It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution i...It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution in the coal body and the corresponding lump coal formation mechanism,was performed in PFC2D.Moreover,a correlation was established between the cutting force and lump coal formation,and a statistical analysis method was proposed to determine the lump coal rate.The following conclusions are drawn from the results:(1)Based on a soft ball model,a coal wall cutting model is established.By setting the roller parameters based on linear bonding and simulating the roller cutting process of the coal body,the coal wall cutting process is effectively simulated,and accurate lump coal rate statistics are provided.(2)Under the cutting stress,the coal body in the working face underwent three stages—microfracture generation,fracture expansion,and fracture penetration—to form lump coal,in which the fracture direction is orthogonal to the cutting pressure chain.Within a certain range from the roller,as the cutting depth of the roller increased,the number of new fractures in the coal body first increases and then stabilizes.(3)Under the cutting stress,the fractured coal body is locally compressed,thereby forming a compact core.The formation and destruction of the compact core causes fluctuations in the cutting force.The fluctuation amplitude is positively related to the coal mass.(4)Because the simulation does not consider secondary damage in the coal,the simulated lump coal rate is larger than the actual lump coal rate in the working face;this deviation is mainly concentrated in large lump coal with a diameter greater than 300 mm.展开更多
The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established corresponding...The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.展开更多
To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit...To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit.The existing research shows that the surrounding rock of the roadway has self-stability,and the early or late support is not conducive to the safe and reliable support of the roadway,so there is a problem of support opportunity.In order to study the supporting effect and the optimal supporting time of the above solution,we established the mechanical coupling model of surrounding rock and advance support,and investigated the surrounding rock deformation and advance support pressure distribution under different reserved roof subsidence by using the numerical simulation software FLAC3D.The results show that the deformation of surrounding rock increases and finally tends to a stable level with the increase of pre settlement of roadway roof,and when the pre settlement of roof is between 8-15 mm,the vertical pressure of the top beam of advance support reaches the minimum value,about 0.58 MPa.Based on the above research,we put forward the optimum supporting time in roadway excavation,and summarized the evaluation method based on the mechanical coupling model of surrounding rock-advance support.展开更多
基金The funding was supported by National Natural Science Foundation of China(No.51974294).
文摘It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution in the coal body and the corresponding lump coal formation mechanism,was performed in PFC2D.Moreover,a correlation was established between the cutting force and lump coal formation,and a statistical analysis method was proposed to determine the lump coal rate.The following conclusions are drawn from the results:(1)Based on a soft ball model,a coal wall cutting model is established.By setting the roller parameters based on linear bonding and simulating the roller cutting process of the coal body,the coal wall cutting process is effectively simulated,and accurate lump coal rate statistics are provided.(2)Under the cutting stress,the coal body in the working face underwent three stages—microfracture generation,fracture expansion,and fracture penetration—to form lump coal,in which the fracture direction is orthogonal to the cutting pressure chain.Within a certain range from the roller,as the cutting depth of the roller increased,the number of new fractures in the coal body first increases and then stabilizes.(3)Under the cutting stress,the fractured coal body is locally compressed,thereby forming a compact core.The formation and destruction of the compact core causes fluctuations in the cutting force.The fluctuation amplitude is positively related to the coal mass.(4)Because the simulation does not consider secondary damage in the coal,the simulated lump coal rate is larger than the actual lump coal rate in the working face;this deviation is mainly concentrated in large lump coal with a diameter greater than 300 mm.
文摘The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.
基金National Key Basic Research and Development Program Fund project(Grant No.2014CB046306)the Central University Funding Project for Basic Scientific Research Operations(Grant No.2009QJ16)
文摘To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit.The existing research shows that the surrounding rock of the roadway has self-stability,and the early or late support is not conducive to the safe and reliable support of the roadway,so there is a problem of support opportunity.In order to study the supporting effect and the optimal supporting time of the above solution,we established the mechanical coupling model of surrounding rock and advance support,and investigated the surrounding rock deformation and advance support pressure distribution under different reserved roof subsidence by using the numerical simulation software FLAC3D.The results show that the deformation of surrounding rock increases and finally tends to a stable level with the increase of pre settlement of roadway roof,and when the pre settlement of roof is between 8-15 mm,the vertical pressure of the top beam of advance support reaches the minimum value,about 0.58 MPa.Based on the above research,we put forward the optimum supporting time in roadway excavation,and summarized the evaluation method based on the mechanical coupling model of surrounding rock-advance support.