期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Daya Bay Nuclear Power plant put under maintenance
1
《Electricity》 1996年第1期54-54,共1页
The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check... The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check- up plan, all of the present guide tubes of the control rods in Unit I will be replaced by the type of state-of-the-art tubes used in Unit 2, to make the dropping-time of the tubes more accurate. The annual check may take 80 days, thus the unit will probably re-connect with the power grid in mid June. As for Unit 2, the "exciter" of generator malfunctioned during the start of the reactor on March 6, when the second refueling and maintenance neared completion. 展开更多
关键词 bay WORK daya bay nuclear power plant put under maintenance
下载PDF
Daya Bay Nuclear Power Plant passed the State's check and acceptance
2
《Electricity》 1997年第1期50-50,共1页
关键词 bay daya bay nuclear power plant passed the State’s check and acceptance
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部