The Cemented Material Dam: A New, Environmentally Friendly Type of Dam 被引量:24
1
作者 Jinsheng Jia Michel Lino +1 位作者 Feng Jin Cuiying Zheng 《Engineering》 SCIE EI 2016年第4期490-497,共8页
The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area d... The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area downstream. The concept covers the cemented sand, gravel, and rock dam (CSGRD), the rockfill concrete (RFC) dam (or the cemented rockfill dam, CRD), and the cemented soil dam (CSD). This paper summarizes the concept and principles of the CMD based on studies and practices in projects around the world. It also introduces new developments in the CSGRD, CRD, and CSD. 展开更多
关键词 Cemented material dam Cemented sand gravel and rock dam Rockfill concrete dam Cemented rockfill dam Cemented soil dam Material properties
下载PDF
Causes of the Abnormal Seepage Field in a Dam with Asphaltic Concrete Core
2
作者 Jiafa Zhang Jinlong Wang Haodong Cui 《Journal of Earth Science》 SCIE CAS CSCD 2016年第1期74-82,共9页
Asphaltic concrete core(ACC) dams are widely built in China. Many ACC dams perform well, but others have experienced significant leakage including the case in western China studied herein. A numerical model of satur... Asphaltic concrete core(ACC) dams are widely built in China. Many ACC dams perform well, but others have experienced significant leakage including the case in western China studied herein. A numerical model of saturated-unsaturated water flow was adapted to simulate the seepage through the dam. By comparing the normal and abnormal seepage fields under different conditions, the main causes for the actual abnormal seepage field were identified and attributed to a defect in the ACC and an unintended, low permeability layer(LPL) in the transition zone(TZ) and the downstream dam shell. These conclusions are consistent with the situation and performance of the dam. Inadequate ACC construction processes might have caused defects in the ACC. An abrupt change of the ACC thickness probably induced stress concentrations and caused the ACC to fail. Material sources for the TZ and dam shell were complex and varied from specifications, and soil gradation for the TZ was inadequately controlled. In particular, tests show that the permeability varies over large ranges in these two parts of the dam. An unexpected LPL probably exists in both areas, and extends continuously. 展开更多
关键词 MODELING dam leakage dam material PERMEABILITY hydraulic gradient.