loads. In different construction status, the rebar stress ranges from -80 MPa to 50 MPa, and the rebar is in elastic status. Even some cracks appear on segments, the stress of segment rebar is still at a low level. It is helpful to incorporate a certain quantity of steel fiber to improve the anti-crack and shock resistance performance.展开更多
Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav...Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.展开更多
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est...Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.展开更多
By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. T...By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. The tunnel was in phyllite, shotcrete cracks and steel arch distortion were observed, and a big deformation with a maximum of 2.0 m was monitored during the initial stage of the construction. Through carefully examining the site observation and laboratory test results, a construction principle was established for the tunneling on the basic concept of maintaining the rock strength/stiffness and keeping the rock dry, by providing confinement pressure to the rock, reducing the rock exposure time, keeping water out of the tunnel, etc. To achieve the construction principle, a set of specific construction measures with 11 items was further proposed and applied to the construction. To check the effectiveness of the construction measures, field monitoring was carried out, which showed that the rock deformation was well controlled and the tunnel became stable. An allowable deformation was then determined using the Fenner formulae and the monitored data in order to guide further construction, which received a good result. From this study, it can be concluded that providing quick strong initial support and reserving core soil at the working faceare extremely important to control the rock deformation and keep the tunnel stable.展开更多
The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variat...The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variation patterns of advance geological prediction data, stress-strain data of supporting struc- tures, and deformation data of the surrounding rock are vitally important in assessing the rationality and reliability of construction schemes, and provide essential information to ensure the safety and scheduling of tunnel construction, However, as the quantity of these data increases significantly, the uncertainty and discreteness of the mass data make it extremely difficult to produce a reasonable con- struction scheme; they also reduce the forecast accuracy of accidents and dangerous situations, creating huge challenges in tunnel construction safety, In order to solve this problem, a novel data service system is proposed that uses data-association technology and the NATM, with the support of a big data environ- ment, This system can integrate data resources from distributed monitoring sensors during the construc- tion process, and then identify associations and build relations among data resources under the same construction conditions, These data associations and relations are then stored in a data pool, With the development and supplementation of the data pool, similar relations can then he used under similar con- ditions, in order to provide data references for construction schematic designs and resource allocation, The proposed data service system also provides valuable guidance for the construction of similar projects.展开更多
This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST...This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST(upper tunneling(UT)). For this, a modified Peck formula was proposed to predict the surface settlement induced by TST. Next, three sets of finite element analyses(FEA) were used to compare the effects of construction sequences(i.e. UT, middle tunneling(MT), and lower tunneling(LT)) on vertical and lateral ground displacements. The results of Tianjin case and UT reveal that compared to a Gaussian distribution for a single tunnel, the surface settlement curve of triple stacked tunnels is a bimodal distribution. It seems that the proposed modified Peck formula can effectively predict the surface settlement induced by TST. The results of the three sets of FEA demonstrate that the construction sequence has a significant influence on the ground movement. Among the three construction sequences, the largest lateral displacement is observed in the MT and the smallest one in UT.The existing tunnel has an inhibitory effect on the vertical displacement. The maximum value of the lateral displacement occurs at the depth of the new tunnel in each construction sequence.展开更多
Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainl...Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported.展开更多
Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study pr...Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications.展开更多
The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction ...The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction in the 21st century. Further suggestion is put forward on the effective use of tunneling machine.展开更多
In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel const...In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.展开更多
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surroun...Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency.展开更多
According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched ste...According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched steel tunnels in this area.展开更多
With the increase in the number and scale of tunnel projects in China in recent years,the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more...With the increase in the number and scale of tunnel projects in China in recent years,the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more and more attention.Based on this,this paper analyzes the comprehensive management of quality inspection and monitoring during tunnel construction to ensure the quality of tunnel construction.展开更多
In this paper, we conduct research on the causes and coping strategies of the land subsidence caused by the tunnel construction projects. We analyze the issues from the following of the perspectives. (1) Analysis me...In this paper, we conduct research on the causes and coping strategies of the land subsidence caused by the tunnel construction projects. We analyze the issues from the following of the perspectives. (1) Analysis method. To solve large scale system of the development of computer hardware and the numerical calculation method, we use the basic analysis to deal with it. (2) The empirical of methods. Ground motion is usually leads to the basic development of the inclined tunnel surface vertical displacement, the result of the movement process can turn to a settling tank. (3) Machine learning based approaches. In one of biggest difficulties when using neural network method is to obtain all possible parameters related to ground subsidence, we use the machine learning model to handle the challenge. In the final part, we show prospect for the future research, we will combine more numerical analysis tools to optimize the current methodology.展开更多
The biggest environmental problem caused by the construction of tunnels adjacent to high-rise buildings is the settlement of buildings.The paper analyzes the influence of tunnel excavation on the deformation of the su...The biggest environmental problem caused by the construction of tunnels adjacent to high-rise buildings is the settlement of buildings.The paper analyzes the influence of tunnel excavation on the deformation of the superstructure and the deformation mode of the superstructure.It introduces the indicators and standards for the construction control of tunnel adjacent to the building at home and abroad.Combined with the Yuzhong tunnel project under construction in Chongqing,the main monitoring indicators and control standards of the Yuzhong Tunnel passing through the main buildings are given after comprehensive analysis and considerations,which provide a reference for the deformation control indicators of similar urban traffic tunnels adjacent to high-rise buildings.展开更多
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass...Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction.展开更多
Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high ...Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high construction requirements.In view of the difficulties such as shallow buried depth of tunnel and small clear distance between tunnel and tower of high-voltage line,multiple excavation blasting method is adopted,and smooth blasting,charge quantity control and damping hole setting are comprehensively used to reduce the impact on the tower and structure of high-voltage line.In order to ensure the smooth progress of the project,the large-scale finite element analysis software is used to simulate the whole excavation project.The influence of the full-section method and the middle partition wall method(CD method)on the surrounding rock and the high-voltage electric tower is compared.It is found that the CD method can effectively control the displacement of the surrounding rock and the tower on it and the uneven settlement.展开更多
With the rapid development of the transportation industry in China,the number and scale of tunnel construction are increasing.Tunneling through fault zones and other complex geological environments is becoming more an...With the rapid development of the transportation industry in China,the number and scale of tunnel construction are increasing.Tunneling through fault zones and other complex geological environments is becoming more and more common.In the construction of highway tunnels,due to the special geographical environment and complex geological conditions,mud and water inrush often occur in the tunnel.Water inrush disasters pose a major risk to the construction of highway tunnels and affect the normal construction of highway tunnels.This paper combines the engineering background of the tunnel mud and water inrush accidents,carries out evaluation on the accident treatment measures and the treatment efficiency,and summarizes the main concerns in the construction process and the technical guidelines for dealing with the tunnel mud and water inrush.展开更多
文摘As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.
文摘Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.
文摘In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine under attitude deflection, the jacking forces, the grouting pressure and the soil pressure. The analyses focused on the rebar stress in two statuses: (1) normal construction status without shield machine squeezing; (2) squeezing action induced by shield machine under attitude deflection. The analyses indicated that the rebar stress was evidently affected by the construction loads. In different construction status, the rebar stress ranges from -80 MPa to 50 MPa, and the rebar is in elastic status. Even some cracks appear on segments, the stress of segment rebar is still at a low level. It is helpful to incorporate a certain quantity of steel fiber to improve the anti-crack and shock resistance performance.
基金Supported by National Natural Science Foundation of China(No.90815019)National Key Basic Research Program of China("973" Program,No.2007CB714101)Key Project in the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period(No.2006BAB04A13)
文摘Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.
文摘Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.
文摘By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. The tunnel was in phyllite, shotcrete cracks and steel arch distortion were observed, and a big deformation with a maximum of 2.0 m was monitored during the initial stage of the construction. Through carefully examining the site observation and laboratory test results, a construction principle was established for the tunneling on the basic concept of maintaining the rock strength/stiffness and keeping the rock dry, by providing confinement pressure to the rock, reducing the rock exposure time, keeping water out of the tunnel, etc. To achieve the construction principle, a set of specific construction measures with 11 items was further proposed and applied to the construction. To check the effectiveness of the construction measures, field monitoring was carried out, which showed that the rock deformation was well controlled and the tunnel became stable. An allowable deformation was then determined using the Fenner formulae and the monitored data in order to guide further construction, which received a good result. From this study, it can be concluded that providing quick strong initial support and reserving core soil at the working faceare extremely important to control the rock deformation and keep the tunnel stable.
文摘The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variation patterns of advance geological prediction data, stress-strain data of supporting struc- tures, and deformation data of the surrounding rock are vitally important in assessing the rationality and reliability of construction schemes, and provide essential information to ensure the safety and scheduling of tunnel construction, However, as the quantity of these data increases significantly, the uncertainty and discreteness of the mass data make it extremely difficult to produce a reasonable con- struction scheme; they also reduce the forecast accuracy of accidents and dangerous situations, creating huge challenges in tunnel construction safety, In order to solve this problem, a novel data service system is proposed that uses data-association technology and the NATM, with the support of a big data environ- ment, This system can integrate data resources from distributed monitoring sensors during the construc- tion process, and then identify associations and build relations among data resources under the same construction conditions, These data associations and relations are then stored in a data pool, With the development and supplementation of the data pool, similar relations can then he used under similar con- ditions, in order to provide data references for construction schematic designs and resource allocation, The proposed data service system also provides valuable guidance for the construction of similar projects.
基金financially supported by the Open Project of the State Key Laboratory of Disaster Reduction in Civil Engineering (Grant No. SLDRCE17-01)the National Key Research and Development Program of China (Grant No.2017YFC0805402)the National Natural Science Foundation of China (Grant No. 51808387)。
文摘This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST(upper tunneling(UT)). For this, a modified Peck formula was proposed to predict the surface settlement induced by TST. Next, three sets of finite element analyses(FEA) were used to compare the effects of construction sequences(i.e. UT, middle tunneling(MT), and lower tunneling(LT)) on vertical and lateral ground displacements. The results of Tianjin case and UT reveal that compared to a Gaussian distribution for a single tunnel, the surface settlement curve of triple stacked tunnels is a bimodal distribution. It seems that the proposed modified Peck formula can effectively predict the surface settlement induced by TST. The results of the three sets of FEA demonstrate that the construction sequence has a significant influence on the ground movement. Among the three construction sequences, the largest lateral displacement is observed in the MT and the smallest one in UT.The existing tunnel has an inhibitory effect on the vertical displacement. The maximum value of the lateral displacement occurs at the depth of the new tunnel in each construction sequence.
文摘Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported.
文摘Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications.
文摘The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction in the 21st century. Further suggestion is put forward on the effective use of tunneling machine.
文摘In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.
基金Supported by Project of China Railway 21 Bureau Group Co.,Ltd.(No.XJD20170815007)
文摘Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency.
基金Supported by the Special Fund of China Agricultural Research System(CARS-23)
文摘According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched steel tunnels in this area.
文摘With the increase in the number and scale of tunnel projects in China in recent years,the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more and more attention.Based on this,this paper analyzes the comprehensive management of quality inspection and monitoring during tunnel construction to ensure the quality of tunnel construction.
文摘In this paper, we conduct research on the causes and coping strategies of the land subsidence caused by the tunnel construction projects. We analyze the issues from the following of the perspectives. (1) Analysis method. To solve large scale system of the development of computer hardware and the numerical calculation method, we use the basic analysis to deal with it. (2) The empirical of methods. Ground motion is usually leads to the basic development of the inclined tunnel surface vertical displacement, the result of the movement process can turn to a settling tank. (3) Machine learning based approaches. In one of biggest difficulties when using neural network method is to obtain all possible parameters related to ground subsidence, we use the machine learning model to handle the challenge. In the final part, we show prospect for the future research, we will combine more numerical analysis tools to optimize the current methodology.
基金National Key R&D Program of China Special Funding(2017YFC0805305)National Natural Science Foundation of China(41601574)Chinese Academy of Engineering Institute-Local Cooperation Project(2019-CQ-ZD-4)。
文摘The biggest environmental problem caused by the construction of tunnels adjacent to high-rise buildings is the settlement of buildings.The paper analyzes the influence of tunnel excavation on the deformation of the superstructure and the deformation mode of the superstructure.It introduces the indicators and standards for the construction control of tunnel adjacent to the building at home and abroad.Combined with the Yuzhong tunnel project under construction in Chongqing,the main monitoring indicators and control standards of the Yuzhong Tunnel passing through the main buildings are given after comprehensive analysis and considerations,which provide a reference for the deformation control indicators of similar urban traffic tunnels adjacent to high-rise buildings.
文摘Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction.
基金National Key Research and Development Program(Research on Key Technologies for the Operation and Maintenance of Typical Urban Traffic Infrastructure Safety)(2017YFC0806000)Chinese Academy of Engineering Institute-Local Cooperation Project(2019-CQ-ZD-4)。
文摘Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high construction requirements.In view of the difficulties such as shallow buried depth of tunnel and small clear distance between tunnel and tower of high-voltage line,multiple excavation blasting method is adopted,and smooth blasting,charge quantity control and damping hole setting are comprehensively used to reduce the impact on the tower and structure of high-voltage line.In order to ensure the smooth progress of the project,the large-scale finite element analysis software is used to simulate the whole excavation project.The influence of the full-section method and the middle partition wall method(CD method)on the surrounding rock and the high-voltage electric tower is compared.It is found that the CD method can effectively control the displacement of the surrounding rock and the tower on it and the uneven settlement.
文摘With the rapid development of the transportation industry in China,the number and scale of tunnel construction are increasing.Tunneling through fault zones and other complex geological environments is becoming more and more common.In the construction of highway tunnels,due to the special geographical environment and complex geological conditions,mud and water inrush often occur in the tunnel.Water inrush disasters pose a major risk to the construction of highway tunnels and affect the normal construction of highway tunnels.This paper combines the engineering background of the tunnel mud and water inrush accidents,carries out evaluation on the accident treatment measures and the treatment efficiency,and summarizes the main concerns in the construction process and the technical guidelines for dealing with the tunnel mud and water inrush.