期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
FINITE ELEMENT NUMERICAL SIMULATION OF THREE-DIMENSIONAL SEEPAGE CONTROL FOR DEEP FOUNDATION PIT DEWATERING 被引量:44
1
作者 LUO Zu-jiang ZHANG Ying-ying WU Yong-xia 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期596-602,共7页
For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In... For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In this work, a three-dimensional finite element simulation method was applied in the forth subway of Dongjiadu tunnel repair foundation pit dewatering in Shanghai. In order to control the decrease of the underground water level around the foundation pit, the foundation pit dewatering method was used to design the optimization project of dewatering ,which was simulated under these conditions that the aquifers deposited layer by layer, the bottom of the aquifers went deep to 144.45 m, the retaining wall of foundation pit shield went deep to 65 m, the filters of the extraction wells were located between 44 m to 59 m, the water level in the deep foundation pit was decreased by 34 m, and the maximum decrease of water level outside the foundation pit was 3 m. It is shown that the optimization project and the practical case are consistent with each other. Accordingly, the three-dimensional finite element numerical simulation is the basic theory of optimization design of engineering structures of dewatering in deep foundation pit in such areas. 展开更多
关键词 Yangtze River Delta land subsidence deep foundation pit dewatering seepage control
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部