Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and econom...Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and economic operation for nuclear power plants( NPPs) especially for a large number of nuclear powers under construction. Based on the development and application of maintenance template in developed countries,and combining with reliability-centered maintenance( RCM) analysis results and maintenance experience data over the past ten years in domestic NPPs, the development process of maintenance template was presented for Chinese pressurized water reactor( PWR) NPP,and the application of maintenance template to maintenance program development and maintenance optimization combined with cases were demonstrated. A shortcut was provided for improving the efficiency of maintenance optimization in domestic PWR NPP,and help to realize a safe,reliable,and economic operation for domestic NPPs.展开更多
Taking the project of introducing reliability-centered maintenance( RCM) into maintenance decision in an AP1000 nuclear power plant( NPP) under construction as the research object,an improved RCM methodology was propo...Taking the project of introducing reliability-centered maintenance( RCM) into maintenance decision in an AP1000 nuclear power plant( NPP) under construction as the research object,an improved RCM methodology was proposed, and the application software and an RCM-based maintenance strategies management system were designed. In the pilot project,the RCMbased maintenance decision methodology had been applied to determining the maintenance strategies for two systems. Both the decision process and the results were described in this paper. The achievements of this project promoted the introduction and routinization of an advanced and effective maintenance decision mode in nuclear power field,which could provide valuable reference for new NPPs in China.展开更多
The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check...The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check- up plan, all of the present guide tubes of the control rods in Unit I will be replaced by the type of state-of-the-art tubes used in Unit 2, to make the dropping-time of the tubes more accurate. The annual check may take 80 days, thus the unit will probably re-connect with the power grid in mid June. As for Unit 2, the "exciter" of generator malfunctioned during the start of the reactor on March 6, when the second refueling and maintenance neared completion.展开更多
文摘Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and economic operation for nuclear power plants( NPPs) especially for a large number of nuclear powers under construction. Based on the development and application of maintenance template in developed countries,and combining with reliability-centered maintenance( RCM) analysis results and maintenance experience data over the past ten years in domestic NPPs, the development process of maintenance template was presented for Chinese pressurized water reactor( PWR) NPP,and the application of maintenance template to maintenance program development and maintenance optimization combined with cases were demonstrated. A shortcut was provided for improving the efficiency of maintenance optimization in domestic PWR NPP,and help to realize a safe,reliable,and economic operation for domestic NPPs.
文摘Taking the project of introducing reliability-centered maintenance( RCM) into maintenance decision in an AP1000 nuclear power plant( NPP) under construction as the research object,an improved RCM methodology was proposed, and the application software and an RCM-based maintenance strategies management system were designed. In the pilot project,the RCMbased maintenance decision methodology had been applied to determining the maintenance strategies for two systems. Both the decision process and the results were described in this paper. The achievements of this project promoted the introduction and routinization of an advanced and effective maintenance decision mode in nuclear power field,which could provide valuable reference for new NPPs in China.
文摘The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check- up plan, all of the present guide tubes of the control rods in Unit I will be replaced by the type of state-of-the-art tubes used in Unit 2, to make the dropping-time of the tubes more accurate. The annual check may take 80 days, thus the unit will probably re-connect with the power grid in mid June. As for Unit 2, the "exciter" of generator malfunctioned during the start of the reactor on March 6, when the second refueling and maintenance neared completion.