Various theories and analytical formulations were implemented and exploited in the 1980s and 1990s for the design of bridge beams or decks curved in the horizontal plane and subjected to out-of-plane loads. Nowadays, ...Various theories and analytical formulations were implemented and exploited in the 1980s and 1990s for the design of bridge beams or decks curved in the horizontal plane and subjected to out-of-plane loads. Nowadays, the Finite Element Method (FEM) is a valid tool for the analysis of structures with complex geometries and, therefore, the development of sophisticated analytical formulations is not needed anymore. However, they are still useful for the validation of FE models. This paper presents the case study of an existing viaduct built in North Italy, aiming to compare analytical approaches and numerical modelling. The bridge is characterized by an axis curved in two directions and a rectilinear segment. The global analysis of the viaduct is carried out with special attention to the attributes that cause torque action and bending moment. The theoretical developments focus on a deeper understanding of the torsional response under different constraint and loading conditions and aspire to raise awareness of the mutual interaction of flexural and torsional behaviour, that are always present in these complex curved systems. The examination of the case study is also obtained by comparing the response of isostatic and hyperstatic curvilinear steel box-girders.展开更多
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini...A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment.展开更多
针对当前地震动空间效应下曲线梁桥地震反应分析多采用确定性激励输入且忽略桥梁非线性的情况,采用了多维多点非平稳随机激励对曲线连续梁桥进行弹塑性响应分析。建立非线性有限元模型并降维解耦非平稳地震动非平稳演化功率谱(energy po...针对当前地震动空间效应下曲线梁桥地震反应分析多采用确定性激励输入且忽略桥梁非线性的情况,采用了多维多点非平稳随机激励对曲线连续梁桥进行弹塑性响应分析。建立非线性有限元模型并降维解耦非平稳地震动非平稳演化功率谱(energy power spectral density,EPSD)矩阵,采用绝对位移法对桥梁进行非线性时程分析。考虑不同视波速、场地条件、相干性以及平稳与非平稳地震激励,综合分析了曲线连续梁桥的随机响应及其频域特性和时域特性。结果表明,地震动空间效应和地震动的非平稳性对曲线梁桥随机响应影响很大,其中地震动空间效应对桥梁随机响应大小及其频域分布有显著影响,而非平稳性会对随机响应大小及其时变响应趋势产生重要影响。因此,在曲线连续梁桥抗震分析中需充分考虑地震动空间效应和地震动非平稳性,以避免错误估计桥梁抗震性能。提供了全面的分析结果,对加强曲线连续梁桥的抗震设计和评估,从而提高其抗震性能和可靠性具有重要意义。展开更多
文摘Various theories and analytical formulations were implemented and exploited in the 1980s and 1990s for the design of bridge beams or decks curved in the horizontal plane and subjected to out-of-plane loads. Nowadays, the Finite Element Method (FEM) is a valid tool for the analysis of structures with complex geometries and, therefore, the development of sophisticated analytical formulations is not needed anymore. However, they are still useful for the validation of FE models. This paper presents the case study of an existing viaduct built in North Italy, aiming to compare analytical approaches and numerical modelling. The bridge is characterized by an axis curved in two directions and a rectilinear segment. The global analysis of the viaduct is carried out with special attention to the attributes that cause torque action and bending moment. The theoretical developments focus on a deeper understanding of the torsional response under different constraint and loading conditions and aspire to raise awareness of the mutual interaction of flexural and torsional behaviour, that are always present in these complex curved systems. The examination of the case study is also obtained by comparing the response of isostatic and hyperstatic curvilinear steel box-girders.
基金Project(51178469) supported by the National Natural Science Foundation of China
文摘A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment.
文摘针对当前地震动空间效应下曲线梁桥地震反应分析多采用确定性激励输入且忽略桥梁非线性的情况,采用了多维多点非平稳随机激励对曲线连续梁桥进行弹塑性响应分析。建立非线性有限元模型并降维解耦非平稳地震动非平稳演化功率谱(energy power spectral density,EPSD)矩阵,采用绝对位移法对桥梁进行非线性时程分析。考虑不同视波速、场地条件、相干性以及平稳与非平稳地震激励,综合分析了曲线连续梁桥的随机响应及其频域特性和时域特性。结果表明,地震动空间效应和地震动的非平稳性对曲线梁桥随机响应影响很大,其中地震动空间效应对桥梁随机响应大小及其频域分布有显著影响,而非平稳性会对随机响应大小及其时变响应趋势产生重要影响。因此,在曲线连续梁桥抗震分析中需充分考虑地震动空间效应和地震动非平稳性,以避免错误估计桥梁抗震性能。提供了全面的分析结果,对加强曲线连续梁桥的抗震设计和评估,从而提高其抗震性能和可靠性具有重要意义。