Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or t...Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or the surrounding existing infrastructure around it. This article overviews the risk control practice of foundation pit excavation projects in close proximity to <span style="font-family:Verdana;">existing</span><span style="font-family:Verdana;"> disconnected piled raft. More focus is given to geotechnical aspects. The review begins with achievements to ensure excavation performance </span><span style="font-family:Verdana;">requirements,</span><span style="font-family:Verdana;"> and follows to discuss the complex </span><span style="font-family:Verdana;">soil structure</span><span style="font-family:Verdana;"> interaction involved among the fundamental components</span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">: </span></span></span><span><span><span style="font-family:;" "=""><span style="font-family:Verdana;">the retaining wall, mat, piles, cushion, and the soil. After bringing consensus points to practicing engineers and </span><span style="font-family:Verdana;">decision makers</span><span style="font-family:Verdana;">, it then suggests possible future research directions.</span></span></span></span>展开更多
Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example t...Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.展开更多
In order to ensure the construction safety of the 38.5 m deep excavation for the gravity anchorage foundation of Fuma Yangtze River Bridge, an intelligent feedback analysis was applied to this excavation project. Firs...In order to ensure the construction safety of the 38.5 m deep excavation for the gravity anchorage foundation of Fuma Yangtze River Bridge, an intelligent feedback analysis was applied to this excavation project. First, a three-dimensional numerical model that simulating the construction process of the excavation was built,and the deformations of the supporting structures were calculated by the finite difference program FLAC3 D. Then,the non-linear mapping relationship between the geomechanical parameters and the excavation-induced displacements was established by the back-propagation neural network(BPNN). Last,the geomechanical parameters were optimized intelligently by the genetic algorithm(GA) based on the developed BPNN model and the measured displacements,and the deformations during the subsequent excavation stages were predicted based on the back-calculated parameters. The research results showed that:the back-calculated values of E1,μ1,c1,and φ1 of the completely weathered stratum,and E2 of the heavily weathered stratum were greater than the initial values,while the inversion value of E3 of the moderately weathered stratum was smaller than the initial value. The magnitudes and the variation tendencies of the predicted displacements were in good accordance with the measured displacements. At the end of the excavation,the retaining piles and the top beams had a maximum displacement of 15–20 mm,exhibiting a quite small magnitude as comparing with other case histories. Local concentration of shear stress mainly occurred at the soil-pile interface and at the toe of the excavation slope,and the plastic zones mainly appeared in the completely weathered stratum. After the completion of the excavation,there were no yielding elements in the model,and the convergence of the numerical computation was achieved,indicating the excavation was in a stable state. This study lays the basis for the subsequent construction and operation of the bridge,and offers a significant reference for the feedback analysis of similar anchorage excavation projects.展开更多
文摘Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or the surrounding existing infrastructure around it. This article overviews the risk control practice of foundation pit excavation projects in close proximity to <span style="font-family:Verdana;">existing</span><span style="font-family:Verdana;"> disconnected piled raft. More focus is given to geotechnical aspects. The review begins with achievements to ensure excavation performance </span><span style="font-family:Verdana;">requirements,</span><span style="font-family:Verdana;"> and follows to discuss the complex </span><span style="font-family:Verdana;">soil structure</span><span style="font-family:Verdana;"> interaction involved among the fundamental components</span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">: </span></span></span><span><span><span style="font-family:;" "=""><span style="font-family:Verdana;">the retaining wall, mat, piles, cushion, and the soil. After bringing consensus points to practicing engineers and </span><span style="font-family:Verdana;">decision makers</span><span style="font-family:Verdana;">, it then suggests possible future research directions.</span></span></span></span>
文摘Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.
文摘In order to ensure the construction safety of the 38.5 m deep excavation for the gravity anchorage foundation of Fuma Yangtze River Bridge, an intelligent feedback analysis was applied to this excavation project. First, a three-dimensional numerical model that simulating the construction process of the excavation was built,and the deformations of the supporting structures were calculated by the finite difference program FLAC3 D. Then,the non-linear mapping relationship between the geomechanical parameters and the excavation-induced displacements was established by the back-propagation neural network(BPNN). Last,the geomechanical parameters were optimized intelligently by the genetic algorithm(GA) based on the developed BPNN model and the measured displacements,and the deformations during the subsequent excavation stages were predicted based on the back-calculated parameters. The research results showed that:the back-calculated values of E1,μ1,c1,and φ1 of the completely weathered stratum,and E2 of the heavily weathered stratum were greater than the initial values,while the inversion value of E3 of the moderately weathered stratum was smaller than the initial value. The magnitudes and the variation tendencies of the predicted displacements were in good accordance with the measured displacements. At the end of the excavation,the retaining piles and the top beams had a maximum displacement of 15–20 mm,exhibiting a quite small magnitude as comparing with other case histories. Local concentration of shear stress mainly occurred at the soil-pile interface and at the toe of the excavation slope,and the plastic zones mainly appeared in the completely weathered stratum. After the completion of the excavation,there were no yielding elements in the model,and the convergence of the numerical computation was achieved,indicating the excavation was in a stable state. This study lays the basis for the subsequent construction and operation of the bridge,and offers a significant reference for the feedback analysis of similar anchorage excavation projects.