Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detect...Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detection(DPD)system consisting of a multifunctional sensor and a pilot geophone installed at the top of the drilling rod,geophones at the tunnel face,a laser rangefinder,and an onsite computer.A weighted adjoint-state first arrival travel time tomography method is used to invert the P-wave velocity field of rock mass while borehole drilling.A field experiment in the ongoing construction of a deep buried tunnel in southwestern China demonstrated the DPD system and the tomography method.Time-frequency analysis of typical borehole drilling detection data shows that the impact drilling source is a pulse-like seismic exploration wavelet.A velocity field of the rock mass in a triangular area defined by the borehole trajectory and geophone receiving line can be obtained.Both the borehole core and optical image validate the inverted P-wave velocity field.A numerical simulation of a checkerboard benchmark model is used to test the tomography method.The rapid convergence of the misfits and consistent agreement between the inverted and observed travel times validate the P-wave velocity imaging.展开更多
Estimation of support pressure is extremely important to the support system design and the construction safety of tunnels.At present,there are many methods for the estimation of support pressure based on different roc...Estimation of support pressure is extremely important to the support system design and the construction safety of tunnels.At present,there are many methods for the estimation of support pressure based on different rock mass classification systems,such as Q system,GSI system and RMR system.However,various rock mass classification systems are based on different tunnel geologic conditions in various regions.Therefore,each rock mass classification system has a certain regionality.In China,the BQ-Inex(BQ system)has been widely used in the field of rock engineering ever since its development.Unfortunately,there is still no estimation method of support pressure with BQ-index as parameters.Based on the field test data from 54 tunnels in China,a new empirical method considering BQ-Inex,tunnel span and rock weight is proposed to estimate the support pressure using multiple nonlinear regression analysis methods.And then the significance and necessity of support pressure estimation method for the safety of tunnel construction in China is explained through the comparison and analysis with the existing internationally widely used support pressure estimation methods of RMR system,Q system and GSI system.Finally,the empirical method of estimating the support pressure based on BQ-index was applied to designing the support system in the China’s high-speed railway tunnel—Zhengwan high-speed railway and the rationality of this method has been verified through the data of field test.展开更多
In the geostress measurement for Niba Mountain on Ya'an-Lugu Expressway, results of Kaiser effect tests combined with focal mechanism solution were compared with those obtained by hydraulic fracturing method, both of...In the geostress measurement for Niba Mountain on Ya'an-Lugu Expressway, results of Kaiser effect tests combined with focal mechanism solution were compared with those obtained by hydraulic fracturing method, both of which are basically coincident. It is shown that the principal stress increases with burial depth ; the maximum principal stress is about 45 MPa, which is larger near fault zones because of stress concentration, and its direction ranges from N20°W to N75°W.展开更多
Combined with highway construction, the analysis on the relationship betweentunnel construction and coal resource exploitation was processed, which was based onthe research of rational exploitation depth of coal.3D FE...Combined with highway construction, the analysis on the relationship betweentunnel construction and coal resource exploitation was processed, which was based onthe research of rational exploitation depth of coal.3D FEM numerical analysis for tunnelexcavation was carried out according to engineering geological features of coal measurestrata in the project area.Based on the analysis of displacement and stress of the surroundingrock in the tunnel after excavation, the characteristics for displacement andstress of the tunnel support structure were analyzed when the underlying coal bed wasexploited with sublevel and full caving method.In addition, combined with the related codeand standard, the economic and safe prohibiting exploited depth of the underlying coalbed was proposed, so that a scientific basis for tunnel construction of coal measure strataand reasonable exploitation of the mineral resources in complex geological conditions canbe offered.展开更多
基金the support of the National Natural Science Foundation of China(Nos.42207211,42202320 and 42172296)Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University(No.KLE-TJGE-G2304).
文摘Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detection(DPD)system consisting of a multifunctional sensor and a pilot geophone installed at the top of the drilling rod,geophones at the tunnel face,a laser rangefinder,and an onsite computer.A weighted adjoint-state first arrival travel time tomography method is used to invert the P-wave velocity field of rock mass while borehole drilling.A field experiment in the ongoing construction of a deep buried tunnel in southwestern China demonstrated the DPD system and the tomography method.Time-frequency analysis of typical borehole drilling detection data shows that the impact drilling source is a pulse-like seismic exploration wavelet.A velocity field of the rock mass in a triangular area defined by the borehole trajectory and geophone receiving line can be obtained.Both the borehole core and optical image validate the inverted P-wave velocity field.A numerical simulation of a checkerboard benchmark model is used to test the tomography method.The rapid convergence of the misfits and consistent agreement between the inverted and observed travel times validate the P-wave velocity imaging.
基金Projects(51878567,51878568,51578458)supported by the National Natural Science Foundation of ChinaProjects(2017G007-F,2017G007-H)supported by China Railway Science and Technology Research and Development Plan。
文摘Estimation of support pressure is extremely important to the support system design and the construction safety of tunnels.At present,there are many methods for the estimation of support pressure based on different rock mass classification systems,such as Q system,GSI system and RMR system.However,various rock mass classification systems are based on different tunnel geologic conditions in various regions.Therefore,each rock mass classification system has a certain regionality.In China,the BQ-Inex(BQ system)has been widely used in the field of rock engineering ever since its development.Unfortunately,there is still no estimation method of support pressure with BQ-index as parameters.Based on the field test data from 54 tunnels in China,a new empirical method considering BQ-Inex,tunnel span and rock weight is proposed to estimate the support pressure using multiple nonlinear regression analysis methods.And then the significance and necessity of support pressure estimation method for the safety of tunnel construction in China is explained through the comparison and analysis with the existing internationally widely used support pressure estimation methods of RMR system,Q system and GSI system.Finally,the empirical method of estimating the support pressure based on BQ-index was applied to designing the support system in the China’s high-speed railway tunnel—Zhengwan high-speed railway and the rationality of this method has been verified through the data of field test.
基金Western Region Transportation Scientificand Technological Project of Transportation Ministry(No.2006318000104)Graduate Innovation Fund of South-west Jiaotong University in 2008
文摘In the geostress measurement for Niba Mountain on Ya'an-Lugu Expressway, results of Kaiser effect tests combined with focal mechanism solution were compared with those obtained by hydraulic fracturing method, both of which are basically coincident. It is shown that the principal stress increases with burial depth ; the maximum principal stress is about 45 MPa, which is larger near fault zones because of stress concentration, and its direction ranges from N20°W to N75°W.
基金Supported by the National Natural Science Foundation Special Originality Innovation Research Colony of China(50621403)
文摘Combined with highway construction, the analysis on the relationship betweentunnel construction and coal resource exploitation was processed, which was based onthe research of rational exploitation depth of coal.3D FEM numerical analysis for tunnelexcavation was carried out according to engineering geological features of coal measurestrata in the project area.Based on the analysis of displacement and stress of the surroundingrock in the tunnel after excavation, the characteristics for displacement andstress of the tunnel support structure were analyzed when the underlying coal bed wasexploited with sublevel and full caving method.In addition, combined with the related codeand standard, the economic and safe prohibiting exploited depth of the underlying coalbed was proposed, so that a scientific basis for tunnel construction of coal measure strataand reasonable exploitation of the mineral resources in complex geological conditions canbe offered.